Page 1 ⇓
FIRST DIVISION, INNER HOUSE, COURT OF SESSION
Lord President
Lord Menzies
Lord Drummond Young
[2019] CSIH 41
P1291/18
OPINION OF LORD CARLOWAY, the LORD PRESIDENT
in the Reclaiming Motion by
PENTLAND FERRIES
Petitioners and Reclaimers
against
THE SCOTTISH MINISTERS
Respondents
Petitioners and Reclaimers: Lindsay QC; Macroberts LLP
Respondents: Crawford QC, E Campbell; Scottish Government Legal Directorate
23 July 2019
Introduction
[1] This reclaiming motion is concerned with the lawfulness of a proposed subsidy to be
paid by the respondents under a single Public Service Contract to provide ferry services on
routes between: (1) Scrabster in Caithness and Stromness on the Orkney Islands; (2)
Aberdeen and Kirkwall; (3) Aberdeen and Lerwick; and (4) Kirkwall and Lerwick. The
petitioners challenge the inclusion of the Scrabster route within the PSC. They maintain that
subsidising that route threatens their competing business which operates between Gills Bay
Page 2 ⇓
2
in Caithness and St Margaret’s Hope on South Ronaldsay. This is the nearest Orkney island
to mainland Scotland. It is linked by road to mainland Orkney, via the island of Burray,
across the Churchill Barriers.
[2] The primary issue is whether the subsidy complies with the Maritime Cabotage
Regulation 1992 (EEC/3577/92) thus avoiding illegality under Article 107(1) of the Treaty on
the Functioning of the European Union.
For ease of reference, the following acronyms are occasionally used:
NIFS
PBA
PSC
PSOs
SNLF
SGEI
northern isles ferry services
Peter Brett Associates
public service contract
public service obligations
Serco NorthLink Ferries
Service of General Economic Interest
Facts
[3] The four routes under the PSC are collectively known as the northern isles ferry
services. The only one to cross the Pentland Firth is Scrabster. All four routes have been
subsidised since 1997. They are presently operated under a subsidised PSC which was
awarded to Serco Limited, operating as Serco NorthLink Ferries, in 2012 and expiring in
October 2019. The total payments under the PSC from July 2012 to June 2018 were
approximately £244 million. A projected total for the whole PSC to June 2019 is about
£285 million.
[4] On 25 September 2018, the respondents published a contract notice, in terms of the
Parliament and Council Directive 2014/24/EU on public procurement, inviting bids for a
new PSC. The short description of the services reads:
Page 3 ⇓
3
“Provision of public services in relation to [NIFS] to or from harbours located at
Aberdeen, Kirkwall, Lerwick, Scrabster and Stromness. The services shall comprise
of five vessels (3 RoPax passenger vessels and 2 RoRo freighters) to deliver the Ferry
Services.”
The new PSC is to run for eight years, of which the final two years will be subject to a
satisfactory mid-term review. The respondents envisage a period of mobilisation which
would commence on 2 August. The stated estimated value of the subsidy for the new PSC
over the 8 year period is £370 million. The invitation to tender was issued on 17 January
2019, with a deadline for bids of 28 March 2019. Serco NorthLink, CalMac Ferries and Forde
Reederei Seetouristik have submitted bids. The bids were to be evaluated by 7 June and the
contract awarded by 2 August.
[5] In addition to the Scrabster route, which is operated by SNLF under the PSC, two
other ferry routes cross the Pentland Firth. One is Gills Bay to St Margaret’s Hope. The
other is a passenger only service, which runs only during the summer months between John
o’Groats and Burwick, on Burray. These two routes are operated by the petitioners, who
were established in 1997 and have operated on the Gills Bay route since 2001. They have
exclusive rights to use Gills Bay harbour. The petitioners’ services are not subsidised. They
use the MV Pentalina, which is a 70m catamaran (launched 2008), on the Gills Bay route. A
second, larger (85m) catamaran, the MV Alfred, is due to enter service this summer. The
Lord Ordinary identified a contradiction in the petitioners’ stated intentions for the new
vessel. Their public stance has been that the Alfred will replace the Pentalina. An affidavit
from their managing director, namely Andrew Banks, states that it would be possible for the
petitioners to operate both vessels to meet all of the market demand for Pentland Firth
crossings.
Page 4 ⇓
4
[6] The Scrabster route carries passengers, vehicles and freight. It is 28 miles long. The
journey takes approximately 90 minutes using the 112m, monohulled MV Hamnavoe
(launched 2002). There are two return sailings per day in the off-peak season and three in
the peak season, which is May to September. There is capacity for 600 passengers and
350 lane metres for vehicles (68 cars). There had previously been three sailings per day in
the off-peak season. Prior to the award of the PSC in 2012, the respondents (Transport
Scotland) decided that it was neither necessary nor appropriate to force SNLF to provide a
mid-day crossing in the off-peak season due to the limited demand. This was an unpopular
decision. There were, and are, public calls for the reintroduction of this sailing.
[7] The Gills Bay route is 15 miles long. It has a crossing time of 60 minutes. The
Pentalina is able to accommodate nine articulated lorries, more than 30 cars and
250 passengers. In peak season it can accommodate 346 passengers by employing more
staff. There are three return sailings per day, with four on Saturdays in the peak season.
The petitioners aver, and the Lord Ordinary accepted, that the Gills Bay and Scrabster routes
are in competition with one another in the market for ferry services crossing the Pentland
Firth. That is a market which does not include the other three NIFS routes.
The Law
The Treaty and the Regulation
[8] European Union law regulates the provision of subsidies by member states.
Article 107 of the Treaty on the Functioning of the European Union provides that:
“1. ... [A]ny aid granted by a Member State ... in any form whatsoever which
distorts or threatens to distort competition by favouring certain undertakings ... shall,
in so far as it affects trade between Member States, be incompatible with the internal
market.
Page 5 ⇓
5
…
3. The following may be considered to be compatible with the international
markets:
…
(e) such other categories of aid as may be specified by the decision of the
Council…”.
[9] In 1992, the European Council adopted Regulation EEC/3577/92 which applied the
anti-competitive principle to services of maritime transport within Member States (maritime
cabotage). The preamble provides inter alia that:
“... the introduction of public services entailing certain rights and obligations for ...
shipowners ... may be justified in order to ensure the adequacy of regular transport
services to, from and between islands ...”.
A PSC is (Art 2.3):
“a contract concluded between … a Member State and a ... shipowner in order to
provide the public with adequate transport services.
A [PSC] may cover notably:
- transport services satisfying fixed standards of continuity, regularity,
capacity and quality,
- additional transport services,
- transport services at specified rates and subject to specified conditions, in
particular for certain categories of passengers or on certain routes,
- adjustments of services to actual requirements;”.
PSOs are defined as:
“obligations which the ... shipowner ... if he were considering his own commercial
interest, would not assume or would not assume to the same extent or under the
same conditions”.
[10] Article 4 states:
“1. A Member State may conclude public service contracts with or impose public
service obligations as a condition for the provision of cabotage services, on shipping
companies participating in regular services to, from and between islands.
Page 6 ⇓
6
Whenever a Member State concludes [PSCs] or imposes [PSOs], it shall do so on a
non-discriminatory basis in respect of all Community shipowners.
2. In imposing [PSOs], Member States shall be limited to requirements
concerning ports to be served, regularity, continuity, frequency, capacity to provide
the service, rates to be charged and manning of the vessel.
Where applicable, any compensation for [PSOs] must be available to all Community
shipowners.
…”
Guidance
[11] On 22 April 2014, the European Commission published guidance (“a
Communication”) (COM(2014)232) on the interpretation of the Regulation. It states that:
“5 Public Service
The maritime transport of passengers and goods is vital to the inhabitants of
Europe’s islands. That is why a special set of rules was drawn up to protect some of
these maritime links not adequately served by the market.
...
5.2 Island cabotage routes on which public service obligations may be imposed
It is for the Member States ... not the shipowners to determine which routes require
[PSOs]. In particular, [PSOs] may be envisaged for regular (scheduled) island
cabotage services in the event of market failure to provide adequate services.
According to the conditions laid down by the Regulation, Member States may
impose [PSOs] in order to ‘ensure the adequacy’ of regular maritime transport
services to a given island ... where Union shipowners, if they were considering their
own commercial interest, would not provide services of an adequate level or under
the same conditions. Trade should otherwise remain free.
When imposing public service obligations for services described in Article 4(1) of the
Regulation, Member States must limit their intervention to the essential requirements
referred to in Article 4(2) ... in respect of all Union shipowners interested in serving
the route. This requirement must be strictly observed when deciding on the content
of the obligations to be fulfilled and during the administrative procedure resulting in
the selection of an operator of a given service or establishing the amount of
compensation.
5.3 The obligations that may be imposed
...
Member States can impose [PSOs] and conclude [PSCs] only if they have
determined, for each route in question, that the regular transport services would be
inadequate (ie they would not be provided to the extent or under the conditions
defined by the public authorities as appropriate) if their provision was left to market
Page 7 ⇓
7
forces alone. Moreover, the [PSO] or contract must be necessary and proportionate
to the aim of ensuring the adequacy of regular transport services to and from the
islands. In other words, Member States may not subject to [PSOs] and [PSCs]
services which are already provided satisfactorily and under conditions, such as
price, continuity and access to the service, consistent with the public interest, as
defined by the State, by the undertakings operating under normal market conditions.
The Commission recalls that although Member States have a wide margin of
discretion in defining the need of public service and the extent of such service, the
decision of Member States in this respect is subject to the Commission’s control of
manifest error of assessment.
...
