BUSINESS AND PROPERTY COURTS OF ENGLAND AND WALES
TECHNOLOGY AND CONSTRUCTION COURT (KBD)
Rolls Building London, EC4A 1NL |
||
B e f o r e :
____________________
KING JOHN BARI-IYIEDUM BEREBON & Others |
Claimants |
|
- and - |
||
SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA | Defendant |
____________________
Lord Goldsmith KC, Dr Conway Blake, Tom Cornell & Mark McCloskey (instructed by Debevoise & Plimpton LLP) for the Defendant
Hearing dates: 23rd & 24th May 2023
____________________
Crown Copyright ©
Mrs Justice O'Farrell:
i) an application by the claimants for restoration of the claims that have been the subject of an extended stay since 2014 and directions to trial;
ii) an application by the defendant, seeking an order that the claims should be struck out as provided in a consent order sealed on 15 October 2021; alternatively, pursuant to CPR 3.4(2)(a) and/or (b); or reverse summary judgment pursuant to CPR 24.2.
The Claims
"The holder of a licence shall pay compensation –
(a) to any person whose land or interest in land (whether or not it is land in respect of which the licence has been granted) is injuriously affected by the exercise of the rights conferred by the licence, for any such injurious affection not otherwise made good; and
(b) to any person suffering damage by reason of any neglect on the part of the holder or his agents, servants or workmen to protect, maintain or repair any work, structure or thing executed under the licence, for any such damage not otherwise made good; and
(c) to any person suffering damage (other than on account of his own default or on account of the malicious act of a third person) as a consequence of any breakage of or leakage from the pipeline or an ancillary installation, for any such damage not otherwise made good.
If the amount of such compensation is not agreed between any such person and the holder, it shall be fixed by a court in accordance with Part IV of this Act."
i) Under Nigerian law the common law has been superseded by the OPA in respect of the financial remedies available for land injuriously affected and for damage caused by neglect in the protection, maintenance and operation of the licensed pipelines or caused by a breakage or leakage of such pipelines (with specified exceptions) (at [64]-[69]).
ii) Once the court is seised of the compensation claim, it has all the powers of the court which have not been withdrawn or limited by the OPA, including the power to grant injunctive relief (at [65]).
iii) The defendant would not be liable under the OPA in respect of damage caused by illegal bunkering or illegal refining unless it neglected to protect, maintain or repair the pipeline (at [92]-[93]).
iv) The amount of compensation recoverable under the OPA in relation to damage arising from oil spills may be assessed by reference to the diminution in value of the land and/or interests in land which have been damaged and/or the loss of the amenity value of that land or interests therein and/or consequential loss (at [152]).
"34. The Claimants aver that following the eventual inspections and clamping of the oil spills by the Defendant, no clean up or remediation has been undertaken by the Defendant to restore the impacted creeks, waterways and land to their pre-spill state or to the condition as required by Nigerian law.
…
39. Accordingly, in respect of the said oil spills it is averred that:
a. The two oil spills resulted from erosion and rupture ("equipment failure") to oil pipelines operated by the Defendant.
b. The Defendant was provided with prompt notice of the said oil spills and failed to repair the said ruptures expeditiously, to take any/any adequate measures to reduce the flow of the oil and to take any/any adequate measures to contain the spread of oil.
c. The rate of flow of oil from the first spill was in the region of 3,900 barrels of oil for at least 72 days totalling approximately 280,000 barrels of oil. The rate of oil flow from the second spill was at least as large as the first spill and continued for 75 days.
d. The Bodo creek was environmentally sound prior to the said oil spills. The first oil spill extended to most areas within the Bodo creek and to neighbouring communities. The second oil spill added to and compounded the environmental damage which had already been caused by the first oil spill.
e. Once the Defendant had capped the ruptures to the said oil pipelines, it failed to carry out any/any adequate clean up and remediation to restore the impacted land, creeks and waterways to their pre-spill condition as required under Nigerian law.
…
65. In order to put the Community into its position prior to the spill extensive clean up and remediation is required in general terms this would require:
a. An intensive clean-up of oil spilled into the Bodo creek, including the collection of free-floating, cleaning of oiled intertidal sediments, and cleaning of mangroves;
b. An environmental remediation programme, including mangrove restoration and replanting in impacted areas;
c. Fisheries rehabilitation, including restocking native fish populations through aquaculture production;
d. Re-establishment and management of protected areas, including the designation of new mangrove protected areas.
66. It is averred in light of Defendant's history of poor clean up and remediation practice that the Court should award damages in lieu of the Defendant itself undertaking clean up and remediation …
67. Alternatively the Claimants seek a mandatory order that the Defendant carry out an appropriate clean-up and remediation of the impacted land and waterways."
"(a) It is denied that the members of the Bodo community, whether individually or in common, have the necessary proprietary interest to entitle them to bring a claim for such injunction in respect of the communal lands …
(c) Further or in the alternative, SPDC avers that it has carried out the "clean up" of, and has taken reasonable steps to carry out the "remediation" of, the area identified as having been impacted by the 2008 Oil Spills …
(d) Without prejudice to the above, SPDC is, and has since 2009 been, ready and willing to undertake further reasonable and necessary clean up and remediation of all areas concerned in this litigation (including the said mangroves, waterways, shrines and water sources) that have been impacted as a result of oil spills from its pipelines, irrespective of the cause of the spills, namely whether operational or caused by illegal activities, in accordance with its own policy and/or its responsibility under EGASPIN and/or its other accepted obligations. For the avoidance of doubt, SPDC is not liable in respect of pollution caused by oil being stolen from its pipelines by unknown third parties and/or transported to illegal refineries for refining and/or to other locations outside its operational area, and/or being refined at such. In the premises it is averred that it would not be just and equitable for the Court to grant a mandatory injunction in circumstances where the land in question has been damaged by oil released by the illegal bunkering and/or illegal refining of third parties.
