Made | 22nd May 2007 | ||
Laid before Parliament | 25th May 2007 | ||
Coming into force | 22nd June 2007 |
1. | Citation and commencement |
2. | Interpretation etc. |
3. | Application of the Regulations |
4. | Designation of administrative authority |
5. | Duties of administrative authority |
6. | Administrative authority – duty to compile accident and fire reports |
7. | Administrative authority – suspension or restriction of use of a road tunnel |
8. | Designation of the tunnel manager |
9. | Duties of the tunnel manager |
10. | Designation of the Safety Officer |
11. | Duties of Safety Officers |
12. | Appointment of inspection entity |
13. | Duties of inspection entity |
14. | Appointment and duties of the technical approval authority |
15. | Road Tunnels already in operation |
16. | Safety Requirements to be met by road tunnels |
17. | Risk Reduction Measures |
18. | Risk Analysis |
19. | Derogations for innovative techniques |
20. | Application of Regulations where the same body undertakes functions of different authorities |
21. | Notification to the Commission |
SCHEDULE | Signing for tunnels |
Application of the Regulations
3.
These Regulations apply in relation to a road tunnel in the United Kingdom that is—
(5) In this regulation—
(b) "traffic authority" in relation to England, Wales and Scotland has the meaning given by section 121A of the Road Traffic Regulation Act 1984[7].
Duties of administrative authority
5.
—(1) The administrative authority shall ensure that a road tunnel for which it is the administrative authority is subject to the commissioning procedure before it is opened to traffic—
(2) The administrative authority in relation to a road tunnel for which it is the administrative authority shall—
(3) The administrative authority shall ensure that such operational and organisational schemes (including emergency response plans) are drawn up as are necessary for the training and equipping of the emergency services in the event of an emergency in relation to a road tunnel for which it is the administrative authority, and it shall ensure that—
(4) If the administrative authority finds that a road tunnel for which it is the administrative authority is not in compliance with the provisions of these Regulations, it shall—
Administrative authority – duty to compile accident and fire reports
6.
—(1) The administrative authority shall, for the two year period ending on 31 March 2008 and every two year period thereafter for which it is the administrative authority, compile a report containing the information set out in paragraph (2) in respect of fires and accidents which have occurred in the road tunnel, and which affect the safety of road users of that tunnel.
(2) The report compiled under paragraph (1) shall—
(3) The administrative authority shall send each report to the Secretary of State within 22 weeks of the expiry of the period to which it relates.
Administrative authority – suspension or restriction of use of a road tunnel
7.
—(1) The administrative authority may, in relation to a road tunnel for which it is the administrative authority, suspend or restrict the operation of the road tunnel if safety requirements, (including any additional safety requirement drawn up pursuant to regulation 5(2)(b), and any risk reduction measures permitted pursuant to regulation 17), or minimum operating requirements have not been met in relation to that tunnel.
(2) The administrative authority may, in relation to a road tunnel for which it is the administrative authority suspend or restrict the operation of a road tunnel in order to carry out periodic exercises pursuant to Annex II.
(3) In relation to a road tunnel located in Great Britain, sections 14 and 16 of the Road Traffic Regulation Act 1984 and the Road Traffic (Temporary Restrictions) Procedure Regulations 1992[8], subject to the modifications set out in paragraph (7), shall apply to an order made under paragraphs (1) or (2) as if it were an order made under section 14(1) of that Act.
(4) In relation to a road tunnel located in Northern Ireland, Article 7 of, and Schedule 3 to, the Road Traffic Regulation (Northern Ireland) Order 1997[9], subject to the modifications set out in paragraph (8), shall apply to a suspension or restriction made under paragraphs (1) or (2) as if it were a restriction or prohibition made under Article 7 of that Order.
(5) Where the administrative authority suspends or restricts the operation of a road tunnel pursuant to paragraph (1), it shall specify the conditions to be met in order for the suspension or restriction to be lifted and shall—
(6) The administrative authority shall only suspend the operation of a road tunnel pursuant to paragraph (2) if satisfied that suitable arrangements can be made to divert traffic from that tunnel.
(7) In relation to an order made in relation to a road tunnel in Great Britain under paragraph (1) or (2), the Road Traffic (Temporary Restrictions) Procedure Regulations 1992 shall have effect subject to the following modifications—
(c) in regulation 15—
(8) In relation to a suspension or a restriction made under paragraph (1) or (2) in relation to a road tunnel in Northern Ireland, Article 7(5) of the Road Traffic Regulation (Northern Ireland) Order 1997 shall have effect with the substitution of the words "when the conditions imposed pursuant to regulation 7(5) of the Road Tunnel Safety 2007 Regulations have been met" for the words "at the end of the period of 18 months from the date on which the provision comes into force".
Designation of the Tunnel Manager
8.