5.5 Market access and competition on public service routes
By imposing [PSOs], Member States intervene in the conditions of market access on
certain routes, which may distort competition if not done in a non-discriminatory
way. Such interventions may be considered both legitimate and lawful in view of
the aim pursued (to ensure the adequacy of regular – scheduled – transport services
to, from and between islands). Any intervention … should remain proportionate to
the aim pursued. Should it go beyond what is strictly needed, it would
unnecessarily restrict a freedom which is essential for the proper functioning of the
internal market.”
The Guidance confirms (Art 5.5.3) that the bundling together of routes to and from different
islands, in order to achieve economies of scale and to attract operators, is not unlawful,
provided that the bundling does not lead to discrimination or “undue market distortions”. It
states (Art 5.6) that subsidies must comply with EU law, as interpreted by the Court of
Justice of the European Union, and with the rules governing aid for Services of General
Economic Interest.
The CJEU
[12] In C-205/99 Asociación Profesional de Empresas Navieras de Líneas Regulares (Analir) v
Administración General del Estado, [2001] ECR I-1271, the Spanish requirement for a regular
island cabotage route to be authorised, and to be subject to certain conditions, came under
challenge. The CJEU provided guidance on Article 4 of the Regulation as follows:
Page 8 ⇓
8
“31. … [T]he purpose of imposing [PSOs] is to ensure adequate regular transport
services to, from and between islands …
32. … [PSOs are] obligations which the … shipowner …, if he were considering
his own commercial interest, would not assume or would not assume to the same
extent or under the same conditions
33. … [T]he aim of the [PSC]… was expressly defined … as being to provide the
public with adequate transport services.
34. It follows that the application of a prior administrative authorisation scheme
as a means of imposing [PSOs] presupposes that the … national authorities have first
been able to determine, for specific routes, that the regular transport services would
be inadequate if their provision were left to market forces alone. In other words, it
must be possible to demonstrate that there is a real public service need.
35. Second, for a … scheme to be justified, it must also be demonstrated that such
a scheme is necessary in order to be able to impose [PSOs] and that it is
proportionate to the aim pursued, inasmuch as the same objective could not be
attained by measures less restrictive of the freedom to provide services…”.
[13] In C-280/00 Altmark Trans and Regierungspräsidium Magdeburg [2003] 3 CMLR 12, a
subsidy for scheduled bus services was challenged as contrary to Article 92(1) of the EC
Treaty (the equivalent of Article 107(1) of the TFEU). The CJEU held that:
“87 … [W]here a State measure must be regarded as compensation for the
services provided … so that those undertakings do not enjoy a real financial
advantage and the measure thus does not have the effect of putting them in a more
favourable competitive position than the undertaking competing with them, such a
measure is not caught by Article 92(1) of the Treaty.
However, for such compensation to escape classification as State aid in a particular
case, a number of conditions must be satisfied.
First, the recipient undertaking must actually have public service obligations to
discharge, and the obligations must be clearly defined. …
Second, the parameters on the basis of which the compensation is calculated must be
established in advance in an objective and transparent manner, to avoid it conferring
an economic advantage which may favour the recipient undertaking over competing
undertakings.
…
Third, the compensation cannot exceed what is necessary to cover all or part of the
costs incurred in the discharge of public service obligations, taking into account the
Page 9 ⇓
9
relevant receipts and a reasonable profit for discharging those obligations.
Compliance with such a condition is essential to ensure that the recipient
undertaking is not given any advantage which distorts or threatens to distort
competition by strengthening that undertaking’s competitive position.
Fourth, where the undertaking which is to discharge public service obligations, … is
not chosen pursuant to a public procurement procedure … the level of compensation
needed must be determined on the basis of an analysis of the costs which a typical
undertaking, well run and adequately provided with means of transport so as to be
able to meet the necessary public service requirements, would have incurred in
discharging those obligations, taking into account the relevant receipts and a
reasonable profit for discharging the obligations.
…
94 … when public subsidies granted to undertakings expressly required to
discharge public service obligations in order to compensate for the costs incurred in
discharging those obligations comply with the conditions set out in paragraphs 89 to
93 above, such subsidies do not fall within Article 92(1) of the Treaty…”.
[14] In T-454/13 Société nationale maritime Corse Méditerranée (SNCM) v European
Commission, 1 March 2017, the validity of a subsidised PSC on five routes between Marseilles
to several ports on Corsica came under challenge from a private unsubsidised operator
which was providing services from Nice and Toulon to some of the same Corsican
destinations. The Marseilles routes consisted of basic passenger and freight services plus
additional passenger only services in the peak tourist season. The Commission had found
(Decision 2013/435/EU) as follows:
“135. … [T]he compensation of specific obligations under a [PSC], subsidising a
range of services, clearly constitutes an obstacle to the free movement of services.
The obstacle may be justified only under restrictive conditions establishing the
necessity and proportionality of the definition of all the services exempted from the
scope of free competition in relation to a real need for transport, which is not met
under conditions of free competition.
136. By analogy with … Analir [(supra)] … the scope of the public service remit as
defined by the [PSC] must be necessary and proportionate to a real public service
need, as demonstrated by the lack of regular transport services under normal market
conditions.”
Page 10 ⇓
10
[15] The Commission determined that the basic service met a clearly defined public
service need which other operators could not provide. The bundling of the five routes was
legitimate. There were clear standards of continuity, regularity, capacity and pricing. The
basic service was therefore necessary and proportionate to the need. The same did not
apply to the additional service. France had manifestly erred in classifying it as a service of
general economic interest. The short distance between Marseilles and Toulon produced a
high degree of “substitutability”. There was no shortage of private initiative for the
additional service. The combination of the basic services from Marseilles and the non-
subsidised routes from Toulon were sufficient to meet the additional service demand.
[16] The CJEU noted the four Altmark criteria. It observed (paras 93 and 111) that the
member state enjoyed a “wide discretion” in defining an SGEI. The court’s jurisdiction to
review was confined to cases of manifest error. The state’s power was not unlimited and
(para 112) “may not be exercised arbitrarily for the sole purpose of allowing a particular
sector to circumvent the application of the competition rules”. The CJEU endorsed the
Commission’s reasoning that the state’s discretion was limited by the Maritime Cabotage
Regulation and continued:
“120. …[T]he granting of financial compensation to a particular service provider …
is liable to impede or render less advantageous the provision of those same services
by operators not benefitting from the same compensation. The amount of the
compensation allows its recipient to enjoy a decisive advantage over its competitors
and, consequently, to dissuade them from offering the services concerned.”
Having explained that the use of an open procurement process did not mean that there was
no interference with free movement, the CJEU added:
“133 … [F]or a maritime cabotage service to be classified as a SGEI, it must meet a
real public service need, demonstrated by the insufficient regular transport services
in a situation of free competition, and that the scope of the SGEI is necessary and
proportionate to that need. It is … the responsibility of the Member State … to make
out proof of this by adducing sufficiently convincing evidence … [T]he Member
Page 11 ⇓
11
State cannot merely rely on the existence of a ‘general interest in the broadest sense’.
The absence of any evidence provided by the Member State establishing that the
abovementioned criteria have been met or disregarded is liable to constitute a
manifest error of assessment …”.
[17] The CJEU endorsed, as an alternative verification of the first criterion in Altmark, a
three stage test whereby the member state required to prove:
“130 … first, that there was user demand; second, that that demand was not
capable of being satisfied by the market operators in the absence of an obligation
imposed by the public authorities to that end; and, third, that simply having recourse
to PSOs was insufficient to remedy that shortage”.
“Thus” the CJEU continued:
“134 …first of all, if there is no demand from users for all or part of the services
falling within the scope of the public services remit, as defined by the national
authorities, that public service … cannot be considered necessary and proportionate
in relation to a real public service need. Next, nor can there be such a need if the user
demand is already capable of being met by the market operators in the absence of a
[PSO] … [I]n the absence of a shortage of private initiative, there can be no real
public service need. Lastly, if there is a user demand and that demand is not capable
of being met by the interplay of market forces alone, the national authorities should
still give preference to the approach which is least harmful to the essential freedoms
for the proper functioning of the internal market”.
The European Commission’s analysis
[18] In 2009 the European Commission had examined the provision of state aid to CalMac
and SNLF for all ferry routes to the Scottish Islands (Decision of 28 October 2009; No C
16/2008) which had been provided in terms of the Highlands and Islands Shipping Service
Act 1960. The Commission noted that, between 2002 and 2006, NorthLink 1 (a joint venture
between CalMac and RBS) had operated the Scrabster route and a triangular one from
Aberdeen to Kirkwall and Lerwick. These routes had been taken over by NorthLink 2
(CalMac only) in 2006 using 2 car ferries and 2 freight boats.
Page 12 ⇓
12
[19] The tender process from 2002 specified the routes and minimum sailings, with
timetables and fares to be agreed. Freight was to be unsubsidised. Thirteen shipping
operators had expressed an interest. Six were shortlisted but only three submitted bids, one
of which proved unacceptable. NorthLink 1 was preferred; seeking a basic subsidy of
£45.7 million for 5 years and beating the previous provider (P&O) by £14 million.
NorthLink 1’s projections proved over optimistic, partly because of the intervention of the
petitioners and Norse Land Ferries, which began to carry freight to and from Shetland. The
latter ceased operations in 2003. However, even then, NorthLink 1 was unable to operate
realistically and came close to insolvency. Further payments were made, totalling
£71 million for 3 years (2002-2005) with another £21.6 million over the next two (2005-2006).
[20] A new tender process, which included subsidised freight services, commenced in
2004 for 2006-2012. It attracted two bids, with NorthLink 2 (CalMac) selected. The
invitation to tender had met all the parameters in the Maritime Cabotage Regulation, ie
“ports to be served, regularity, continuity, frequency, capacity to provide the service, rates
to be charged and manning of the vessels” (Altmark criterion 1 para 215). However, the
parameters for compensation were not all objective or transparent (Altmark 2). There were
procedures in place to ensure no over compensation (Altmark 3) and a tendering process had
taken place (Altmark 4). The route bundling had not called into question the open, non-
discriminatory and transparent nature of the tender. However, the requirement to use the
NIFS vessels, whilst reasonable, could have led to higher costs in comparison with a
situation in which bidders were free to use their own ships. On that basis the Commission
concluded that the PSC with NorthLink 2 contained elements of state aid.
