This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Statutory Instruments
Infrastructure Planning
Made
25th October 2023
Coming into force
26th October 2023
An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008( 1) to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011( 2) for a non-material change to the West Midlands Rail Freight Interchange Order 2020( 3).
The Secretary of State, having considered the application and the responses to the publicity and consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the West Midlands Rail Freight Interchange Order 2020.
The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 to the Planning Act 2008, makes the following Order—
1. This Order may be cited as the West Midlands Rail Freight Interchange (Amendment) Order 2023 and comes into force on 26th October 2023.
2.—(1) The West Midlands Rail Freight Interchange Order 2020 is amended as follows.
(2) In article 4 (parameters of authorised development)—
(a) at the end of sub-paragraph (a) insert “and in respect of new onsite road infrastructure (comprised in Work Nos. 4, 5, 7 and 10) deviate vertically from the levels shown on the parameters plans to the extent stated in the note to those plans”; and
(b) for sub-paragraph (b) substitute—
“(b) in respect of bridges—
(i) deviate vertically from the levels shown highlighted yellow on the bridge plans to a maximum of 0.5 metres upwards or 1.0 metres downwards; and
(ii) deviate laterally from the position of the bridge abutments shown on the bridge plans to the maximum extent described and shown highlighted blue on the bridge plans; and ”.
(3) For the table in Schedule 15 (certification documents) substitute the table shown in the Schedule.
Signed by authority of the Secretary of State for Transport
Gareth Leigh
Head of Transport and Works Act Orders Unit
Department for Transport
25th October 2023
Article 2(3)
1. Documents for certification that they are true copies of the documents referred to in this Order
(1) Document/Plan |
(2) Document Number |
(3) Document date/Plan number with revision number |
---|---|---|
Access and rights of way plans | ||
Key plan | 2.3 | WSP-70001979-SK-060 Rev I |
Sheet 1 | 2.3A | WSP-70001979-SK-060 Rev H |
Sheet 2 | 2.3B | WSP-70001979-SK-060 Rev G |
Sheet 3 | 2.3C | WSP-70001979-SK-060 Rev F |
Sheet 4 | 2.3D | WSP-70001979-SK-060 Rev F |
Sheet 5 | 2.3E | WSP-70001979-SK-060 Rev F |
Sheet 6 | 2.3F | WSP-70001979-SK-060 Rev F |
Sheet 7 | 2.3G | WSP-70001979-SK-060 Rev B |
The book of reference | 4.3B | 21 August 2019 |
The bridge plans | ||
Proposed road bridges plan and long section | 2.18A | 1516-0425-WDK-SI-C-301-010 Rev P11 |
Road Bridge B1 | 2.18B | 1516-0425-WDK-SI-C-301-006 Rev P14 |
Road Bridge B2 and B3 | 2.18C | 1516-0425-WDK-SI-C-300-007 Rev P14 |
Proposed road bridge B4 section and elevation | 2.18D | 1516-0425-WDK-SI-C-301-008 Rev P17 |
The design and access statement | 7.5 | 3 August 2018 |
The environmental statement | 6.2 |
3 August 2018 (subject to the substitutions set out below): (i) Figures 10.001, 10.002, 10.003 and 10.004 – 12 September 2018 (ii) Annex 10.1.1 – 12 September 2018 |