—(1) The administrative authority shall, in relation to every road tunnel for which it is the administrative authority, designate a person to be the Tunnel Manager for (as appropriate) the design stage, the construction stage, and the operating stage.
(2) The administrative authority may undertake the role of the Tunnel Manager.
Duties of the Tunnel Manager
9.
—(1) The Tunnel Manager shall, in relation to a road tunnel, for which it is the Tunnel Manager—
(d) organise periodic exercises for tunnel staff and the emergency services in accordance with the requirements of paragraph 5 of Annex II;
(e) prepare and forward incident reports in accordance with paragraph (3); and
(f) forward investigation reports in accordance with paragraph (4).
(2) The Tunnel Manager for a road tunnel that has been subject to modification, shall ensure that the provisions of paragraph 4 of Annex II are complied with.
(3) The Tunnel Manager shall, within one month of an accident or significant incident occurring within a road tunnel for which it is the Tunnel Manager—
(4) If the Tunnel Manager prepares an investigation report, that analyses the circumstances of the incident or accident referred to in paragraph (3) or the conclusions that can be drawn from it, he shall forward that report to the administrative authority, Safety Officer and such of the emergency services as are appropriate within one month of the preparation or receipt of that report.
Designation of the Safety Officer
10.
—(1) The Tunnel Manager shall, in relation to the road tunnel for which it is the Tunnel Manager, and with the prior approval of the administrative authority, designate a Safety Officer for (as appropriate) the design stage, the construction stage, and the operating stage.
(2) The Safety Officer shall be independent in respect of road tunnel safety issues and shall not be under instructions from his employer in respect of those issues.
Duties of Safety Officers
11.
The Safety Officer shall, in respect of a road tunnel for which it is the Safety Officer—
Appointment of inspection entity
12.
—(1) The administrative authority shall, in relation to a road tunnel for which it is the administrative authority appoint a person to be the inspection entity.
(2) The person appointed as the inspection entity must be—
(3) The administrative authority may undertake the role of inspection entity provided that it fulfils the criteria set out in paragraph (2).
(4) For the purpose of this regulation a "chartered engineer" means a person who has been designated a Chartered Engineer by the Engineering Council UK.
Duties of inspection entity
13.
—(1) In order to verify whether the road tunnel for which it is the inspection entity complies with the provisions of these Regulations, the inspection entity shall carry out in relation to the road tunnel the following inspections—
(2) The inspections and examinations referred to in paragraph (a) shall be carried out at the following intervals—
(3) The inspection entity shall compile a report containing details of all inspections and investigations carried out under this regulation, and shall forward that report to the administrative authority, tunnel manager and safety officer.
(4) A report compiled pursuant to paragraph (3) shall include information on whether or not the part of the road tunnel inspected comply with the provisions of these Regulations and if those parts of the road tunnel do not comply with the provisions of these Regulations—
Appointment and duties of the technical approval authority
14.
—(1) The relevant highway authority or, in relation to Scotland, the roads authority shall at the design stage of a proposed road tunnel, appoint in relation to that tunnel, such persons as they think fit to be the technical approval authority.
(2) The technical approval authority shall be the responsible authority for the purposes of approving the design of the road tunnel under Annex II.
(3) For the purpose of this regulation—
(b) "roads authority" has the same meaning as in section 151 of the Roads (Scotland) Act 1984[12];
Road Tunnels already in operation
15.
—(1) This regulation only applies to road tunnels that were open to public traffic prior to 30th April 2006.
(2) The administrative authority shall ensure that the road tunnel has been assessed by means of an inspection, in order to ascertain whether the requirements of these Regulations have been met.
(3) Where necessary, the Tunnel Manager for a road tunnel shall ensure that proposals have been put to the administrative authority for a plan for adapting the road tunnel to the provisions of these Regulations, including the remedial measures so required.
(4) The administrative authority shall—
(5) If the remedial measures approved by the administrative authority under paragraph (4) result in modification to the construction or operation of the road tunnel, the administrative authority shall ensure that once the measures have been adopted the commissioning procedure and the requirements of paragraph 4 of Annex II have been followed.
(6) The administrative authority shall by 20th July 2007 provide the Secretary of State with a report in respect of the road tunnel that provides information on—
(7) The administrative authority shall provide the Secretary of State with a plan, including a timetable, for the gradual compliance of the road tunnel to the requirements of these Regulations as soon as practicable, and report on the state of the plan and any changes to it by 1st October 2006 and by 1st October in every second year thereafter until 2014.
Safety Requirements to be met by road tunnels
16.
Except where a risk reduction measure is to be used pursuant to regulation 17 or where a derogation has been granted pursuant to regulation 19 or permitted pursuant to paragraph 1.2.1 of Annex 1, the administrative authority shall ensure that a road tunnel that was—
Risk Reduction Measures
17.