[21] The Commission held that both the NorthLink 1 and NorthLink 2 services were
sufficiently defined in terms of the Maritime Cabotage Regulation. In assessing
Page 13 ⇓
13
proportionality (with over compensation and anti-competitive behaviour), the Commission
observed that its task was not to check on whether the service could be delivered more
efficiently. In the NorthLink 1 contract (2002-2006) the average excess public funding was
only £200,000; being less than 1% of the subsidy of £23.2 million per annum (£92.8 million
for 4 years). NorthLink 2 (2006) had resulted in excess funding of £1.2 million per annum;
being 4.5% of the subsidy of £26.6 million per annum. The principle of reasonable profit for
discharging public services was endorsed and the amounts were regarded as reasonable.
There was, overall, no over compensation. NorthLink did not carry out any activities
beyond the scope of the PSC. Given their published freight tariffs, it would be difficult for
them to undercut the petitioners.
[22] In the Commission’s view (para 361) the provisions of the PSC were appropriate to
prevent over compensation. Compensation was limited to operating costs (including
reasonable profit) less operating revenues, with a clawback mechanism in place. The profit
margin resulted from a competitive tender process to ensure that the margin was set at a
reasonable level. The PSC set strict conditions on pricing, which would be infringed if NIFS
reduced prices in order to drive existing competitors out of the market. Any adjustments to
timetables required approval and cross subsidisation was prohibited. Accordingly the
Commission held that the state aid granted to NorthLink 1 and 2 was compatible with
Article 86(2) of the Treaty.
The Ferries Plan (2013-2022)
[23] In December 2012, following a review of ferry services throughout Scotland, the
respondents published their Ferries Plan. This recognised the essential nature of ferries as
part of the transport network. The quality of service had an impact on both mainland and
Page 14 ⇓
14
island communities. The aim was to “maximise” the economic and social potential of
“remote rural and island communities”. The quality, reliability and affordability of
transport links was vital for successful social and economic growth. The Plan set out
proposals for the future in terms of specific vessels, routes and the requirements of PSCs. It
was said to be based on a robust overarching framework or methodology based on objective
evidence. This defined what each community needed in terms of their ferry service, the
priority of these needs, and the model service to meet those needs. A comparison of model
and existing services was undertaken. Where there were two routes to an island, the Plan
concluded that all second routes offered some element of time saving, thus becoming the
main route for certain trips. They fulfilled a different purpose from the main route,
including tourism.
[24] Specifically in relation to the NIFS, the respondents concluded that these were
broadly fit for purpose. The Pentland Firth services, taken together, were considered
sufficient to meet the needs of the Orkney community. The proposal to retain a broadly
similar service, to that which was currently provided, was reflected in the contract for 2012
to 2018. Emphasis was placed on the key service elements of maintaining the 90 minute
Scrabster route, an avoidance of previous dry dock problems, an assurance that services
were available for time sensitive freight (fish, seasonal livestock and supermarket food) and
an improved passenger experience.
Preparation of the PSC
[25] Before advertising the new PSC, the respondents (Transport Scotland)
commissioned Peter Brett Associates, a consultancy of engineers, planners, scientists, and
economists to appraise the options. PBA produced five documents headed “Appraisal of
Page 15 ⇓
15
Options for the Specification of the 2018 Northern Isles Ferry Services Contract” in the
following chronological order: (i) Socio-Economic Baselining and Future Planning Horizon,
4 March 2016; (ii) Draft Market Analysis, 2 May 2016; (iii) Draft Consultation Report, 15 May
2016; (iv) Pre-Appraisal & Part 1 Appraisal Report, 27 September 2016; and (v) Final Report,
25 April 2018.
[26] The “Baselining” report outlined the economic situation in the Northern Isles and
Caithness in order to inform future funding and investment decisions. The population of
Orkney had grown some 12% between 2000 and 2014 to 21,590. The report detailed
Orkney’s demographics, economic output and cost of living. The minimum income
required in order to achieve an acceptable standard of living was higher in Orkney than in
other areas of Scotland and well above that in the rest of the United Kingdom. This was
caused in part by the cost of occasional trips to the mainland and delivery charges for
imported goods. Overall, Orkney was in reasonably good economic health. Renewables
offered substantial opportunities, although hydrocarbons would remain important to the
economy. Orkney had a vibrant and growing tourism market. “The NIFS would be
important in sustaining and facilitating this key industry” (para 3.3.14). “The food and
drink sector, particularly high quality agriculture, is of critical importance to Orkney and the
[NIFS] are crucially important and (sic) transporting produce off the islands” (para 3.3.16).
The forecast economic data did not suggest a fundamental change in local activity which
would lead to a significant alteration in the demand for ferry services, albeit that the growth
in tourist trade could mean an increase leading to capacity issues during peak periods. In
Caithness, the population was in decline at 26,067. The need to retain the younger cohort
was a key challenge.
Page 16 ⇓
16
[27] The Market Analysis recorded trends in “carryings” across all the NIFS routes. As at
2015 some 298,000 passengers were carried annually, with about 34,000 on the Aberdeen-
Kirkwall route and 125,000 on the Scrabster route. The equivalent figures for cars were
58,580, 470 and 34,000. The Scrabster route had shown a noticeable decline since the
introduction of the new, larger and faster Pentalina in 2008 and the cutting of the mid-day
sailing. The freight figures, in metre lengths, were 464,000, 100,500 and 53,219. The number
of freight metres had generally increased by 43% in 8 years, but it had decreased on the
Scrabster route because of the commencement and expansion of the petitioners’ services,
which had captured most of this market. As might be expected, passenger and car volumes
are seasonal. An interesting feature of the Scrabster route is its bed and breakfast service,
which allows passengers to book into cabins on the night before an early morning sailing to
Stromness. Passenger capacity on the Scrabster route was never an issue, even in the
summer. Vehicle deck use could be a problem on Saturdays during the summer, but that
was all.
[28] The Appraisal of Options Report expressed an overview recording the essential
nature of the NIFS to the island communities. It repeated most of the economic data
captured in the baseline study (supra). The NIFS played a critical role in facilitating the
economics of the island groups. Mainland connections were an essential issue for residents
in terms of their own travel and “the impact of these connections on the availability and
price of goods and services” (para 2.5.3). The Appraisal reiterated a significant decline in
the use of the Scrabster route. This had coincided with the withdrawal of the mid-day
sailing and the introduction of the Pentalina. For freight, the steady decline of 15% between
2007 and 2015 had been caused by enhanced services on the Aberdeen-Kirkwall route and
the “ramping up of operations” by the petitioners. The petitioners had negotiated
Page 17 ⇓
17
individual pricing packages with freight operators. These included volume discounts. On
whether the Scrabster route was an SGEI, residents travelled to the mainland four to six
times per annum. Business employees travelled two to three times. Eighty five per cent of
survey respondents had used a NIFS ferry in the previous year, of whom 91% had used the
Scrabster route.
[29] The removal in 2012 of the mid-day sailing on the Scrabster route had been seen by
the public, business and the Orkney Islands Council as having a negative impact on Orkney,
particularly in relation to onward travel to the other Orkney islands from Stromness. The
weather related closure of the Churchill barriers linking South Ronaldsay to the mainland,
resulted in a lack of “resilience” (para 4.2.63). The report concluded that, together, the
Scrabster and Gills Bay routes provided the capacity to meet the demand for Pentland Firth
crossings.
[30] The consequences of the new PSC in relation to the Pentland Firth market were
addressed as follows:
“4.4.23 … It is and will continue to be challenging to develop options and appraise
their potential impact when there is a competitive dynamic in the market, not to
mention State Aid/[public service obligations] considerations. ...
4.4.24 ..., there is an equilibrium of sorts in the market but there are a number of
prospective changes which could impact on this before or during the next contract.
These include:
•
Pentland Ferries is believed to be considering the purchase of a new
medium-speed catamaran. The MV Pentalina is currently experiencing
capacity constraints at peak times and it is likely that any new vessel would
be slightly larger ... It is our understanding that this vessel will replace rather
than supplement the MV Pentalina. This easing of capacity constraints could
lead to an increase in market share for Pentland Ferries, whilst a two-vessel
service would be transformative. Questions could therefore be raised over
the justification for a continuing PSC service across the Pentland Firth,
particularly in any two-vessel scenario.
•
Pentland Ferries also has a long-term aspiration to develop the short
sea crossing between Burwick and John O’Groats. This service would reduce
Page 18 ⇓
18
the journey time between Orkney and the Scottish mainland to around
30 minutes compared to the 90 minutes on Scrabster-Stromness (a journey
time which in itself requires a relatively high speed monohull vessel to
achieve) or the 60 minutes from St Margaret’s Hope to Gills Bay.
•
Pentland Ferries also has a legitimate right to make a competitive
response to any change in the NIFS PSC. This makes it difficult to forecast
the impact of any option on carryings with any degree of certainty.
4.4.25 There is a wider question for Transport Scotland as to whether there should be
a ‘floor’ set in terms of carryings/market share on the Stromness-Scrabster route,
beyond which the viability of the route should be considered.”
