QUEEN'S BENCH DIVISION
TECHNOLOGY AND CONSTRUCTION COURT
Strand, London, WC2A 2LL |
||
B e f o r e :
____________________
PMP ELECTRICAL SERVICES LIMITED |
Claimant |
|
and – |
||
HENLEY HOMES (EAST) LLP |
Defendant |
____________________
Mr Robert Stokell (instructed by Silver Shemmings LLP) for the Defendant
Hearing dates: 14 to 16 February 2011
____________________
Crown Copyright ©
JUDGE WILCOX :
Background
"the materials did not meet current regulations in regard to resistance and integrity and that the first 30% of cable testing failed at around 15% of the required load and a full report would be issued in due course, once there (sic) testing was complete."
"Kashif, please remember that this was undertaken as a favour and at no cost. As such they have agreed to keep the issue away from EDF Networks. If it gets back they have to issue a full repost (sic) that would condemn the development until they dig up and confirm that the cables conform. Please keep all copies with us."
The Claim
The Defendant, correctly, knew or believed that the cause of the cables failure lay at its own door, yet took steps to falsely claim that the Cable was defective. Further, the Defendant by removing the Cable from its "bin store" (and by its subsequent disappearance) has attempted to conceal its deceit) although has in fact compounded it.
Cable Testing
The Ground Conditions
Prevention of Moisture Ingress
Conclusions