—(1) Where the safety requirements specify a structural requirement that can only be satisfied by means of a technical solution that is not possible to achieve, or only achievable at disproportionate cost, the Tunnel Manager may apply to the administrative authority for authority to use a risk reduction measure.
(2) Where the same body is both the administrative authority and the Tunnel Manager, an application referred to in paragraph (1) shall be considered by a person who is functionally independent from the persons acting on behalf of the body in its capacity as Tunnel Manager.
(3) The administrative authority shall not permit the use of a risk reduction measure unless a risk analysis demonstrates that the measure will result in equivalent or improved protection for users of the road tunnel, compared to the relevant structural requirement in the safety requirements.
(4) Where the administrative authority permits the use of a risk reduction measure it shall—
(5) This Regulation does not apply in relation to a road tunnel that is at the design stage but the design of which had not been approved by the technical approval authority by 1st May 2006.
Risk Analysis
18.
—(1) A risk analysis shall be carried out by a person that is functionally independent from the Tunnel Manager.
(2) The person carrying out the risk analysis shall produce a report in relation to the proposed risk reduction measure which includes the following matters—
(3) The risk analysis shall be included in the safety documentation.
Derogations for innovative techniques
19.
—(1) The Tunnel Manager may at any time during the design, construction or operation of a road tunnel make a request in writing to the administrative authority for a derogation from the requirements of these Regulations in relation to the—
which provide an equivalent or higher level of protection than current technologies as prescribed in these Regulations.
(2) A request made pursuant to paragraph (1) shall be accompanied by the following information—
(e) a written report prepared by the inspection entity setting out its opinion of the request and stating whether or not the proposed procedure or equipment will provide an equivalent or higher level of protection than that provided by the procedures or equipment prescribed by these Regulations.
(3) If the administrative authority considers that the information provided by the Tunnel Manager with a request made under paragraph (1) is insufficient to enable it to make a decision the administrative authority shall notify the Tunnel Manager in writing of the additional information it requires in order to make that decision.
(4) On receiving a notification under paragraph (3) the Tunnel Manager shall provide the administrative authority with such of the additional information specified in that notification as the Tunnel Manager is reasonably able to supply and, where any of that additional information so specified is not provided, a written explanation as to why the Tunnel Manager is unable to provide it.
(5) If the administrative authority considers that the use or installation of the proposed innovative safety equipment or the use of the proposed innovative safety procedures will not provide equivalent or higher level of protection to users of the road tunnel it shall refuse the request.
(6) If the administrative authority decides that the request for a derogation should not be granted it shall give the Tunnel Manager reasons for that decision in writing.
(7) If the administrative authority decides that a derogation should, subject to the view of the Commission, be granted it shall forward the request made and information sent under paragraphs (1) (2) and (4) to the Secretary of State.
(8) The Secretary of State shall forward the information sent under paragraph (7) to the Commission within one month of receiving that information.
(9) On receipt of confirmation from the Commission that in relation to the request made under this regulation—
(10) The administrative authority shall notify the Tunnel Manager, within 2 weeks of receipt of the confirmation set out in paragraph (9) whether the request made under paragraph (1) has been granted or refused.
(11) For the purpose of this regulation—
Application of Regulations where the same person undertakes functions of different authorities
20.
—(1) Where these Regulations impose on one of the authorities specified in paragraph (2) any obligation to send information or documentation to another such authority, that obligation shall apply notwithstanding that the same person acts as both authorities.
(2) Those authorities are—
Notification to the Commission
21.