[31] The Report examined the option of discontinuing the Scrabster route and deploying
the MV Hamnavoe to the Aberdeen-Kirkwall route. This would mean that there would only
be one car and freight route across the Pentland Firth. This was rejected in the Report for
“reasons of public acceptability”. It would not have been acceptable to remove the Scrabster
route as “a publicly supported lifeline service” (para 6.5.18). PBA’s, and the respondents’,
view was therefore that the Scrabster route was an SGEI. There was no specific explanation
on why it had to be combined with the other three NIFS routes under a single PSC. The
reason, as stated in the contract notice, was that:
“A single operator will mean reduced contract management costs (when compared
to lotting which would result in additional operator(s)) and economies of scale in
terms of overheads and resources.”
[32] The Final Report dealt with the implications of the introduction of the Road
Equivalent Tariff (RET), which is not directly relevant for present purposes. It examined
pricing and timetabling options in some detail and in that context. Lack of capacity would
still not be a problem on the Scrabster route. Consideration was given to the reintroduction
of the off-season mid-day sailings and to stagger sailings in conjunction with the petitioners.
Page 19 ⇓
19
The parties’ affidavits
Mr Laidlaw’s affidavit
[33] The respondents produced an affidavit from Graham Laidlaw, who has been Head
of the Ferries Unit since 2008. Mr Laidlaw explained that the vast majority of ferry routes
were subsidised. The Orkney and Shetland routes had been subsidised since 1990, when
P & O had announced that they could no longer operate the routes on a commercial basis.
The respondents did not consider that adequate ferry services could be provided by the
market alone. There was therefore a need for a subsidy.
[34] Mr Laidlaw provided some updated statistics on carryings. In 2017 the four ferry
routes to Orkney had carried 382,000 passengers and 102,000 cars. The Scrabster and
Aberdeen routes had carried 185,000 lane metres of freight. The freight carried by the
petitioners’ service was (at the time of this affidavit) unknown. Mr Laidlaw summarised the
findings of PBA’s Appraisal and Final Reports (supra). The respondents (Transport
Scotland) had concluded that: (a) the Scrabster and Aberdeen routes were both lifeline
services; (b) their provision was of crucial importance to the operation of the communities
and the economies of both Orkney and Shetland; (c) their provision was key to maintaining
and growing connectivity to and from the Islands; and (d) it would be publicly unacceptable
to remove any of the services. The socio-economic sustainability of the islands was
dependent on a safe, reliable and affordable ferry service for the transport of people,
vehicles and goods. Without a lifeline service, island life would not be viable and would
lead to depopulation and terminal economic decline.
[35] The Aberdeen route was used to provide a convenient link for a range of purposes
including health, leisure, shopping and sport etc., especially at weekends. This was a
distinct market that could not be provided by a Pentland Firth service, given the road
Page 20 ⇓
20
distances involved. The timetable on the Aberdeen route was less frequent, with only three
or four sailings per week. It was a key livestock route with a dedicated infrastructure. The
cost exceeded revenue by £11.8 million in 2017 and by £9.3 million in 2018. The relative
subsidy figures were £13.2 million and £10.7 million.
[36] The Scrabster route was a necessary one, which could not be provided by the market
alone. Costs exceeded revenue by £7.4 million in 2017 and £6.9 million in 2018. The
subsidies were £8.1 million and £7.5 million. The route was not, and could not be,
commercially viable if left to market forces alone. Two commercial operators could not
compete on the Pentland Firth. The petitioners had exclusive rights to the harbours at Gills
Bay and St Margaret’s Hope. In the absence of state intervention, the petitioners would
have almost 100% of the Pentland Firth market. If the market was operated on the basis of
the petitioners’ current timetable, ferry services would be inadequate because of: (a) an
undesirable level of market concentration; (b) disadvantageous fare levels; (c) a reduction in
connectivity and accessibility for specific market segments; (d) an inferior timetable or
reduced certainty of travel; (e) dependence on sub-optimal levels of operator performance;
(f) insufficient capacity; and (g) public unacceptability.
[37] Fare levels were the biggest deterrent to more travel to and from the islands. They
were a potential social and economic barrier; hence the Scottish Government’s policy
commitment to the RET/reduced fares. This would drive up demand and cause further
capacity problems. The current fares were not reasonable. There was a market failure to
provide fares at a reasonable level, which met the needs of the island communities. The
petitioners had advised that their fares were 30% lower than they ought to be, and would be
but for the Scrabster route. Removal of the Scrabster route would result in additional
barriers to travel in terms of geography, availability and price. Gills Bay had relatively poor
Page 21 ⇓
21
connectivity. The petitioners had banned the St Margaret Hope harbour trustees from their
services, which called into question their suitability and reliability as providers of a lifeline
service. The Churchill Barriers were subject to closure in inclement weather, when hauliers
and passengers tended to transfer to Scrabster. The petitioners’ service did not provide
cover when the Pentalina was out of service.
[38] When the Scrabster route was run alongside the petitioners’ service, capacity on the
Scrabster route was not an issue. The Pentalina did not have sufficient capacity to
accommodate the demand for all Pentland Firth passenger traffic throughout the year,
although the Alfred could largely do so. The Pentalina could not carry all of the car traffic
during the summer. The Alfred could not do so in the peak summer period. Some form of
two vessel scenario was required. The problem would be exacerbated once the RET was
introduced. Accordingly, the Scrabster route was necessary for the provision of adequate
scheduled services. During the period of the NIFS (2002 to date), no economic operator has
expressed an interest in operating the services without a subsidy.
[39] A PSC was necessary given the European Commission’s decision on state aid (supra).
The Commission had determined that it was appropriate to bundle the NIFS routes. There
were sufficient safeguards to ensure that the compensation granted was proportionate to the
PSOs. The market had not changed substantially since then. Bundling enhanced integration
of the network by making it easier to combine safety, quality and environmental aspects of
vessel and port operations. It provided resilience, including the substitution of vessels, crew
and resources. It led to economies of scale in terms of management costs, ticketing and
marketing. The petitioners had never expressed any interest in operating the Scrabster
route, whether subsidised or not. The market had been tested in 2012, when there was no
Page 22 ⇓
22
interest from anyone to operate the route. No-one had requested that the routes be
“unbundled”.
[40] The current contract notice had been published on 25 September 2018. Five
operators had expressed an interest, with one deemed non-compliant and another failing
technical requirements. The remaining three had been scored and ranked. It was hoped to
evaluate the tenders in June 2019, with a contract awarded in August for service
commencement in October. The respondents would retain control over fares, timetables and
routes. They would, if requested, provide the three existing car ferries and the two freight
boats on bare boat charters. There were provisions to allow changes to the PSC to reflect
future demand and market conditions. Based on past experience, a contract with a six year
length and a two year extension period had been selected. The subsidy would be calculated
by reference to the difference between the costs of and revenue for the service. There were
provisions for the recovery of any excess payment.
Mr Banks’ affidavit
[41] Alfred Banks has been the petitioners’ managing director since their establishment in
1997. In his affidavit, he expressed disappointment at the lack of support for the petitioners’
services from Orkney Council. In 2017, the petitioners’ Gills Bay service had carried 150,000
passengers, 52,000 cars and 90,000 lane metres of freight. It was a commercially viable,
unsubsidised lifeline route. New complaints to the European Commission had been made,
including one relating to the RET. It was accepted that there was a need for both the Gills
Bay and Scrabster routes, especially in the summer. However, once the Alfred was available,
both boats could be operated and meet the entire demand on the Pentland Firth. The
petitioners offered a better service; being a cheaper, shorter crossing. A standard passenger
Page 23 ⇓
23
fare on the Scrabster route was between £17 and £20 whereas it was £16 on the Gills Bay
crossing. The fares for cars were respectively £54-60 and £38. The crossing was calmer.
[42] In 2018, the petitioners operating costs had been about £2.9 million. In 2017, the
Scrabster route had received a subsidy of £7.3 million (£20,000 per day) (cf £8.1 million
(supra)). The market was being distorted by this level of subsidy and the petitioners
struggled to pay equivalent wages and conditions. The petitioners operated inexpensive
ships and built their own piers. They could run a free Scrabster route for the amount of
subsidy being paid. The Scrabster route could be operated at a profit with more fuel
efficiency, convenient timings and a reduction in crew. There would be no problem with
there being only one provider as there would be no need for a subsidy. The petitioners’
fares would not change. It was not correct to say that fares were 30% lower than they
should be. The petitioners could operate between Gills Bay and Stromness. They could
increase sailings by using another boat. Their performance was superior to that on the
Scrabster route. The public had always been happy with the petitioners’ service. The
Churchill Barriers ought to be improved. They only closed at high tide and did not result in
cancellations of, as distinct from delays in, sailings.
[43] The respondents had failed to take into account the availability of the petitioners’
two boats. In 2010, the petitioners had proposed that the Pentland Firth crossings should be
the subject of a separate tender. They would bid on the basis of a £2 million subsidy for
5 years. There was no adequate response to this. The petitioners could not take on the
Aberdeen routes which, it was accepted, required a subsidy. This would be too big an
operation for them. In 2011, it had been suggested by the respondents that the Scrabster
route would be the subject of a separate tender. However, the conditions attached to this,
which included fixed ports and ships and the same timetable, meant that the route would
Page 24 ⇓
24
continue to be inefficient. The petitioners were not interested in this. In 2015, the petitioners
had expressed an interest in running a car ferry service to Burwick, on South Ronaldsay.
Assurances from the respondents that this would be considered did not bear fruit.
Mr Laidlaw’s supplementary affidavits
[44] Mr Laidlaw commented that the freight figures from the petitioners were new. Their
passenger and car figures were inconsistent with those provided by them to the European
Commission. The Alfred, if it were operating alone, could not meet the Pentland Firth
demand in the summer, even with extra sailings. The petitioners had made no firm
commitment to run two ferries. That had not been their publicly expressed intention.
