QUEEN'S BENCH DIVISION
TECHNOLOGY & CONSTRUCTION COURT
Fetter Lane London EC4A |
||
B e f o r e :
____________________
CLERICAL MEDICAL INVESTMENT GROUP LIMITED | Claimants | |
-v- | ||
(1) CREST NICHOLSON (SOUTH WEST) LIMITED | ||
(2) KIER REGIONAL LIMITED T/as KIER BUILDING | ||
(3) HOARE LEA AND PARTNERS | Defendants |
____________________
Smith Bernal Wordwave Limited
190 Fleet Street London EC4A 2AG
Tel No: 020 7404 1400 Fax No: 020 7831 8838
(Official Shorthand Writers to the Court)
MR DAVID STREATFIELD-JAMES, QC, and MS CAMILLE SLOW, (instructed by Messrs Mayer, Brown, Rowe & Maw) appeared on behalf of the First Defendant.
MR MARCUS TAVERNER, QC (instructed by Messrs Cameron McKenna) appeared on behalf of the Second Defendant.
MR JAMES CROSS (instructed by Messrs Beale & Co) appeared on behalf of the Third Defendant.
____________________
Crown Copyright ©
MR JUSTICE RAMSEY:
Introduction
(1) Crest Nicholson (South West) Limited ("Crest"), who is the developer of the project and who has entered into an agreement for lease ("AFL") with CMIG.(2) Kier Regional Limited ("Kier"), who is the contractor carrying out the work under a Building Contract ("the Building Contract") with Crest.
(3) Hoare Lea & Partners ("HLP"), who are services engineers originally appointed by Crest, but whose appointment has been novated to Kier.
(1) The practice of the design of heating and cooling systems, particularly the use of chilled beams systems in modern office blocks;(2) The meaning of certain technical terms in the provisions of the technical specifications;
(3) The question of engineering practice, which is raised in the declarations in relation to the use of blinds in design of heating and cooling systems.
(1) A deed dated 4th February 2006, by which Kier provided CMIG with a warranty under which it warranted that it had carried out and would continue to carry out and complete the construction of the project in accordance with the Building Contract.(2) An agreement dated 14th October 2004, by which Crest retained HLP to provide professional services in relation to the building services for the project.
(3) A deed of novation dated 17th January 2005 which was entered into, novating the appointment of HLP by Crest to Kier.
(4) A deed dated 4th February 2006, by which HLP provided a collateral warranty to CMIG, under which it warranted that it had exercised and would continue to exercise all reasonable skill and care in performing the novated appointment.
The heating and cooling system in Building 12
The construction of the contractual documents
(1) The object of interpreting the contract is to ascertain what the mutual intentions of the parties were as to the legal obligations each party assumed by the contractual words in which they sought to express them: see Lewison at paragraph 202 and what Lord Hoffmann said in Investors' Compensation Scheme v West Bromwich Building Society [1998] 1 WLR, 896:"Interpretation is the ascertainment of the meaning which the document would convey to a reasonable person having all the background knowledge which would reasonably have been available to the parties in the situation in which they were at the time of the contract."(2) The intention of the parties is, therefore, ascertained objectively from the language the parties have used, considered in the light of the surrounding circumstances and the object of the contract.
(3) Even where a word has a single, primary meaning, the choice between meanings is determined by the context in which the word is used. In this context I was referred to the decision of Steyn J (as he then was) in Phillips and Stratton v Dorintal Insurance [1987] 1 LR, 482, where he said:
"Words and phrases in contractual documents do not usually have one immutable meaning. Often there is more than one meaning available for selection. One cannot simply turn to a dictionary for an answer. In choosing the appropriate meaning, the contextual scene is usually of paramount importance."
The chilled beam issue
The Category A and B Specifications
"The following details the mechanical engineering systems to be designed and installed within the Project Green building. Where appropriate, all load calculations have been sized in accordance with CIBSE guides and, where applicable, in accordance with the requirements of the British Council for Offices Guide (BCO) 2000. Where not, items have been specifically identified within the text and criteria provided."
"External design conditions for thermal load calculations and plant sizing have in general been determined in accordance with the CIBSE Guide, section A2, Weather and Solar Data. "
1. Winter: - 4°C db saturated.2. Summer: 29°C db 20°C wb.
"Internal design conditions have been determined in accordance with CIBSE Guide, Section A, Environmental Criteria for Design, and also the recommendations of the British Council for Offices (BCO) Guide 2000, best practice in the specification for offices."
"The general office areas and the entrance/reception areas are being designed to 24°C 2°C. Please note that ± 2°C is the fluctuation band around a maximum temperature that under design steady state conditions will not be exceeded."
"To offset the fabric, infiltration and ventilation fresh air heat losses from the office accommodation, and in order to maintain the internal winter design conditions detailed in the design criteria of this report, a central gas-fired low temperature hot water (LTHW) heating system will be provided."
"To offset the fabric, infiltration, solar, internal and ventilation fresh air heat gains to the office accommodation, and to maintain the internal summer design conditions, a central chilled water (CHW) cooling system, incorporating two chillers, will be provided."
"The office areas will be provided with fresh supply air and extract air handling systems to meet the ventilation volume flow rates as detailed in the design criteria section, with all ductwork designed and installed to meet the standards set in the ductwork specification."
"Supply air will be introduced to occupied spaces at a temperature slightly below room conditions for the majority of the year to provide a draught-free ventilation system. During winter months the supply air temperature will be scheduled against outside air temperature to provide warmer air during cold periods."