(e) Accordingly, SPDC has been seeking to engage further with the Community in order to recommence clean up and remediation of the communal lands initially by way of a pilot scheme, such an approach having been agreed between the parties. However, SPDC has been prevented from doing so, inter alia, as a result of intra community disputes, the refusal of the Community to grant access to SPDC for these purposes and/or the inclusion of clean up as an issue in this litigation when it ought properly to be progressed as a priority in parallel to these proceedings …
(f) Nonetheless, despite these difficulties and delays and the Nigerian Federal Government's establishment of HYPREP to clean up all hydrocarbon impacted sites in Ogoni area including Bodo, SPDC is supporting and participating in an initiative of the former Dutch Ambassador to Nigeria with regards to clean up of the Bodo area which involves all relevant stakeholders.
(g) SPDC therefore avers that the claim for an injunction and/or damages in lieu, if the Claimants are entitled to bring such a claim, is both unnecessary, unreasonable and misconceived: it would not be just or equitable for the Court to exercise its discretion to grant such a remedy in circumstances where SPDC is ready and willing to perform the acts which would be the subject of the injunction or an award of damages and/or when the initiatives set out above are ongoing.
(h) Further, it is established as a matter of both English and Nigerian law that, as a general rule, the Court will not grant a mandatory injunction ordering a party to carry out complex works of repair on another person's land (and ownership of which is disputed as set out below …) following a nuisance: Kennard v Cory Brothers [1922] 2 Chan 1 at 11-12. This is, inter alia, because of the difficulties of supervision and enforcement of such an order. It is averred that this is even more so where the land in question in situated in another country as in this claim and/or where there are issues of access to that land. SPDC's ability to comply with the order would be dependent upon the cooperation of third parties, namely many of the people of Bodo and the surrounding area, who have prevented SPDC from carrying out this work to date, and who have threatened and kidnapped SPDC's employees.
(i) Finally, and for the avoidance of doubt, SPDC avers that it is not liable under the 1990 Act in respect of any damage to the communal lands which has been caused by the default and/or conduct of the members of the Community and/or their representatives in preventing SPDC from carrying out and/or recommencing clean up and remediation of the communal lands and/or in causing delays to that process."
Settlement of main claim and stay of clean-up claim
"A. The Claimants claim compensation from SPDC in actions in the Technology and Construction Court, a specialist court of the Queen's Bench Division of the High Court of England and Wales (the "litigation"). The litigation relates to two operational oil spills in the Bodo area of Rivers State, Nigeria in 2008 (Spill Numbers 2008_00217 and 2008_00261 respectively) (the "2008 Oil Spills").
B. SPDC has admitted liability under the Nigerian Oil Pipelines Act 1990 (the "OPA") to pay compensation in respect of the 2008 Oil Spills. This litigation concerns the amount of any compensation that may be payable, subject to SPDC's contentions and reservation of its rights in relation to certain jurisdictional issues, including issues arising as a result of parallel proceedings in Nigeria.
E. … the Parties have been able to agree certain assumptions and positions, which are recorded in this Agreement, on the basis of which, subject to the Court's approval, any compensation which is found to be payable will be assessed in the litigation. This will avoid time and costs being spent on certain issues in the litigation by both Parties, which would otherwise be extremely expensive and time-consuming to determine. Such issues include: (i) the volume of oil released by the 2008 Oil Spills; (ii) the differentiation of oil resulting from the 2008 Oil Spills from other oil in the environment around Bodo; (iii) allegations in respect of SPDC's conduct prior to, during, or since the 2008 Oil Spills, including SPDC's approach to pipeline operations, maintenance, integrity and oil spill response (including isolation, clean up and remediation); (iv) the extent to which illegal activities in Bodo and its environs prior to and after the 2008 Oil Spills impacted the environment; and (v) wayleave compensation. The purpose of this Agreement is to remove such issues from the litigation without any concessions as to those issues being made by either Party.
F. In circumstances in which the issues of clean up and remediation of the Bodo Creek (as in accordance with paragraph 1 below) are the subject of an independent mediation led by the former Dutch Ambassador to Nigeria, the Claimants' Clean Up Claims as defined in paragraph 16 below shall be stayed and shall be struck out if not restored in accordance with paragraph 16.
G. The Parties enter into and will implement this Agreement in a spirit of cooperation and good faith in the expectation that it will reduce the work that is required for the trial set down for May 2015 (the "trial") and, if possible, facilitate an early resolution of these Claims. This Agreement shall be interpreted and enforced so as to ensure that the Parties abide by the intentions and objectives, set out herein, upon which this Agreement is based."
"For the purposes of this litigation, SPDC will not seek to advance arguments or adduce evidence as to any adverse impact that any oil released into the Bodo Creek, including oil from the NNPC pipeline, illegal theft/bunkering or refining of oil, may have had on the condition of the mangrove habitats and/or fish stocks before or after the 2008 Oil Spills, nor allege that the level of compensation payable should be decreased by reason of such oil. Likewise, the Claimants will not seek to advance arguments or adduce evidence as to SPDC's conduct prior to, during, or since the 2008 Oil Spills, nor allege that the level of compensation payable should be increased by reason of such conduct. Nor shall the Claimants pursue their claims under s.11(5)(b) of the OPA or for wayleave compensation."