(iii) Addendum to Chapter 13 (Noise and Vibration) – 5 April 2019 (iv) Appendix I to Transport Assessment (Appendix 15.1) (Site Wide HGV Management Plan) – 7 May 2019 (v) Appendix H to Transport Assessment (Appendix 15.1) (Site Wide Travel plan) – 5 July 2019 (vi) Appendix 2.3 (Outline Demolition and Construction Management Plan) – 5 July 2019 (vii) Appendix 10.4 (Framework Ecological Mitigation and Management Plan) – 5 July 2019 (viii) Updated Chapter 7 (Air Quality) and Appendices 7.2, 7.3, 7.4, 7.6 and 7.7 – 7 August 2019 | ||
The future highways maintenance plans | ||
Key Plan | 2.10 | WSP-70001979-SK-091 Rev F |
Sheet 1 | 2.10A | WSP-70001979-SK-091 Rev F |
Sheet 2 | 2.10B | WSP-70001979-SK-091 Rev C |
Sheet 3 | 2.10C | WSP-70001979-SK-091 Rev C |
The highway classification plans | ||
Key Plan | 2.13 | WSP-70001979-SK-068 Rev I |
Sheet 1 | 2.13A | WSP-70001979-SK-068 Rev H |
Sheet 2 | 2.13B | WSP-70001979-SK-068 Rev E |
Sheet 3 | 2.13C | WSP-70001979-SK-068 Rev E |
The highway general arrangement plans | ||
Key Plan/Highway Masterplan | 2.9 | WSP-70001979-GA-100 Rev M |
General Arrangement Plan 101 | 2.9A | WSP-70001979-GA-101 Rev E |
General Arrangement Plan 102 | 2.9B | WSP-70001979-GA-102 Rev E |
General Arrangement Plan 103 | 2.9C | WSP-70001979-GA-103 Rev I |
General Arrangement Plan 104 | 2.9D | WSP-70001979-GA-104 Rev M |
General Arrangement Plan 105 | 2.9E | WSP-70001979-GA-105 Rev E |
General Arrangement Plan 106 | 2.9F | WSP-70001979-GA-106 Rev G |
General Arrangement Plan 107 | 2.9G | WSP-70001979-GA-107 Rev H |
General Arrangement Plan 108 | 2.9H | WSP-70001979-GA-108 Rev F |
General Arrangement Plan 109 | 2.9I | WSP-70001979-GA-109 Rev G |
General Arrangement Plan 110 | 2.9J | WSP-70001979-GA-110 Rev H |
General Arrangement Plan 111 | 2.9K | WSP-70001979-GA-111 Rev H |
The land plans | ||
Key Plan | 2.1 | Key Plan v1 |
Sheet 1 | 2.1A | Sheet 1 of 12 v0 |
Sheet 2 | 2.1B | Sheet 2 of 12 v0 |
Sheet 3 | 2.1C | Sheet 3 of 12 v0 |
Sheet 4 | 2.1D | Sheet 4 of 12 v1 |
Sheet 5 | 2.1E | Sheet 5 of 12 v0 |
Sheet 6 | 2.1F | Sheet 6 of 12 v0 |
Sheet 7 | 2.1G | Sheet 7 of 12 v0 |
Sheet 8 | 2.1H | Sheet 8 of 12 v0 |
Sheet 9 | 2.1I | Sheet 9 of 12 v0 |
Sheet 10 | 2.1J | Sheet 10 of 12 v0 |
Sheet 11 | 2.1K | Sheet 11 of 12 v0 |
Sheet 12 | 2.1L | Sheet 12 of 12 v0 |
Order limits plan | 2.4 | 4990-00011 Rev 06 |
The parameters plans | ||
Development Zone Parameters Plan | ||
Key Plan | 2.5 | 4990-02000 Rev 08 |
Sheet 1 | 2.5A | 4990-02001 Rev 08 |
Sheet 2 | 2.5B | 4990-02002 Rev 08 |
Sheet 3 | 2.5C | 4990-02003 Rev 09 |
Sheet 4 | 2.5D | 4990-02004 Rev 07 |
Floor Levels and Building Heights Parameters Plan | ||
Key Plan | 2.6 | 4990-02010 Rev 08 |
Sheet 1 | 2.6A | 4990-02011 Rev 07 |
Sheet 2 | 2.6B | 4990-02012 Rev 07 |
Sheet 3 | 2.6C | 4990-02013 Rev 08 |
Sheet 4 | 2.6D | 4990-02014 Rev 07 |
Green Infrastructure Parameters Plan | ||
Key Plan | 2.7 | 4990-02020 Rev 11 |
Sheet 1 | 2.7A | 4990-02021 Rev 10 |
Sheet 2 | 2.7B | 4990-02022 Rev 10 |
Sheet 3 | 2.7C | 4990-02023 Rev 11 |
Sheet 4 | 2.7D | 4990-02024 Rev 09 |
The illustrative arrangement of railway alignment | 2.14 | TRS-DRG-FA-001003 Rev 05 |