Considerable planning would be necessary to achieve it. It was accepted that the subsidy to
the Scrabster route was “large” in comparison to the petitioners’ operating costs. There
were several reasons for this. First, dues, which were payable to the Scrabster and
Stromness harbour authorities, were significant at £5.4 million per annum. There were
higher fuel costs. The operators on the Scrabster route paid the “Living Wage”. They
provided training to all employees and contributed to their pension scheme. The ferry users
would not be happy if the petitioners were the sole providers of Pentland Firth crossings.
Consultations had stressed that the Scrabster route was a vital lifeline link.
[45] The amount of the subsidy for the NIFS in the period 2012 to 2019 had been about
£41.3 million per annum. The £370 million figure in the contract notice was the total contract
value. The market would determine the revenues and costs and thus the amount of the
subsidy. The estimate was that the subsidy for the new contract would be about £46 million
per annum over the 8 year period. However, a decrease in vessel lease costs, static harbour
charges, fare levels and freight timetables had reduced this to about £40 million. All costs
Page 25 ⇓
25
and payments were strictly monitored and controlled. If the revenues exceeded the levels
set out in the tender price, the amount of subsidy would be reduced. The controls were
applied to individual routes, thus ensuring that the subsidy remained proportionate to the
need and only ever covered the difference between revenue and costs plus a profit level
which was capped in the tender process.
Lord Ordinary’s reasoning
[46] The Lord Ordinary summarised the petitioners’ position as being that their ability to
operate a service in the same market without a subsidy showed that there was no market
failure which required a subsidy for the Scrabster route. The respondents’ position was that
they required: first, to determine the routes which were needed in order to provide adequate
maritime transport services; secondly, to assess whether each route could be provided
without a subsidy; and thirdly, to decide whether to designate a given route as an SGEI.
The Lord Ordinary accepted the respondents’ position. He agreed with the petitioners that
the Gills Bay and Scrabster routes were in competition with one another in a market for ferry
services across the Pentland Firth. He found no authority to support the proposition that, if
one route across a stretch of water required no subsidy, another route across the same
stretch of water could not be subsidised. C-205/99 Analir v Adminstracion General del Estado
(supra) referred (at para 34) to the need to assess specific routes to see whether regular
(unsubsidised) transport services would be adequate if there was no state intervention.
[47] The starting point was not to look at the market, but to look at the specific routes that
served the market (para [48]). C-280/00 Altmark Trans v Nahverkehrsgesellschaft Altmark
(supra) set the test for assessing the requirement of a subsidy for a specific route. When
looking at the Scrabster route, the first issue was the adequacy of transport services to
Page 26 ⇓
26
Orkney generally (Analir (supra), at para [31]); the Regulation, preamble (supra); the
Commission Guidance (supra at para 5.3.1). There were four reasons, underpinned by
evidence, for determining why the adequate provision of transport services necessitated a
subsidy for the Scrabster route.
[48] First, both of the Gills Bay and Scrabster routes were required to provide the capacity
to meet the demand. Although the petitioners had maintained that a two-vessel service on
the Gills Bay route would meet that demand, they had not said, during the consultation
process, that both the Pentalina and the Alfred would be in operation at the same time, nor
had they said that they could take over the Scrabster route without a subsidy. Secondly,
frequent and reliable ferry services were vital to the economy of Orkney; especially to attract
young people. The cost of ferry services was cited as the biggest single deterrent to travel to
and from the islands. The respondents’ aspirations were contained in the Islands (Scotland)
Act 2018. Thirdly, the desire to have two routes across the Pentland Firth was not irrational.
Each had its distinct advantages. The Gills Bay route was shorter and had discount freight
deals. Stromness served the west of the Orkney mainland and other islands. It had bed and
breakfast facilities. Scrabster was better served by public, including rail, transport than Gills
Bay. Fourthly, there was strong public support for the continuance of the Scrabster route.
Issues of resource allocation and aspirations for future growth were political decisions for
which the respondents were accountable.
[49] The Lord Ordinary considered whether there was a market failure on the Scrabster
route. Nobody had suggested that the route could be operated without a subsidy. In the
pre-Appraisal Report, PBA had asked whether the respondents should consider a cap on the
extent to which they would subsidise the Scrabster route. The Scrabster route had been
offered as a single route in 2012, but there had been no offers to operate it on that basis.
Page 27 ⇓
27
There was ample evidence that the route was not viable without a subsidy. Mr Laidlaw’s
affidavit showed shortfalls between revenue and costs of £8.1 million in 2017 and
£7.5 million in 2018. He gave, as reasons for the high operating costs, the commitment to
maintaining a 90 minute crossing (requiring more fuel), the obligations on the operator to
meet environmental standards and commitments to staff training and conditions of
employment.
[50] The Lord Ordinary considered the necessity and proportionality of the subsidy
(Analir (supra) at para [35]). The petitioners had estimated that the proposed subsidy was
double that of the existing contract. This proposition had not been foreshadowed in the
petition. While there was a substantial projected increase, it was impossible to say how
much would be paid under the new PSC. Fears that that subsidy would be doubled were
misplaced. The new PSC provided that payments were to be used solely to meet part of the
costs of the NIFS. The grant for each year was the projected cumulative difference between
operating costs, including an operator’s return, and revenue. Alternative ways of providing
a subsidy, which would not create an unfair advantage, largely ignored any notion of a
reasonable profit, which was a legitimate part of the subsidy (Altmark (supra) at para [92]).
There may have been other methods of valuing the requisite subsidy, but there had been no
manifest error in the new PSC. A direct payment to the petitioners would not work. The
Gills Bay route was commercially viable at present. Any payments would be classed as
illegal state aid. They would require to meet the Altmark principles. Whereas a payment to
the petitioners could be made, if the European Commission agreed, the strong expectation
was that the route would be put out to tender.
[51] The Lord Ordinary was satisfied that the bundling of the Scrabster route with the
other three NIFS routes was lawful. Bundling was a common practice endorsed by the
Page 28 ⇓
28
European Commission Guidance (supra at para 5.5.3). In 2009, it had addressed the
bundling of 26 CalMac routes during the general examination of state aid for maritime
transport services in Scotland. It had concluded that, given the legal framework allowed for
bundling, it could not be said that it was unnecessarily unfair. The Commission had
recognised the benefits of bundling. These were: the provision of relief vessels during
breakdowns, maintenance and poor weather; network integration combining safety, quality
and environmental aspects of vessel and port operations; economies of scale, ticketing and
marketing; and combining the costs and burden of tendering each route separately. The
same considerations applied here. The situation as assessed by the Commission had not
significantly changed with the introduction of the Pentalina and the petitioners’ increased
market share. Unbundling would have a significant impact on resource and staffing costs
within Transport Scotland. When the Scrabster route had been put out for tender on a
standalone basis in 2012, there had been no bids.
Submissions
Petitioners
[52] The petitioners submitted that the legal principles demonstrated that the default
position was that payment of a subsidy, which distorted or threatened to distort
competition, was unlawful. It could only be lawful if the state identified a market failure.
Market failure occurred when regular transport services would be inadequate if left to
market forces alone. Any subsidy required to be necessary and proportionate to the market
failure. Payment was only proportionate if the same objective could not be attained by
measures which were less restrictive of the freedom to provide services. A subsidy could
not be proportionate if it led to undue market distortion. The onus was on the state to
Page 29 ⇓
29
establish both a market failure and the necessity and proportionality of the subsidy by
producing sufficiently compelling evidence. The state could not simply rely on the existence
of a general interest in the broadest sense to discharge the onus.
[53] The petitioners maintained, first, that the Lord Ordinary had erred in determining
that there had been a market failure on the Scrabster route. He ought to have held that there
had been no such failure; the market being the Pentland Firth crossing. The legal test was
market, and not route, failure. The respondents had not carried out any economic analysis
of market failure. The Appraisal Report had noted that the petitioners’ potential two vessel
service would be transformative. This was evidence of an effective market, yet the report
failed to address the questions that it had posed in relation to the justification for a
continuing PSC across the Pentland Firth. The fact that the Scrabster route had been
receiving ever increasing amounts of subsidy did not constitute evidence of market failure.
The petitioners’ profitable and unsubsidised route from Gills Bay was irrefutable evidence
that the market alone could provide ferry services across the Firth.
[54] It was for the respondents to analyse why the Scrabster route required a subsidy and
thereafter to consider whether this amounted to market failure. The reasons, which might
be the result of mismanagement, had to be identified in order to ensure that any subsidy
was necessary and proportionate. If the reasons for the market failure were not identified, it
was impossible to know if the subsidy was necessary and proportionate. If the losses were
the result of increased fuel and/or crew costs, any subsidy ought to be related to these costs.
[55] Secondly, the Lord Ordinary had erred in holding that the increase in the subsidy
was necessary and proportionate. As the cause of any market failure had not been
ascertained, there was no assessment of whether the increased subsidy was necessary and
proportionate to it. There had been no explanation of why the increased subsidy was
Page 30 ⇓
30
necessary. Since it was accepted that the Scrabster route had inadequate capacity to satisfy
the demand for services across the Pentland Firth, the petitioners’ route was also a lifeline
service. No analysis had been carried out on the potential impact on the petitioners’ service.
The proposed increase in the subsidy was substantial; from £223 million to £370 million for
the four routes. The petitioners had a reasonable concern that this would undermine the
viability of their own lifeline service. The existing level of subsidy had enabled the prices on
the Scrabster route to be frozen since 2012, despite increased fuel and labour costs. The
Scrabster route had introduced discounts for Orkney residents. The respondents had failed
to consider whether there were less restrictive measures available. A subsidy could not be
proportionate if it led to undue market distortion. Such distortion would arise where the
respondents were providing a subsidy which was greater than the petitioners’ operating
costs. The failure to recognise the petitioners’ route as a lifeline service meant that there had
been no consideration of the necessity and proportionality of providing a subsidy only on
the Scrabster route. There was no justification for including the Scrabster route in the same
PSC. Previously, they had been separate lots. The need for a subsidy on the Aberdeen
routes was not disputed. The Pentland Firth market had to be looked at separately. The
consequence of the two material errors was that the decision to subsidise the Scrabster route
was unlawful because it breached Article 4.1 of the Maritime Cabotage Regulation.