"The Claimants shall not pursue their claims in relation to clean up and remediation of the Bodo Creek and in particular their claims for injunctive relief or damages in lieu of the same (the "Clean Up Claims") and the Clean Up Claims shall be stayed until further order and shall be struck out automatically at 4pm on the date two calendar years from the date of this Agreement (the "Strike Out Date"). This Agreement is subject to the Claimants being at liberty to apply to the Court to restore the Clean Up Claims for trial by 4pm on the date seven days prior to the Strike Out Date."
"Save for paragraph 16 above and this paragraph 17 the Clean Up Claims shall not be subject to this Agreement."
"Save and except for the Clean Up Claims, the claim for compensation in the New Bodo Community Claim (the "Community Compensation") shall be assessed as being a sum equivalent to 15% of the total value of the net compensation paid by SPDC to the Bodo Individual Claimants and Bodo Minors Claimants (numbering no more than 13,673 individuals), subject to a minimum of £5,000,000."
"Paragraph 22 above sets out the exclusive basis upon which the entire claim for compensation in the New Bodo Community Claim shall be calculated save and except for the Clean Up Claims. The Parties agree that the New Bodo Community Claim shall be stayed pursuant to the draft Consent Order attached hereto at Appendix VII, subject to approval of the Court, pending payment of compensation. Upon payment of compensation in accordance with this Agreement and subject to paragraph 16 above in relation to clean up in the New Bodo Community Claim shall be extinguished as full and final settlement of the claim for losses alleged to have been sustained by the Bodo Community as a community."
"Claim Number HQ12X04933 (the "New Bodo Community Claim") (save that part of the claim in relation to clean up and remediation that is pleaded in paragraphs 34 to 39 and 65 to 67 of the re-amended Particulars of Claim dated 10 July 2014 and paragraphs 21 to 27 and the first three lines of paragraph 65(1) of the Schedule of Loss dated 14 February 2014 in the New Bodo Community Claim) will be stayed pending the payment of compensation by the Defendant to the Claimants in the New Bodo Community Claim in accordance with the terms of the said Narrowing Agreement."
"That part of the New Bodo Community Claim relating to clean up and remediation (namely paragraphs 34 to 39 and 65 to 67 of the re-amended Particulars of Claim dated 10 July 2014 and paragraphs 21 to 27 and the first three lines of paragraph 65(1) of the Schedule of Loss dated 14 February 2014 in the New Bodo Community Claim) will be stayed until further order and shall be struck out automatically at 4:00pm on the date two calendar years from the date of the Narrowing Agreement (the "Strike Out Date"); the Claimants being at liberty to apply to the Court to restore for trial those parts of the New Bodo Community Claim that are pleaded in those paragraphs, any such an application to be issued and served by 4:00pm on the date seven days prior to the Strike Out Date."
i) The proceedings concern two specific oil spills that occurred in the Bodo Creek in 2008-2009.
ii) The defendant is liable in respect of those oil spills pursuant to section 11(5) of the OPA but not at common law.
iii) Claims by individuals for compensation in respect of pecuniary losses were made through other proceedings in the Bomu-Bonny Oil Pipeline Litigation and were settled on a full and final basis.
iv) The claim for compensation in respect of environmental damage to the Bodo Community land, loss of amenity and other consequential losses caused by those oil spills has been settled on a full and final basis.
v) The remaining claim in these proceedings is the clean-up claim set out in paragraphs 34 to 39 and 65 to 67 of the Re-amended Particulars of Claim, together with the associated losses pleaded in the Schedule of Loss.
vi) The relief claimed in respect of the clean-up claim is a mandatory order, or damages in lieu, in respect of appropriate clean-up and remediation of the impacted land and waterways resulting from those oil spills.
Bodo Mediation Initiative (BMI or BMP)
"The Parties agreed to the BODO MEDIATION PROCESS (referred to as "BMP") in August 2013 to find mutually acceptable basis for BODO to grant SPDC access to clean up and remediate oil polluted areas in BODO without prejudice to the existing litigations in local and foreign courts. BMP is chaired by the former Dutch Ambassador to Nigeria, Mr. Bert J. Ronhaar and the former Coordinator of NACGOND, Inemo Samiama and is supported by Voluntary Stakeholders and Federal and State Government Agencies listed in recital D below. The Parties agreed to collaborate and partner in order to achieve the following aims:
i. clean-up, remediate and restore the agreed oil polluted areas in BODO, especially Sivibiragabra/Patrick Water-Side, St. Brigid and Tene-ol ("Identified Areas");
ii. safeguard the portion of the Trans Niger Pipeline (TNP) that traverses BODO and related SPDC JV facilities in order to prevent mechanical pipeline failure and pipeline and asset vandalism caused by criminal practices of oil theft and illegal refining;
iii. contribute to the economic livelihood of the people and areas affected by the oil pollution and support the socio-economic development of BODO;
iv. building trust and confidence between the Parties through mutually agreed activities/programmes, and dialogue processes, guided by independent chairpersons and advisors."
i) the Rivers State Sustainable Development Agency ("RSSDA");
ii) the National Coalition on Gas Flaring and Oil Spills in the Niger Delta ("NACGOND");
iii) the Embassy of the Kingdom of the Netherlands ("RNE"); and
iv) the United Nations Environment Programme.
i) the National Petroleum Investment Management Services ("NAPIMS");
ii) the National Oil Spill Response and Detection Agency ("NOSDRA"); and
iii) the Rivers State Ministry of Environment ("MoE").
"1. BMP comprising of Working Groups (including a technical Working Committee) a Steering Committee and a Plenary (general assembly/overall decision making body), will continue to cover all relevant aspects and activities related to the mediation. The Plenary reviews and endorses the proposals by the Working Groups, the overall work plan and approves the Project Director for the clean-up, remediation and restoration works.
