QUEENS BENCH DIVISION
TECHNOLOGY AND CONSTRUCTION COURT
B e f o r e :
____________________
IN THE MATTER OF | ||
WHARFSIDE REGENERATION (IPSWICH) | ||
- v - | ||
LAING O'ROURKE CONSTRUCTION SOUTH LIMITED (1) | ||
LAING O'ROURKE (2) | ||
GEORGE HOWE LIMITED (3) | ||
CARILLION PLC (4) |
____________________
Central Court, 25 Southampton Buildings, London WC2A 1AL
Tel: 0330 100 5223 | Email: uk.transcripts@auscript.com auscript.com
MR W WEBB appeared for the Defendants
____________________
Crown Copyright ©
This judgment was delivered in private. The judge has given leave for this version of the judgment to be published on condition that (irrespective of what is contained in the judgment) in any published version of the judgment the anonymity of the children and members of their family must be strictly preserved. All persons, including representatives of the media, must ensure that this condition is strictly complied with. Failure to do so will be a contempt of court.
This Transcript is Crown Copyright. It may not be reproduced in whole or in part other than in accordance with relevant licence or with the express consent of the Authority. All rights are reserved.
MR JUSTICE WAKSMAN:
a. First, the actual contractor costs for fixing - supplying and fixing the relevant cladding has gone up by about £1.7 million.
b. Secondly, the access costs have risen by over a million pounds. There is a different contractor and therefore there can be different work rates but what also seems to be clear from the quotations is that a much longer period of attending at the works is now said to be necessary compared to what would have been necessary before.
c. All of that then has a knock-on effect as to prelims and other features of the costs which are themselves percentages of the basic costs and that in brief explains how it has come to be that the figures have risen so dramatically.
We hereby certify that the above is an accurate and complete record of the proceedings or part thereof.