The rail terminal – illustrative expanded rail terminal layout plan | 2.15B | TRS-DRG-FA-001010 Rev 04 |
The rail section plans | ||
Rail Alignment Cross Sections – Sheet 1 | 2.16A | TRS-DRG-FA-001005 Rev 02 |
Rail Alignment Cross Sections – Sheet 2 | 2.16B | TRS-DRG-FA-001006 Rev 03 |
Rail Alignment Cross Sections – Sheet 3 | 2.16C | TRS-DRG-FA-001007 Rev 02 |
Long sections rail alignment Sheet 1 | 2.16D | TRS-DRG-FA-001004 Rev 02 |
Long sections rail alignment Sheet 2 | 2.16E | TRS-DRG-FA-001008 Rev 02 |
The speed limit plans | ||
Key Plan | 2.12 | WSP-70001979-SK-062 Rev I |
Sheet 1 | 2.12A | WSP-70001979-SK-062 Rev K |
Sheet 2 | 2.12B | WSP-70001979-SK-062 Rev F |
Sheet 3 | 2.12C | WSP-70001979-SK-062 Rev E |
SI facility plan | 2.20 | 01 |
The traffic regulation plans | ||
Key Plan | 2.11 | WSP-70001979-SK-061 Rev I |
Sheet 1 | 2.11A | WSP-70001979-SK-061 Rev H |
Sheet 2 | 2.11B | WSP-70001979-SK-061 Rev E |
Sheet 3 | 2.11C | WSP-70001979-SK-061 Rev F |
Sheet 4 | 2.11D | WSP-70001979-SK-061 Rev A |
The works plans | ||
Key Plan | 2.2 | Key Plan v3.0 |
Sheet 1 | 2.2A | Sheet 1 of 9 v3.0 |
Sheet 2 | 2.2B | Sheet 2 of 9 v3.0 |
Sheet 3 | 2.2C | Sheet 3 of 9 v1 |
Sheet 4 | 2.2D | Sheet 4 of 9 v1 |
Sheet 5 | 2.2E | Sheet 5 of 9 v1 |
Sheet 6 | 2.2F | Sheet 6 of 9 v3.0 |
Sheet 7 | 2.2G | Sheet 7 of 9 v1 |
Sheet 8 | 2.2H | Sheet 8 of 9 v1 |
Sheet 9 | 2.2I | Sheet 9 of 9 v1 |
(This note is not part of the Order)
This Order amends the West Midlands Rail Freight Interchange Order 2020 ( S.I. 2020/511) (“ the 2020 Order”), a development consent order under the Planning Act 2008 (“ the Act”).
This Order follows an application under paragraph 2 of Schedule 6 to the Act to make the following non-material changes to the 2020 Order—
(a) the parameters of the authorised development in article 4(a) are amended to provide for vertical deviation in respect of the new onsite road infrastructure from the levels shown and described on the parameters plans;
(b) the parameters of the authorised development in article 4(b) are amended to provide for lateral deviation from the position of the bridge abutments shown on the bridge plans to the maximum extent shown highlighted blue on the bridge plans;
(c) the table in Schedule 15 is substituted with the table shown in the Schedule to provide an updated list of the certified documents that relate to the 2020 Order as amended by this Order.
A copy of the substituted plans mentioned in this Order may be inspected free of charge during working hours at the offices of South Staffordshire Council at Wolverhampton Road, Codsall, Wolverhampton, WV8 1PX.
2008 c. 29. Paragraph 2 of Schedule 6 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23), by paragraph 72 of Schedule 13 and paragraph 1 of Schedule 25 to the Localism Act 2011 (c. 20)and by section 28 of the Infrastructure Act 2015 (c. 7).
S.I. 2011/2055, as amended by S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2015/377, S.I. 2015/760, S.I. 2015/1682, S.I. 2017/314, S.I. 2017/524, S.I. 2018/378, S.I. 2019/734, S.I. 2020/764and S.I. 2020/1534.
S.I. 2020/511amended by S.I. 2020/1163.