2. The clean-up, remediation and restoration of the Identified Areas in BODO will be carried out in accordance with Nigerian law, by reputable contractors with proven international track record and experience with large scale clean-up, remediation and restoration works in a complex environment approved by the BMP Plenary.
3. The terms of reference for the clean-up, remediation and restoration works of the Identified Areas in BODO will continue to be based on and guided by reviews of scope of work based on the (pre-) Shoreline Clean-up Assessment Technique (SCAT) methodology by jointly established teams, headed by international consultants/experts with proven reputation and relevant international track record approved by BMP Plenary.
4. SPDC will be responsible for the cost of clean-up, remediation and restoration of the Identified Areas under consideration, including the related bidding and contracting processes which shall be in accordance with the Joint Operating Agreement of SPDC, based on the recommendations of the Technical Working Committee and taking into account the applicable approval procedures of the relevant Nigerian authorities, including the National Petroleum Investment Management Services (NAPIMS).
5. In order to ensure that the clean-up, remediation and restoration of the Identified Areas is achieved, BODO will grant and maintain unfettered access to SPDC, the Project Director, the Contractors and all persons performing or related to the performance of the clean-up, remediation and restoration works of the Identified Areas.
6. The day-to-day implementation of the clean-up, remediation and restoration work plan for the Identified Areas in BODO will be guided and supervised by the Project Director referred to in paragraph 1 who shall report to the Technical Working Committee.
7. The clean-up, remediation and restoration works will be split into three phases as follows:
a) The first phase will be the Free Phase Removal of polluted areas. The technical bidding process was started in July 2014. Since then, two contractors have been selected and approved by NAPIMS on the basis of their technical methodology including the use and training of local work force. Final contract award by SPDC is expected before July 1st 2015 and to be completed by early 2016.
b) The second Phase will be the Remediation Phase. The scope of works and selection of contractors will be established before 31 December, 2015 by the Technical Working Committee based on the outcome of the (pre- SCAT) investigation and monitoring missions in the field during the Free Phase Removal.
c) The third Phase will be the Restoration Phase. The scope of this Phase will be the re-vegetation of the various floral communities native to the Bodo creek in the "Identified Areas", reintroduction of native faunal species and constant monitoring and evaluation of their survival and succession.
…
11. In view of the overall agreement between the Parties, SPDC has agreed to contribute a one off "goodwill grant" of Seven Million United States Dollars (USD 7 million) to support sustainable socio-economic development projects in the BODO area such as improving potable water supply, electricity and public health infrastructure and/or establishing a health insurance scheme. This payment is in addition to the concluded community based compensation settlement agreement and Parties agree that the goodwill grant represents the total contribution of SPDC in this regard.
…
21. This MOU shall terminate upon completion of the activities referred to in clause 1-13.
This MOU may be extended by a Party sending a written request for an extension to the other Party and the Chair of BMP no later than three (3) months prior to the expiration of this MOU.
Parties must mutually agree to the extension period in writing before such extension shall become effective.
…
This MOU shall be governed by and construed in all respects in accordance with the law of the Federal Republic of Nigeria…"
i) Phase 1 – removal of polluted areas, by breaking up surface contamination and contaminated sediments, together with pre-shoreline clean-up assessment technique ("SCAT") surveys;
ii) Phase 2 – remediation in accordance with approved remediation plans, together with SCAT survey verification and chemical testing in accordance with Nigerian regulatory requirements;
iii) Phase 3 – restoration by re-vegetation of the Bodo Creek, including mangrove planting and monitoring.
"[48] The starting point is that the stay should be lifted if that is in accordance with the overriding objective (CPR 1.1) and if it is in accordance with the requirements of justice (Jameel v Dow Jones & Co Inc [2005] EWCA Civ 75). The issue as to whether that would be an appropriate and proportionate use of the court's resources automatically falls for consideration under r.1.1. The burden of satisfying this test is on the party who wishes to lift the stay.
[49] It is not appropriate to tilt the playing field or 'load' the test to be applied in any particular way (for example, by identifying presumptions or making repeated references to the need for 'exceptional circumstances' to be shown in order to prevent the stay being lifted). Each case will turn on its own facts.
[50] It may not always be appropriate for an application to lift a stay to be determined by a direct analogy with r.3.4 or r.24.2. There may, for example, be cases which fall short of being an abuse of process or having no reasonable ground for continuance but which, in all the circumstances, might still lead a court to conclude that, when applying the test outlined in paragraph 48 above, the stay should be refused.
[51] That said, a court could not sensibly apply the test in paragraph 48 above without some regard to those rules of the CPR. But for the stay, the action would still be ongoing, so questions of abuse of process or the absence of reasonable grounds for continuance will, at the very least, provide helpful guidelines for the proper exercise of the court's discretion in deciding whether or not to lift the stay."
i) A new Council of Chiefs was appointed on 21 August 2017.
ii) The community leadership withdrew claims for injunctions preventing clean-up and they agreed to allow the appointed contractors the necessary access to the relevant areas, such as to enable clean-up operations to start.
iii) Phase 1 (the removal of free-phase oil) re-started and was expected to be completed by the end of June 2018.
iv) Regulatory approval was obtained in December 2017 for Phase 2 (remediation) and Phase 3 (restoration).
v) It was hoped that the Phase 2 work would start towards the end of 2018 and that Phase 3 would start by about October 2019.
However, the court noted that there remained outstanding difficulties, including leadership conflicts within the Bodo Community and further oil contamination caused by illegal bunkering and refining activities.
"[41] Turning then to the question of the length of the stay and its terms, SPDC have focussed in their submissions on the question of the importance of finality, as a matter which goes both to the length of the stay and the imposition of conditions.