Respondents
[56] It was accepted that any state aid which distorted or threatened to distort
competition was incompatible with the internal market. State aid had four characteristics:
intervention by state resources; liability to affect trade; the conferring of a selective
advantage on the recipient; and distortion or threat of distortion of competition. The four
Page 31 ⇓
31
Altmark cumulative criteria had to be fulfilled to avoid the state aid classification and to
constitute an SGEI. These were, first, that the recipient must have PSOs to discharge. This
meant that the PSC had to comply with the Marine Cabotage Regulation. Secondly, the
parameters of the compensation must have been established in advance in an objective and
transparent manner. Thirdly, the compensation had to be necessary to cover the costs of the
PSOs, taking into account receipts and allowing a reasonable profit margin. Fourthly, the
level of compensation had to be determined in an open and transparent procurement
process. The proposed PSC complied with the Altmark criteria and was therefore not
prohibited state aid. If that was correct the subsidy would not constitute undue distortion in
the market.
[57] The Marine Cabotage Regulation permitted PSCs where, for specific routes, the
regular transport services would be inadequate if left to market forces alone. A PSC was
lawful if it was necessary and proportionate to the need. Such a provision represented an
SGEI. The respondents had a wide discretion to determine what constituted adequate
regular transport services and consequently if there was a real public need for an SGEI. The
respondents’ assessment of that could be challenged only on the basis of manifest error.
There had been no such error.
[58] Market failure was addressed by asking whether, for the specific routes, the regular
transport services would be inadequate if their provision was left to the market. If that were
so, there would be a failure in adequacy which would justify a PSC. A specific route which
was required to ensure adequacy and which could not be met by the market alone would
represent a real public service need. It was for the state to determine the need and its extent.
Factors such as price, continuity and access, and public interest were all relevant to need and
Page 32 ⇓
32
adequacy. If the services were provided satisfactorily under normal market conditions,
there could be no PSC.
[59] The respondents had been entitled to conclude that the Scrabster route was required
to ensure the adequacy of services across the Pentland Firth. They had assessed what was
needed in terms of demand, fares, continuity, access, routes, social and economic growth,
prosperity and equality with the mainland. The Lord Ordinary had been correct to identify
a “wealth of evidence” to support that view, viz: demand and capacity; the needs of the
Orkney community and aspirations for future growth; the differences between the Scrabster
and the petitioners’ routes; and strong public support for the Scrabster route. It was not
disputed that the Scrabster route was a lifeline service. Having identified the Scrabster route
as being required to ensure adequacy, the question was whether it could be provided by the
market. The respondents had been entitled to conclude that it could not. There was ample
evidence that the route would not be viable without a subsidy. This was all detailed in the
PBA Pre-Appraisal report. The petitioners’ ability to operate their route profitably did not
demonstrate that the Scrabster route could do so.
[60] There was no substantial increase in the subsidy attributable to the Scrabster route.
The proposed subsidy for the Scrabster route was not materially different from the existing
level at about £7-8 million. This included harbour dues of over £5 million. The fuel costs
were higher. Costs were constantly monitored. The costs, and related subsidy, were a direct
result of the route itself. Any reduction in costs would reduce the service and the adequacy
of services. The subsidy did no more than allow a reasonable return.
[61] Necessity and proportionality were measured against the requirements of the PSC
and not against any actual or hypothetical service. The fact that a PSC involved higher costs
than another service did not call into question its need and proportionality. The
Page 33 ⇓
33
respondents had been entitled to specify the ports to meet the need and the nature of a
suitable vessel, having regard to the demand and the likely sea conditions. They were
entitled to specify the level of fares, since these were relevant to adequacy.
Decision
[62] Article 107.1 of the Treaty on the Functioning of the European Union prohibits the
subsidising of undertakings where this would distort or threaten to distort competition. The
European Council are entitled to provide exceptions to this (Art 107.3). Article 4.1 of the
Maritime Cabotage Regulation (EEC/3577/92) provides such an exception by permitting
public service contracts for the provision of maritime services to and from islands. The
Preamble to the Regulation explains that PSCs may be justified in order to ensure the
adequacy of such transport. PSCs can regulate the ports to be used, the timetables, capacity
and crewing of vessels and the fares (Art 4.2). Article 5.5 of the European Commission
Guidance (COM(2014)232) explains that any interference should be proportionate to the aim
pursued and should not go beyond what is strictly needed. It is specifically stated (Art
5.5.3) that the bundling of routes, in order to achieve economies of scale and to attract
operators, is not unlawful provided that it does not lead to “undue market distortions”.
Any subsidies must (Art 5.6) comply with EU law, as interpreted by the CJEU, notably the
rules governing aid for Services of General Economic Interest.
[63] C-205/99 Asociación Profesional de Empresas Navieras de Líneas Regulares (Analir) v
Administración General del Estado, [2001] ECR I-1271 confirmed (paras 31-35) that the purpose
of imposing PSOs was to ensure adequate regular transport services to, from and between
islands. The state had, first, to determine, for specific routes, that the regular transport
services would be inadequate if their provision were left to market forces alone. There
Page 34 ⇓
34
required to be a real public service need. Secondly, the relevant scheme had to be necessary
in order to be able to impose the PSOs and proportionate to the aim pursued. The same
objective could not be achieved by less restrictive measures.
[64] C-280/00 Altmark Trans and Regierungspräsidium Magdeburg [2003] 3 CMLR 12 set out
the four criteria which had to be met. First, there had to be clearly defined PSOs. Secondly,
the parameters for the subsidy had to be established, in advance, in an objective and
transparent manner. Thirdly, the subsidy could not exceed what was necessary to cover the
costs, taking into account relevant receipts and including a reasonable profit margin.
Fourthly, the recipient had to be chosen under public procurement procedure or the level of
subsidy had be determined on the basis of the costs which a typical undertaking would have
incurred in discharging the obligations, again taking into account relevant receipts and a
reasonable profit.
[65] In C-454/13 Société nationale maritime Corse Méditerranée (SNCM) v European
Commission, 1 March 2017, the European Commission stressed (at para 136) that the PSC had
to be necessary and proportionate to a real public service need, “as demonstrated by the lack
of regular transport services under normal market conditions”. The CJEU repeated (at para
133) that for a maritime cabotage service to be classified as an SGEI, it had to meet a real
public service need, demonstrated by insufficient regular transport services in a situation of
free competition. The scope of the SGEI must be necessary and proportionate to that need.
The state had to demonstrate (para 130): first, that there was user demand; secondly, that
that demand was not capable of being satisfied by the market in the absence of a PSO; and,
thirdly, that simply having recourse to PSOs was insufficient to remedy that shortage.
[66] The first question is whether the respondents manifestly erred in determining that,
under normal market conditions, maritime transport services to Orkney would be
Page 35 ⇓
35
inadequate without a service on the Scrabster route. The answer to that must be in the
negative. At the time of the decision to offer a PSC, the only alternative car and freight route
across the Pentland Firth was that offered by the petitioners between Gills Bay and
St Margaret’s Hope. This is a relatively (compared to the Scrabster route) short (60 minutes)
journey across 15 miles of relatively sheltered waters. It is serviced by a relatively
(compared to the Hamnavoe) modern catamaran between harbours in which the petitioners
appear to have some form of monopoly or interest which keeps the harbour dues down to
well below those at Scrabster and Stromness. There was no live proposal by the petitioners
to operate a two ferry service on the Gills Bay, or any other, route.
[67] It is clear from the material presented to the Lord Ordinary that the Scrabster route
cannot be operated commercially without a subsidy. This is not surprising. It is a
significantly longer route at 28 miles which requires a sturdier vessel because of the waters.
In order to be vaguely attractive to both passengers (notably those with a car) and freight, it
requires to be able to cross the Pentland Firth in a not too dissimilar time (90 minutes), thus
requiring a much heavier fuel load. It needs fares which are approximately competitive
with those charged by the petitioner’ quicker, shorter and more efficient service. Although
the harbour dues at Scrabster and Stromness appear to be fixed at what might best be
described as a surprisingly high price, for a local authority (public) facility serving a
subsidised PSC vessel, even without such dues the Scrabster route would remain non-viable
commercially without a significant subsidy.
[68] The need for a subsidy was in any event amply demonstrated by the absence of any
bid for the route when it was offered as a single lot in 2012. The petitioners maintain that
the Scrabster route might be run more efficiently if a more modern vessel, travelling at a
Page 36 ⇓
36
slower speed and with less crew, were used. That may be so, but the figures produced for
harbour dues alone convincingly demonstrate the requirement.
[69] In these circumstances, the respondents were entitled to conclude, on the material
available to them, that, if left to market forces alone, all that would exist in the Pentland
Firth market (leaving aside the passenger only sailings) would be the petitioners’ single car
and freight service, albeit enhanced by the arrival of the Alfred. Its capacity might, in the off-
peak season, be sufficient to meet the demand, but it could not do so over the summer
months. Any sudden disruption to the petitioners’ service, as a result of any problems with
the vessel, could cause significant difficulties with the transport of fresh produce both to and
from the island, quite apart from the general inconvenience which it would cause to
commercial and tourist traffic. Similar considerations apply to the problems, albeit
temporary, which would be caused by the temporary closure of the Churchill Barriers.
Although perhaps not the greatest of problems in a car dominated market, it is not entirely
of no moment that the petitioners’ service does not connect directly with rail services. These
do link to Scrabster from Thurso.