The Secretary of State shall send to the Commission—
Signed by authority of the Secretary of State for Transport
S.J. Ladyman
Minister of State
22nd May 2007
1. |
General requirements The following are road signs and symbols to be used for road tunnels. In order to facilitate international understanding of signs, the system of signs and signals prescribed in this Schedule is based on the use of shapes and colours characteristic of each class of sign and, wherever possible, on the use of graphic symbols rather than words. |
1.1 |
Road signs shall be used to designate the following safety facilities in tunnels (where they have been provided): — lay-bys, — emergency exits: the same sign shall be used for all kinds of emergency exits, — escape routes: the two nearest emergency exits shall be signed on the sidewalls at distances of no more than 25 metres, at a height of 1.0 to 1.5 metres above escape route level, with an indication of the distances to the exits, — emergency stations: signs to indicate the presence of emergency phones and fire extinguishers. |
1.2 |
Radio: In road tunnels where users can receive information via their radio, appropriate signs placed before the entrance shall inform users on how to receive this information. |
1.3 | Signs and markings shall be designed and positioned so that they are clearly visible. |
2. |
Description of signs and panels Appropriate signs shall be used, if necessary, in the advance warning area of the road tunnel, inside the tunnel and after the end of the tunnel. When designing the signs for a road tunnel, local traffic and construction conditions as well as other local conditions shall be considered. |
2.1 |
Road Tunnel Sign The traffic sign shown in diagram 529.1 in Schedule 1 to the TSRGD shall be used in combination with the traffic sign shown in diagram 570 in Schedule 1 to the TSRGD (with the distance varied as appropriate) at the entrance to the road tunnel. For road tunnels over 3,000 metres in length, the remaining length of the tunnel shall be indicated approximately every 1,000 m. The name of the tunnel may be indicated in the manner shown below. |
2.2 |
Horizontal signing Horizontal delineation should be used at the roadside edge. In the case of bi-directional road tunnels, clearly visible means should be used along the median line (single or twin) separating the two directions. |
2.3 | Signs and panels for signing of facilities: |
2.3.1 |
Emergency stations Emergency stations shall bear informative signs which indicate the equipment available to road users, such as: |
(a) | For an emergency telephone: the traffic signs to be used shall be those shown in diagrams 2714 and 2715 in Schedule 7 to the TSRGD; |
(b) | The symbol to be used for a fire extinguisher shall be that shown in diagram F001 in International Standard ISO 7010:2003 relating to safety colours and safety signs - safety sings used in workplaces and public areas; and |
(c) |
In emergency stations which are separated from the road tunnel by a door, a clearly legible text, written in appropriate languages, shall indicate that the emergency station does not ensure protection in case of fire. An example is given below:‘THIS AREA DOES NOT PROVIDE PROTECTION FROM FIRE Follow signs to emergency exits' |
2.3.2 |
Lay-bys The signs to indicate lay-bys shall be the traffic sign shown in diagram 2713.1 in Schedule 7 to the TSRGD with the "P" symbol omitted. Telephones and fire extinguishers shall be indicated by an additional panel or incorporated in the sign itself. |
2.3.3 |
Emergency exits The signs to be used to indicate ‘Emergency exits' shall be the sign shown in diagram 2711 of Schedule 7 to the TSRGD; and The sign shown in diagram 2711 in of Schedule 7 to the TSRGD shall also be used to sign the two nearest exits on the sidewalls, with the distance to those exits shown below the arrow where appropriate. This sign shall be internally illuminated. |
2.3.4 |
Lane signals The signs shown in diagrams 5003, 5003.1, 5003.2, 5005 and 5005.1 in Schedule 10 to the TSRGD shall be used for lane signals. |
2.3.5 |
Variable message signing Any variable message signs shall have clear indications to inform tunnel users of congestion, breakdown, accident, fire or any other hazards. |
3. | In this Schedule "the TSRGD" means the Traffic Signs Regulations and General Directions(a). |
3.1 | For the purposes of the application of these Regulations to Northern Ireland- |
(a) references in paragraphs 2.1 and 2.3.4 to the traffic signs shown in diagrams 529.1, 570, 5001.1, 5001.2, 5003, 5003.1, 5005 and 5005.1 of the TSRGD are references to signs shown in diagrams of corresponding numbers in the Traffic Signs Regulations (Northern Ireland) 1997 ("the 1997 Regulations")(b); |
|
(b) the traffic signs shown in diagrams 2711, 2713.1, 2714 and 2715 of the TSRGD shall be deemed to be incorporated with those numbers in Schedule 7 to the 1997 Regulations together with the untitled Table below each diagram, and references in these regulations to those diagrams in the TSRGD shall be deemed to be references to those diagrams as so incorporated; and |
|
(c) in relation to the Tables below each diagram referred to in sub-paragraph (b)- |
|
(d) items 1, 2 and 3 shall be omitted; |
|
(e) items 4 and 5 shall be renumbered 3 and 4; |
|
(f) in item 3 as so renumbered (permitted variants) the items in Schedule 16 to TSRGD shall be deemed to be incorporated with those numbers in Schedule 16 to the 1997 Regulations; and |
|
(g) in item 4 as so renumbered (illumination requirements) the items in Schedule 17 to TSRGD shall be deemed to incorporated with those numbers in Schedule 17 to the 1997 Regulations. |
[3] O.J. No. L 167, 30.4.2004, p 39, the corrigendum to the Road Tunnels Directive is in O.J. No. L 201, 7.6.2004, p. 56.back
[5] O.J. L. 228, 9.9.1996, p.1 as amended by Decision 884/2004/EC of the European Parliament and of the Counsel (O.J.L. 167, 30.4.2004, p. 1.).back
[6] Established by article 3(1) of the Departments (Northern Ireland) Order 1999, S.I. 1999/283 (N.I.1).back
[9] S.I. 1997/276 (N.I. 2)back
[11] Established by article 3(1) of the Departments (Northern Ireland) Order 1999, S.I. 1999/283 (N.I.1)back