[42] There is, of course, force in this. I entirely accept that the default stay under Part 26 is only for one month and that the practice in this court is to be relatively resistant to lengthy stays: see for example paragraph 7.2.3 of the TCC Guide and CIP Properties (AIPT Ltd) v Galliford Try Infrastructure Ltd [2014] EWHC 3546 (TCC) at [9].
[43] However, this must be seen as a somewhat unusual case. It is not simply a large and complex case, it is a case which affects directly the lives and livelihoods of the people directly affected by a very significant oil spill. It is common ground that, while the BMI process is not formal ADR, it is in the context of this case the best and perhaps the only way of ensuring that the "clean-up" - to which both parties have made it very clear to this court that they are committed - takes place, and takes place as swiftly as possible. Further it is plain that the Court does have power under 26.4(2A) and (3) CPR to impose a stay for settlement "until such date or for such specified period as it considers appropriate".
[44] There is, of course, a need to bear in mind the desirableness of finality within a reasonable period for the parties, and for the Court (see such cases as Jameel v Dow Jones [2005] EWCA Civ 75, [2005] QB 946 at [54] and Jones v University of Warwick [2003] EWCA Civ 151 [2003] 1 WLR 954 at [25]). However, so far as the parties are concerned, they have indicated their desire at an earlier stage to give the remediation process time to make progress and that this remains the case in essence was evident both in the submissions made by both parties before me and also in the Defendant's approach adverted to above of not putting the Claimants to their election now, but endorsing the concept of a further stay.
…
[47] Ultimately what has seemed most important to me, given the "in principle" agreement of the parties to a further stay at this stage, is for the Court to provide as closely as possible the assistance which the parties sought in asking for the stay originally. Matters have moved on since then, and the reason for the delay in the timeline of progress, may yet have significance, but in essence I would want to see some good reason to depart from the scheme which the parties had in mind when seeking the original stay.
[48] What then was that intention? On the basis of the materials before me it appears from the MoU that it was anticipated that two things would have happened before the time for making a decision as to whether to lift the stay arrived. The first was the completion of Phase 1 of the clean-up, which had been anticipated to occur by early 2016. The second was the selection of contractors for Phase 2, which appears to have been timed for early 2016 also. It is not entirely clear whether it was anticipated that Phase 2 works would have started by October 2016, but that appears not unlikely. This suggests, as seems in fact to be common ground, that the parties wanted to get remediation to a good way along the timeline to see if scope remained for this action to be needed.
[49] The evidence before me indicates that at present it is anticipated that Phase 1 works will be completed by the start of July 2018. The definition and approval of the scope of the Phase 2 works has also been completed. It is on this basis that SPDC seeks a stay only until October 2018. However, the tender process (which, given the complaints about the last tender process, is sensibly intended to be done rigorously with "clear and unambiguous technical and commercial evaluation criteria to eliminate contractors without the requisite capacity and competence to carry out these works") is not anticipated to be completed before October 2018; and that date is not a firm one.
[50] I am therefore not attracted by SPDC's submission that the stay should extend no further than October 2018. That would seem to put the Claimants in the position of having to take the decision as to restoration of the action at an earlier point in the timeline than the parties initially intended.
[51] Nor, however, am I attracted by the Claimants' suggestion of dates in 2020. It seems to me that SPDC are right to say that at the time of the original stay the parties understood that the clean-up process would take longer than 2 years to achieve. That is what the Claimants' expert, Dr Gundlach, indicated clearly when he gave an estimate that 5 years would be required. To allow a stay of this length would be to allow a stay which is not in tune with the parties' intentions and indeed strays close to the "gun in the cupboard" situation deplored by Coulson J. I also consider that based on the evidence before me even the October date is too far off.
[52] I will therefore order that the stay be re-imposed until 1 July 2019. That gives time to evaluate the Phase 1 results, the appointment of the Phase 2 contractors, even allowing for some slippage in that process and (it is to be hoped) also allows for some progress to be made with Phase 2…"
"There have been multiple incidents recorded in the area. In addition, the area is tidal with potential for re-impact from surrounding waterways from crude theft and artisanal refining. The clean-up area covers a mangrove swamp region within a challenging terrain and access to majority of the clean-up area is by boat transport."
"The remedial action objective is to address the risks of direct contact by users of the mangrove area and creeks including incidental ingestion. Proposed site-specific target levels have been derived for the area taking different exposure scenarios into consideration as below (BMI, 2019). This is in line with the Environmental Guidelines and Standards for the Petroleum industry in Nigeria (EGASPIN) framework that provides for a tiered risk-based approach for soil and groundwater remediation in line with American Society for Testing & Materials - Risk-Based Corrective Action (ASTM - RBCA). Values were derived using the RBCA Toolkit (GSI, 2019)."
"1. Asphaltic Tar-like Weathered/ Crude Oil Sludge and Burnt Crude in Sand Matrix
These are found at illegal refineries and along heavily contaminated upper shorelines as discontinuous deposits of varying thicknesses thick overlying the sands and chikoko mud. They vary in thickness from 3 - 5cm or more and range in width from 0.5m to 10 cm and in length from 1m to about 50 m along shorelines. The area of impact may be significantly more in refinery locations. The tar shall be scraped off using shovels and hand digging tools and bagged in leak proof HDPE waste bags for evacuation to a waste treatment facility. In addition, there shall be levelling of illegal refining sites such that all pits and excavations are filled in and match the surrounding landscape. The wastes shall be treated thermally, and the resultant ash stabilized."