[70] It was for the respondents to determine what would constitute an adequacy of
service. They were entitled, on the information available to them, to decide that an
adequacy would not exist if only the service operated by the petitioners were in existence. If
only the petitioners’ service operated, the respondents were entitled to hold that the services
across the Pentland Firth would be inadequate. The market would fail to meet the demand.
There would be insufficient service to meet a real public need, especially in the peak season
and if problems arose, for whatever reason, on the petitioners’ route. The respondents were
also entitled to take into account the advantages of the Scrabster route in terms of
convenience as an alternative route. As the Lord Ordinary noted, it directly served a
Page 37 ⇓
37
different part of Orkney. After all, it was used in 2015 by almost 60,000 passengers, 34,000
cars and almost 53,000 meters of freight. It is hardly surprising that the public view is that
the route should continue to operate.
[71] Once it is accepted that an alternative to the petitioners’ route was required, the only
option available was Scrabster. The next question is whether the proposed subsidy for that
route is necessary and proportionate. As already explored, a subsidy is necessary.
Although the petitioners contend that the costs on the Scrabster route are too high for a
variety of reasons, they have been demonstrated by the respondents to be real. It is not
disputed that costs exceeded revenue by £7.4 million in 2017 and £6.9 million in 2018. Given
the level of harbour dues, this may not be surprising once the additional fuel costs of
running a 90 minute service over a 28 mile stretch of water are taken into account. The
subsidy for the same years was £8.1 million and £7.5 million. The annual profit to the
operator was between £600,000 and £700,000, which cannot be regarded as excessive. There
is no reason, on the evidence produced by the respondents, to suspect that the new PSC will
result in a substantially higher subsidy for this route. The control mechanisms in the PSC tie
the level of subsidy to a figure, including reasonable profit margin, being the difference
between the revenue and costs. The public procurement process ought to ensure that the
resultant figure is a competitive one. The subsidy is proportionate to the aim of the
provision of adequate maritime transport services to Orkney. In this context the four
Altmark criteria are met.
[72] Apart from the harbour dues on the Scrabster route, there must be some concern
about the bundling of the Pentland Firth route with what appears to be regarded as the
separate, although related, Aberdeen routes, not only to Orkney but to Shetland. However,
bundling is a recognised mode of producing economies of scale and to attract operators
Page 38 ⇓
38
(Commission Guidance (supra) para 5.5.3). It is not unlawful if it does not produce “undue
market distortions”. The bundling does not appear to do that. The reality is that the
unbundling of the Scrabster route in 2012 had produced no bidders. Although the
petitioners maintained that they would have considered making a bid, that was only on the
basis that they could change the route as well as the timetables, both of which the
respondents were entitled to determine to be necessary to provide adequacy. If the
Scrabster route, as a single PSC, could attract no bidders, there was little choice but to
bundle it in with the other NIFS, just as this is done with the multiple island routes off the
west coast.
[73] For these reasons, the court should adhere to the Lord Ordinary’s interlocutor of
26 April 2019 and refuse the reclaiming motion.
Page 39 ⇓
39
FIRST DIVISION, INNER HOUSE, COURT OF SESSION
Lord President
Lord Menzies
Lord Drummond Young
[2019] CSIH 41
P1291/18
OPINION OF LORD MENZIES
in the Reclaiming Motion by
PENTLAND FERRIES
Petitioners and Reclaimers
against
THE SCOTTISH MINISTERS
Respondents
Petitioners and Reclaimers: Lindsay QC; Macroberts LLP
Respondents: Crawford QC, E Campbell; Scottish Government Legal Directorate
23 July 2019
[74] I am in complete agreement with the views expressed by your Lordship in the chair,
and there is nothing further that I can usefully add.
Page 40 ⇓
40
FIRST DIVISION, INNER HOUSE, COURT OF SESSION
Lord President
Lord Menzies
Lord Drummond Young
[2019] CSIH 41
P1291/18
OPINION OF LORD DRUMMOND YOUNG
in the Reclaiming Motion by
PENTLAND FERRIES
Petitioners and Reclaimers
against
THE SCOTTISH MINISTERS
Respondents
Petitioners and Reclaimers: Lindsay QC; Macroberts LLP
Respondents: Crawford QC, E Campbell; Scottish Government Legal Directorate
23 July 2019
[75] I agree with the opinion of your Lordship in the chair. I have decided to write a
short concurring opinion, however, for two reasons. First, I have not found the issues that
arise in this case to be easy to resolve. State aid is generally prohibited under Community
law, on the basis that it is liable to distort competition and to favour one business at the
expense of another. An exception exists for public service contracts and public service
obligations under the Maritime Cabotage Regulation, but that exception is subject to
important controls in accordance with the Altmark criteria; the state must establish that a
Page 41 ⇓
41
public service contract or public service obligations are necessary, and such contract or
obligations are subject to the requirements of proportionality. Secondly, although the court
has concluded that those requirements are concluded in the present circumstances, the
proposed public service contract will necessarily run for a number of years, and it will in all
probability be replaced by another similar contract. Throughout that period, on the
assumption that the existing rules governing state aid continue in existence, it is important
that the proposed contract or any successor should be regulated according to the Altmark
criteria as those have been interpreted by the courts. That will require Scottish Ministers to
ensure that the subsidy arrangements, in particular, do not give the operator of ferries on the
Scrabster to Stromness route an unfair or disproportionate advantage over private enterprise
competitors such as the present petitioners.
[76] The starting point, which is accepted by the respondents, is that state aid that
threatens to distort competition is incompatible with the internal market; that is established
by article 107 of the Treaty on the Functioning of the European Union. The reason for this is
obvious: free competition among businesses that compete on an equal basis is the most
effective way of ensuring that goods and services of high quality are provided at a
reasonable price. In respect of certain categories of coastal shipping and shipping serving
offshore islands, however, that is subject to the exceptions contained within the Maritime
Cabotage Regulation (Regulation EEC/3577/92). Article 4 of the regulation permits member
states to conclude public service contracts with, or impose public service obligations as a
condition for the provision of cabotage services on, shipping companies that provide regular
services to, from and between islands. That power has been extensively used in practice,
and it is clearly potentially available in respect of shipping services between the Scottish
mainland and Orkney.
Page 42 ⇓
42
[77] Before a public service contract or a contract imposing public service obligations can
be concluded, however, it is necessary that the state should establish market failure:
European Commission guidance (COM (2014) 232). This means that, before public service
contract or obligations can be used on a particular route, it must be established that
commercial operators would not provide adequate services on that route. The primary
requirement is thus necessity: without state intervention or state aid adequate shipping
services would not be provided. In addition, if compensation is to be provided in respect of
a public service contract, it must meet a set of criteria laid down and repeatedly reaffirmed
by the Court of Justice and General Court, generally known as the Altmark criteria: Case C-
280/00. Altmark Trans and Regierungspraesidium Magdeburg, supra; reaffirmed in cases such as
Case T-454/13, Societe nationale maritime Corse Mediterranee v European Commission, supra
(“Corsican Ferries”). I propose to consider each of these requirements in turn.
[78] In relation to the necessity of concluding a public service contract along the lines
proposed by the respondents, two questions are critical: first, whether the Scrabster –
Stromness route is required to ensure adequate regular transport services between the
Scottish mainland and Orkney; and secondly, whether that route is viable without a
subsidy. In this connection it must be borne in mind that travel between the mainland and
Orkney is also available on the petitioners’ service between Gills Bay and St Margaret’s
Hope; in general terms, it appears that comparable amounts of traffic are carried on the two
routes. It was suggested in argument that the petitioners, who are about to bring a new,
larger ferry into operation, the MV Alfred, could use that vessel together with their existing
vessel, the MV Pentalina, to cater for all travel between the mainland and Orkney, without
any form of state aid. That argument was not put to Scottish Ministers at the time when
consultation was carried out as to transport between the Scottish mainland and Orkney,
Page 43 ⇓
43
however, and for that reason I consider that it is not open to the court to take it into account
at this stage.
[79] I have ultimately come to the conclusion that the respondents were entitled to
conclude that the ferry service between Scrabster and Stromness is necessary to ensure
adequate regular transport services between the Scottish mainland and Orkney. In view of
that factor, once it is established that the service is necessary, I think it clear that a subsidy is
necessary in order to maintain the service. The Court was referred to extensive
documentation arising from the consultation exercise carried out on behalf of the
respondents at the point where they were considering concluding a new public service
contract for the Scrabster to Stromness route. It seems clear from the results of that exercise
that this route is markedly more expensive to operate than the petitioners’ route between
Gills Bay and St Margaret’s Hope. The difference in costs arises out of a range of factors.
Two of these seem particularly important. First, the petitioners’ route is shorter and more
sheltered, and they are able to use a catamaran that is economical in terms of fuel. The
Scrabster to Stromness route, by contrast, goes into the open sea to the west of Hoy. This
requires a monohull vessel that is more expensive to operate. Furthermore, because the
route is substantially longer, to achieve a journey time that is acceptable to the public the
ferry requires to travel at an especially high speed, which means that it has much higher fuel
consumption. Secondly, the harbour charges at Scrabster and Stromness appear to be
especially high; the petitioners, by contrast, are able to use modern custom-built facilities at
both terminals which are under their own control.
[80] In conditions of normal competition, expensive routes and ports should lose business
and routes and ports that can operate more cheaply should gain business at their expense.