2. Heavily impacted sandy soil with intercalations of mud and clay
This is found primarily adjacent to the sand roads at Patrick Waterside, along the shorelines and beneath deposits of weathered asphaltic materials in refineries and is relatively permeable because of the sand content. The heavily impacted sands are 3 – 30cm deep and shall be excavated for on-site soil washing in equipment capable of agitating the soils and approved surfactants with recovery of the resultant effluent for treatment and disposal.
3. Heavily oiled sediments - crude oil trapped in Chikoko mud, and sand deposits
These materials constitute about 80% of the remediation scope and are found along soft channel sediments continuing landward onto the mangrove platform until heavy oiling ends. SCAT and site characterisation indicate that the impact is primarily limited to the top 0.5m of the sediments. Raking shall be used to break up algal mats and expose the sediment surface. Low pressure, high volume flushing will be used to release oil within the top 30 – 50 cm and reduce crude oil contamination in the soil to silver sheen and/or less than 25% brown/black oil at the sediment surface and the surface of water found in a pit dug to 0.3m. Pressure pumps carried on boats shall be used to pump water from the creek via hoses with nozzles which shall be inserted into the sediments. Water pressure shall be applied from bottom up (not top down which may force oil deeper) to release oils to the surface. Repeat flushing in rooty (former) mangrove sediments will be avoided to prevent liquefying of sediments, making replanting more difficult Flushing is to be conducted and the released oil is to be contained when the tide is ebbing using river booms. The released oil will be recovered manually into temporary storage cans and transported to a lined and/or bunded storage container (fast tanks) for subsequent evacuation to an approved treatment facility. Residual oil will be mopped up using absorbent materials (pads, booms, rolls). Used absorbent materials shall be stored in leak proof HDPE waste bags for evacuation to approved treatment facility.
4. Lightly Oiled Former Mangrove Areas
These areas are found primarily on the harder mangrove platform and not in soft mud areas. Any present algal mats shall be broken up using rakes or shovels to expose the oil and mix surface sediments. Where SCAT observations indicate less than 25% brown/black oil at the sediment surface and the surface of water found in a pit dug to 0.3m, they may be replanted with mangrove seedlings.
5. Revegetation
Mangrove revegetation shall be conducted to assist in ecosystem recovery. The seedlings will be planted in holes large enough to accommodate the soils accompanying the seedlings at 2m x 2m spacings. Monitoring of mangrove survival shall be conducted periodically by visiting sites in the early stages and ultimately using satellite imagery.
6. Nypa Palm Removal
Nypa Palms will be removed manually using diggers, shovels and by pulling and mechanically (using swamp buggy). They shall be evacuated from the site using boats and stockpiled for subsequent disposal."
"I, HRH, King John Berebon, the paramount ruler (Menebon) Bodo-City writes on behalf of the entire Bodo community to formally invite your company (SPDC) to resume work activities on the Remediation site in Bodo which was suspended due to community crisis in November 2022.
The community has since returned to its peaceful state and other work activities by SPDC like the pipeline monitoring and repairs have been ongoing. Hence, the need to also resume work activities on the Remediation project.
The community is committed to providing a conducive environment for this Remediation works and the youths are eager to commence work as soon as possible.
We therefore request that you begin mobilisation plans as quickly as possible.
We await your favourable response."
"… We are pleased to hear that the community unrest and violence that forced the BMI to suspend clean-up activities in November 2022 have been resolved peacefully. We are, of course, amenable to your invitation on behalf of the Bodo Community, and we will work with you within the usual BMI framework to resume BMI clean-up activities as soon as possible.
We were dismayed and disappointed when the BMI was forced to suspend clean-up activities in November 2022, in response to storage facilities and contractor base camps being raided and burned by members of the Bodo Community. Nevertheless, given that the clean-up is at an advanced stage, SPDC is optimistic that the BMI can effectively implement the final months of the clean-up exercise.
As you are aware, SPDC takes safety and security very seriously and has always sought to ensure that BMI staff and contractors, many of whom are members of the Bodo Community, can carry out clean-up activities safely and free from violence and intimidation. We therefore also welcome your re-commitment, in the spirit of the April 2015 SPDC / Bodo Community Memorandum of Understanding, to ensuring a conducive working environment for the resumption of BMI clean-up activities. As part of resuming the clean-up activities, we would like to discuss with you certain assurances that will be required from the Bodo Community and its leadership, to ensure the safety of all BMI staff and contractors going forward.
SPDC remains committed to the clean-up of Bodo under the BMI. We believe that the BMI framework remains the best and only way of achieving clean-up for the benefit of the Bodo Community, and to the satisfaction of the various civic and government stakeholders involved.
We look forward to engaging in further discussions with you, your representative team, and the BMI Project Directorate to resume site operations as soon as possible, and remediate the remaining 46 clean-up grids.
Please inform us of when you will be able to begin such discussions…"
Status of remediation process
Status of the proceedings
The Applications
i) The claimants have a right in private law to have the oil cleaned up and the land restored to the condition it was in before the spills occurred and they seek to vindicate that right through these proceedings.
ii) The fact that a trial might be complex and costly would only be considered disproportionate if the court concluded that the claimants' evidence were hopeless.
iii) In response to the defendant's case is that this court could not order a mandatory injunction that would require constant supervision and cut across the regulatory scheme in Nigeria, the claimants submit that they have a legitimate pleading for injunctive relief for remediation which is sound in Nigerian law. Even if an injunction were not granted, the court could still award damages.
iv) The evidence of obstruction of the remediation scheme by the claimants relates to matters that were before Coulson J in 2017, save for the attack in November 2022. It is not suggested that any of the claimants were responsible for such attack and King Berebon's evidence is that he wants to recommence the clean-up operations.
i) There is no tangible advantage to be gained from the clean-up claim. The BMI clean-up process has been carried out in accordance with Nigerian law, as approved and supervised by multiple Nigerian regulators. It is substantially complete. To the extent it has not already been cleaned up, any residual oil from the 2008 Bodo Spills would by now be highly-weathered and innocuous. The real problem is oil from multiple other sources of oil pollution, including illegal refining, that fall outside the scope of the clean-up claim. The claimants' criticisms of the BMI process are unfounded and the court can dispose of them without ordering a substantive trial.
ii) The clean-up claim is fundamentally flawed as a matter of Nigerian law and English law and bound to fail. It is non-justiciable by reason of the act of state doctrine. The court could not order a mandatory injunction that would require constant supervision and cut across the regulatory scheme in Nigeria. Further, it would be inequitable and contrary to the requirements of justice to order a mandatory injunction compelling the defendant to do something that the claimants themselves have obstructed for many years.
iii) The clean-up claim amounts to an abuse of process. It would be disproportionate to order a costly and complex trial in circumstances where there is very little (if anything) to be gained for the claimants given the advanced state of the BMI clean-up.
Approach to the applications
Applicable legal principles
"The court may give summary judgment against a claimant … on the whole of a claim or on a particular issue if –
(a) it considers that –
(i) that claimant has no real prospect of succeeding on the claim or issue; … and
(b) there is no other compelling reason why the case or issue should be disposed of at a trial."
"The court may strike out a statement of case if it appears to the court:
…
(a) that the statement of case discloses no reasonable grounds for bringing or defending the claim;
(b) that the statement of case is an abuse of the courts process or is otherwise likely to obstruct the just disposal of the proceedings …"
i) The court must consider whether the claim has a "realistic" as opposed to a "fanciful" prospect of success: Swain v Hillman [2001] 1 All ER 91.
ii) A "realistic" claim is one that carries some degree of conviction. This means a claim that is more than merely arguable: ED & F Man Liquid Products v Patel [2003] EWCA Civ 472 at [8]. There must be a plausible evidential basis for the claim: Brownlie v Four Seasons Holding Inc [2017] UKSC 80 per Lord Sumption at [7].
iii) The court must not conduct a "mini-trial": Three Rivers District Council v Governor and Company of the Bank of England (No 3) [2003] 2 AC 1 at [95]; Lungowe v Vedanta [2019] UKSC 20 at [9]-[14]; Okpabi v Royal Dutch Shell [2021] UKSC 3 at [21].
iv) The court should hesitate about making a final decision without a trial and must take into account not only the evidence actually placed before it at the application stage, but also any reasonable grounds identified for believing that a fuller investigation into the facts of the case would add to or alter the evidence relevant to the issue: Doncaster Pharmaceuticals Group Ltd v Bolton Pharmaceutical Co 100 Ltd [2007] EWCA Civ 661 at [4]-[6], [17]-[18]; Okpabi at [127]-[128].
"the inherent power which any court of justice must possess to prevent misuse of its procedure in a way which, although not inconsistent with the literal application of its procedural rules, would nevertheless be manifestly unfair to a party to the litigation before it, or would bring the administration of justice into disrepute amongst right-thinking people."
"[178] Finally, but importantly for present purposes, litigants should not be deprived of their claims without scrupulous examination of all the circumstances and unless the abuse has been sufficiently clearly established: "the court cannot be affronted if the case has not been satisfactorily proved" (see Alpha Rocks Solicitors v Alade [2015] 1 WLR 4535 at para. [24]; Hunter at p.22D; Summers v Fairclough Homes Ltd [2012] 1 WLR 2004 at para. [48]). Thus it has been stated repeatedly that it is only in "clear and obvious" cases that it will be appropriate to strike out proceedings as an abuse of process so as to prevent a claimant from bringing an apparently proper cause of action to trial …
…
[211] A claimant's unhindered right of access to justice in respect of properly arguable claims is a core constitutional right inherent in the rule of law (see for example R (on the application of Unison) v Lord Chancellor [2017] UKSC 51, [2020] AC 869, at paras. [61]-[85]), as well as being enshrined in article 6 (see for example Summers v Fairclough Homes Ltd [2012] UKSC 26, [2012] 1 WLR 2004 at paras. [46]-[48]). We do not go so far as to say that a claimant has an unfettered right to pursue an arguable claim against their chosen defendant: the Wyeth and Jameel abuse jurisdiction provides an exception to that general principle. Nevertheless, where the Henderson principle is not in play, it will be a rare case in which the court can say that there is no legitimate advantage in pursuing a defendant merely because there exists a claim for the same loss against another person, and especially so when it is advanced on a different basis of liability."
Disputes regarding the BMI process
Relief sought in clean-up claim
i) The mandatory injunction sought by the claimants is redundant.
ii) The clean-up claim would necessarily require the court to adjudicate on the validity or effect of the executive acts of foreign government agencies but that would be impermissible as a matter of English law pursuant to the act of state of doctrine.
iii) There is no prospect of the court ordering a mandatory injunction in circumstances such as these where the court could not police the injunction effectively.
iv) The clean-up claim seeks equitable relief in circumstances where the claimants have acted unconscionably throughout the ongoing BMI process, and there is no tangible advantage to be gained from the claim in any event.
Redundancy of relief
Act of state doctrine
"[118] In summary terms, the Doctrine amounts to this, that the courts of the United Kingdom will not readily adjudicate upon the lawfulness or validity of sovereign acts of foreign states, and it applies to claims which, while not made against the foreign state concerned, involve an allegation that a foreign state has acted unlawfully.
…
[121] The first rule is that the courts of this country will recognise, and will not question, the effect of a foreign state's legislation or other laws in relation to any acts which take place or take effect within the territory of that state.