The respondents’ consultation exercise, however, demonstrates that Stromness has certain
Page 44 ⇓
44
advantages for the Orkney community. It serves the western part of the Orkney Mainland,
which is one of the most populous parts of Orkney and contains many of its most popular
tourist attractions. It is, moreover, well-positioned for services linking the Mainland with
other islands in the archipelago. St Margaret’s Hope, by contrast, is on an outlying island,
South Ronaldsay, and it is linked to the Orkney Mainland by means of the Churchill
Barriers. Occasionally these are impassable, although that does not appear to be a major
problem. Gills Bay has been developed fairly recently as a ferry port. Scrabster is long-
established as a port, and has traditionally been one of Orkney’s two main ports; its
historical links include matters such as its long-running connection with the Hudson’s Bay
Company. Transport links to Scrabster, especially by public transport, appear to be better
than those to Gills Bay. Public opinion clearly cannot be decisive in determining whether a
ferry service is necessary, but the report commissioned by the respondents indicates that the
public and Orkney Islands Council strongly supported the retention of the Scrabster to
Stromness service as a “lifeline” ferry service.
[81] I am further of opinion that the respondents are entitled to conclude that it is not
possible to operate the Scrabster to Stromness ferry service under normal market conditions
without a public subsidy. The report commissioned by them and the affidavit of
Mr Graham Laidlaw narrate the history of the route at some length. It is apparent from that
narrative that subsidies have been paid since the mid-1990s and continue to be paid. These
subsidies are at such a level that it seems an inescapable conclusion that some form of
subsidy is required if the route is to operate. It was suggested for the petitioners that they
could operate a service to Stromness from Gills Bay without a subsidy, using the two vessels
that they will shortly have available. Nevertheless, as I have already noted, this possibility
was not put to the respondents at the time when they were considering the future of the
Page 45 ⇓
45
Scrabster to Stromness service, and for that reason I think that the possibility must be
discounted for present purposes, although it could conceivably be relevant at a future date.
[82] I further consider that the respondents were entitled to bundle the Scrabster to
Stromness services with the services from Aberdeen to Kirkwall, Aberdeen to Lerwick and
Kirkwall to Lerwick. It is apparent from the case law of the Court of Justice and the General
Court that bundling is regarded as acceptable. It can have obvious practical and economic
advantages, in enabling a service to be maintained even when a vessel is out of commission
for a time. It also enables administrative savings to be made, for reasons that are obvious.
[83] For the foregoing reasons I conclude that the Scrabster to Stromness route is not
economic under normal market conditions, without a subsidy, and that accordingly the
necessity for a public service contract, or conceivably public service obligations, is
established. Under a public service contract, the respondents are entitled to regulate matters
such as the ports to be used, timetables and, most importantly, the fares charged. They must
also determine the amount of subsidy that is paid, and in the form of compensation for
undertaking a public service contract or public service obligations. As already noted, that is
a question dependent on the application of the Altmark criteria.
[84] These involve four propositions (Altmark, supra, at paragraphs 89-93; Corsican Ferries,
supra, at paragraphs 86-90).
(i) First, the undertaking receiving compensation must actually have public
service obligations to discharge, and those obligations must be clearly defined. In
the present case, these must appear from the agreement concluded between the
respondents and the undertaking that provides the Scrabster to Stromness ferry
service.
Page 46 ⇓
46
(ii) Secondly, the parameters on the basis of which the compensation is
calculated “must be established in advance in an objective and transparent manner,
to avoid it conferring an economic advantage which may favour the recipient
undertaking over competing undertakings”. Payment of such compensation by
other means will constitute state aid which contravenes the European Treaties.
(iii) Thirdly, “the compensation cannot exceed what is necessary to cover all or
part of the costs incurred in the discharge of public service obligations, taking into
account the relevant receipts and a reasonable profit for discharging those
obligations”. Such a condition is necessary to ensure that the recipient undertaking
is not given an advantage that distorts or threatens to distort competition by
strengthening its competitive position.
(iv) Fourthly, where the undertaking which is to discharge public service
obligations is not chosen using a public procurement procedure which allows
selection of the tenderer capable of providing the services at the least cost to the
community, the level of compensation must be determined on the basis of an
analysis of the costs which a typical undertaking, properly run, would have incurred
in discharging the obligations.
[85] For present purposes the fourth of these requirements is not of great significance, as
a competitive tendering process is being used. Nevertheless, the method suggested in the
fourth criterion may form a useful cross-check against amounts tendered, especially when,
as typically occurs with ferry services, the market is fairly restricted and the number of
tenderers is limited.
[86] The first criterion is plainly important. The obligations that will be imposed on the
successful tenderer are found in the draft Contract Agreement prepared by Transport
Page 47 ⇓
47
Scotland, a copy of which was available to the Court. This does appear to meet the first
criterion, as the obligations incumbent on the operator of the Scrabster to Stromness service
are set out using the framework in clause 4 of the draft agreement, dealing with Services.
[87] The second and third criteria are likewise important. These are concerned with
ensuring that, notwithstanding the payment of a state subsidy, the successful tenderer is not
given an advantage that places it in a favourable position as against other operators of
comparable services. That is of fundamental importance in the present case, because the
petitioners provide a comparable service between the Scottish mainland and Orkney, albeit
between different ports. For this purpose, it is accepted by the respondents that the relevant
market is the Pentland Firth market, and both the petitioners and the successful tenderer
will operate in that market. That means that the respondents must take care to ensure that
the levels of compensation paid to the operator of the Scrabster to Stromness service do not
give it any significant advantage over the petitioners by, for example, enabling it to undercut
the petitioners’ fares. Furthermore, the compensation paid to the successful tenderer must,
in accordance with the third criterion, be no more than is necessary to cover the costs
incurred in the discharge of public service obligations, including a reasonable profit. That
means in my opinion that the respondents must check, on a regular basis, that the amount of
compensation that they are paying to the successful tenderer is no more than is required to
meet the public service obligations.
[88] The parameters on the basis of which compensation is calculated are set out in the
draft Contract Agreement, in three principal clauses. First, in clause 13.2, the purpose of the
grant is stated:
“The Grant must be used solely to meet part of the costs and expenses of provision of
the Services in accordance with this Contract and for no other purpose whatsoever”.
Page 48 ⇓
48
Secondly, in clause 14, the method of calculation of the Grant payable to the operator is set
out (clause 14 being read in conjunction with the subsequent clauses that deal with matters
such as payment, annual reconciliations and Grant adjustment). The Grant is defined
(clause 14.4) as the projected cumulative difference between Operating Costs (including
Operator’s Return) and Revenue for a particular Service Year, as shown in the Base Case (in
an original or revised version) together with the Projected Fuel Liability and any Capital
Supplement. The Projected Fuel Liability reflects the fact that the costs of fuel in operating
the Scrabster to Stromness service are markedly higher than in other services, because of the
need to use a monohull vessel in the open sea and the need to maintain high speeds to
reduce the journey time to a level that is considered acceptable. Thirdly, the level of fares
charged is regulated by clause 5 of the agreement, which requires the Operator to publish a
tariff scheme for its services that will apply during each calendar year. That requires the
respondents to monitor the level of fares charged by the operator of the Scrabster to
Stromness route.
[89] It is in my opinion of great importance that this responsibility should be properly
performed, and this level of fares kept under regular review, for the following reasons. In a
case where a subsidized service competes with an unsubsidized service, the danger is that
the subsidy will enable an inefficient route or inefficient operator to drive an efficient route
or operator out of business, by enabling the former to charge unduly low fares.
Alternatively, the subsidy inherent in a public service contract may promote inefficiency, at
public expense, to the detriment of both the public interest and an efficient competitor. Care
must be taken to avoid these risks. In doing so, what is involved is essentially an
application of the principle of proportionality. The level of subsidy paid must be related to
the discharge of the public service obligations and should not be sufficient to give the
Page 49 ⇓
49
subsidized operator an unfair advantage over unsubsidized operators. The essential point is
made by the General Court in Corsican Ferries, at paragraph 120:
“It cannot be disputed that the granting of financial compensation to a particular
service provider that is, the public service concession holder, is liable to impede or
render less advantageous the provision of those same services by operators not
benefiting from the same compensation. The amount of the compensation allows its
recipient to enjoy a decisive advantage over its competitors and, consequently, to
dissuade them from offering the services concerned”.
[90] In the present case this can be achieved in two ways. First, it is possible to test the
fares charged for the Scrabster to Stromness route against the fares charged by the
petitioners on their route between Gills Bay and St Margaret’s Hope. The petitioner’s fares
are an obvious comparator, as they are charged by a private operator in essentially the same
market, ferry services across the Pentland Firth. If the subsidized fares on the Scrabster to
Stromness route are significantly lower than the petitioners’ fares, that is a clear indication
that the subsidy is excessive and is operating in an anti-competitive manner. Secondly, the
compensation paid to the operator of the Scrabster to Stromness route is intended to
compensate it for the obligations inherent in a public service contract. These consist in large
measure of the higher costs required to operate the route, in particularly in the form of
greater fuel consumption and higher port charges. These costs can be ascertained, and used
to check that the compensation paid to the operator is not having anti-competitive effects by
giving it an unfair advantage over the petitioners.
[91] Using those two methods, and possibly others, the respondents should be able to
check the effects of the subsidy paid to the operator of the Scrabster to Stromness route to
ensure that it is kept at a level that can reasonably be said to do no more than compensate
the operator for undertaking public service obligations, that is to say, by operating a route
that has higher costs than its main competitor, principally as a result of higher fuel costs and
Page 50 ⇓
50
harbour charges. That is essential if the criteria laid down by the Court of Justice in Altmark
and the General Court in Corsican Ferries are to be observed. Doing so is essential to keep
the operation of the route within the Maritime Cabotage Regulation and to prevent the
compensation paid to the operator from amounting to unlawful state aid. At this stage,
however, this Court must rely on the respondents’ observing their legal obligations in a
proper manner. Provided that they do so, any risk to the economic viability of the
petitioners’ own ferry service should be kept as a minimal level or eliminated. In all the
circumstances I agree that the petitioners’ appeal should be refused.