[122] The second rule is that the courts of this country will recognise, and will not question, the effect of an act of a foreign state's executive in relation to any acts which take place or take effect within the territory of that state.
[123] The third rule has more than one component, but each component involves issues which are inappropriate for the courts of the United Kingdom to resolve because they involve a challenge to the lawfulness of the act of a foreign state which is of such a nature that a municipal judge cannot or ought not rule on it…
[124] A possible fourth rule was described by Rix LJ in a judgment on behalf of the Court of Appeal in Yukos Capital SARL v OJSC Rosneft Oil Co (No 2) [2014] QB 458, para 65, as being that
"the courts will not investigate acts of a foreign state where such an investigation would embarrass the government of our own country: but that this doctrine only arises as a result of a communication from our own Foreign Office.""
"It appears therefore that a substantial body of authority, not all of which is obiter, lends powerful support for the existence of a rule that courts in this jurisdiction will not adjudicate or sit in judgment on the lawfulness or validity under its own law of an executive act of a foreign state, performed within the territory of that state. The rule also has a sound basis in principle. It is founded on the respect due to the sovereignty and independence of foreign states and is intended to promote comity in inter-state relations. While the same rationale underpins state immunity, the rule is distinct from state immunity and is not required by international law. It is not founded on the personal immunity of a party directly or indirectly impleaded but upon the subject matter of the proceedings. The rule does not turn on a conventional application of choice of law rules in private international law nor does it depend on the lawfulness of the conduct under the law of the state in question. On the contrary it is an exclusionary rule, limiting the power of courts to decide certain issues as to the legality or validity of the conduct of foreign states within their proper jurisdiction. It operates not by reference to law but by reference to the sovereign character of the conduct which forms the subject matter of the proceedings. In the words of Lord Cottenham, it applies "whether it be according to law or not according to law". I can, therefore, see no good reason to distinguish in this regard between legislative acts, in respect of which such a rule is clearly established … and executive acts. The fact that executive acts may lack any legal basis does not prevent the application of the rule. In my view, we should now acknowledge the existence of such a rule."
Mandatory injunction
"The possibility of repeated applications for rulings on compliance with the order which arises in the former case does not exist to anything like the same extent in the latter. Even if the achievement of the result is a complicated matter which will take some time, the court, if called upon to rule, only has to examine the finished work and say whether it complies with the order."
"If the terms of the court's order, reflecting the terms of the obligation, cannot be precisely drawn, the possibility of wasteful litigation over compliance is increased. So is the oppression caused by the defendant having to do things under threat of proceedings for contempt. The less precise the order, the fewer the signposts to the forensic minefield which he has to traverse."
Abuse of process
Restoration application
"The starting point is that the stay should be lifted if that is in accordance with the overriding objective (CPR 1.1) and if it is in accordance with the requirements of justice (Jameel v Dow Jones & Co Inc [2005] EWCA Civ 75). The issue as to whether that would be an appropriate and proportionate use of the court's resources automatically falls for consideration under r.1.1. The burden of satisfying this test is on the party who wishes to lift the stay."
"(2) Dealing with a case justly and at proportionate cost includes, so far as is practicable –
(a) ensuring that the parties are on an equal footing and can participate fully in proceedings, and that parties and witnesses can give their best evidence;
(b) saving expense;
(c) dealing with the case in ways which are proportionate—
(i) to the amount of money involved;
(ii) to the importance of the case;
(iii) to the complexity of the issues; and
(iv) to the financial position of each party;
(d) ensuring that it is dealt with expeditiously and fairly;
(e) allotting to it an appropriate share of the court's resources, while taking into account the need to allot resources to other cases; and
(f) enforcing compliance with rules, practice directions and orders."
i) The claimants shall by 4pm on 3 May 2024 file and serve (a) any proposed amendments to the claim or updated schedule of loss; (b) factual witness evidence relied on; (c) expert reports relied on; (d) key documents relied on or necessary to explain the case; and (e) adverse documents as defined in paragraph 2.7 of Practice Direction 57AD.
ii) If the defendant objects to the proposed amendments, prompt notice must be given to the claimants and the court will hear the contested application at a hearing on 17 May 2024 with an estimate of 2 hours.
iii) The defendant shall by 4pm on 19 July 2024 file and serve (a) any consequential amendments to its defence; (b) factual witness evidence; (c) expert reports; (d) key documents relied on or necessary to explain the case; (e) adverse documents as defined in paragraph 2.7 of Practice Direction 57AD.
iv) The claimants shall by 4pm on 13 September 2024 file and serve (a) any consequential amendments to the reply; (b) rebuttal factual witness evidence; (c) rebuttal expert reports; (d) key documents relied on or necessary to explain the case; (e) adverse documents as defined in paragraph 2.7 of Practice Direction 57AD.
v) By 4 October 2024 the experts of like discipline shall meet for the purpose of identifying the issues on which they are agreed and those on which they disagree, narrowing the issues between them and, where possible, reaching an agreed opinion on those issues.
vi) By 4pm on 18 October 2024 the experts of like disciplines shall prepare and file a joint statement in accordance with CPR 35.12, setting out those issues on which they agree and those on which they disagree, with a summary of their reasons for disagreeing.
vii) The pre-trial review is fixed for 1 November 2024 with an estimate of ½ day.
viii) The trial is fixed for 17 February 2025, with an estimate of 6 days, including 1 day for judicial reading.
Conclusion
i) The claimants' application to restore the claim is granted.
ii) The defendant's application for summary judgment and/or strike out is dismissed.
iii) The court orders the above directions for trial fixed for 17 February 2025.