"Light, mainly sedentary, activity during winter conditions (heating period). The conditions are the following:
(a) The operative temperature shall be between 20°C and 24°C (ie 22°C ± 2°C). "
"Light, mainly sedentary, activity during summer conditions (cooling period). The conditions are the following:
(a) The operative temperature shall be between 23°C and 26°C (ie 24.5°C ± 1.5°C)."
"Agreed: Summer is the time of year when higher external temperatures prevail and occupants tend to wear lighter clothing. Winter is the time of year when lower external temperatures prevail and occupants tend to wear warmer clothing. Due to the fluctuating nature of the UK climate, it is not possible to rigidly define when the winter and summer conditions apply."
"Table 1.1 gives general guidance and recommendations on suitable winter and summer temperature ranges, outdoor air supply rates, filtration rates, maintained luminances and noise ratings for a range of room and building types. The dry resultant temperature ranges, based on the assumed clothing, insulation and metabolic rates indicated, correspond to a predicted mean vote (PMV) of ± 0.25, see section 1.4.2.2. These are intended to give a base level from which corrections can be made for non-standard situations.
The summer comfort temperatures given in Table 1.1 apply to air-conditioned buildings. Higher temperatures may be acceptable if air-conditioning is not present…."
"This does not mean that the temperature in buildings must be kept below 19°C, but only that fuel or electricity must not be used to raise the temperatures above this level. In Table 1.1 for some applications the recommended minimum winter design temperatures exceed 19°C. In these cases it is assumed that recommended temperatures can be maintained by contributions from heat sources other than the heating system. These may include solar radiation, heat gains from lighting, equipment and machinery and heat gains from occupants themselves.
Guidance on adapting these general recommendations to other situations is given in subsequent sections and Table 1.2 indicates which sections should be consulted for further guidance on any given design parameter. For example, if clothing insulation is expected to be outside that given in Table 1.1, guidance on the appropriate correction to the design dry resultant temperature may be found in section 1.4.3.2."
"Temperature. Recommended standards for offices are:
24°C for summer design
22°C for winter design.
The range of temperatures achieved in the space will depend on the selected control band which can vary for different system types but will typically be ± 2°C. Internal temperatures will rise when summer design conditions are exceeded. Design air temperatures need to be reviewed with other comfort criteria such as radiant effects and air movement. Radiant cooling systems such as chilled ceilings achieve equal comfort at higher design temperatures."
"In using this guide, it is important to understand the distinction between comfort temperatures, the various air and surface temperatures which determine the rate of heat transfer to and from the building, and the temperatures sensed by the detectors employed to control the heating, air-conditioning and ventilation system. For design and calculations purposes they are often combined together and treated as a single index temperature."
The Contractors' Proposal
(1) "Drawings, specifications and schedules as listed on attached HLP drawing issue sheets." Then it gives the numbers.(2) "Revision changes schedule for Stage E design, Revision D…dated 7th July 2004." It gives a reference number.
"To provide all space heating requirements due to fabric, ventilation and infiltration heat losses during occupancy hours to maintain the space temperatures scheduled in Clause 2000 below."
"Office areas: 22°C± 2°C"
"To provide all space cooling requirements using either chilled water or cooling water to offset the appropriate heat gains to maintain the space temperatures scheduled in Clause 2000 below."
"Summer internal design temperatures (dry resultant) are as follows:
Office areas: 24°C ± 2°C."
Item 37.
Item 53.
Item 146.
"The heating zone and cooling control will not meet the AFL. At the moment you are still heating at 23.5°C and not starting cooling until 24.5°C. Under normal circumstances this building must not exceed 24°C."
The response was: "This shall be amended."
"The zone temperature sensor shall control the space temperature at 24°C with a dead band of 1°C such that the perimeter 2-port valve shall shut off at 23.5°C and the cooling beam 2-port valve shall open at 24.5°C."
(1) Clause 5440 contains the following provision:"The duty pump shall be energised whenever there is a cooling demand from the respective zone valves (ie one of the space air temperature sensors exceeds 22°C)."(2) In addition at Clause 5600 it states:
"…the reheater battery shall control the supply air temperature such that the average space temperature is 22°C. If the average space temperature rises above the setpoint, then the supply air temperature shall reduce to control the average space temperature at 22°C down to a minimum of 18°C supply. If the supply air temperature is at the minimum limit and the average space temperature is greater than 23°C, then the zone static cooling beam MV shall modulate open."
The blinds issue
"Solaglass, Saint Gobain or equal or approved double-glazed units with air cavity and solar coating Cool-lite KN169 or equal or approved on surface 2."
"Fenestration and solar control.
[HLP] have worked closely with Fitzroy Robinson [the architects] on the development of the facades and to engineer the external facade to include a combination of solar control glazing and brise-soleil to minimise the solar gain."
"Glare control within the offices can be achieved by the installation of internal blinds by the tenant."
"Solar glare blinds will be installed to all work area windows and atrium glazed areas."
"Perimeter roller blinds. New, manually operated, Silent Gliss roller blind system with mid-grey colour 3% weave openness, solar control fabric. Blinds to be operated via metal bead chains and to have exposed satin aluminium base rails."
"Roller blind system with mid-grey colour, 3% weave openness, solar control fabric."
"The only kind of rights with which courts of justice are concerned are legal rights and a court of civil jurisdiction is concerned with legal rights only when the aid of the court is invoked by one party claiming a right against another party to protect or enforce that right or to provide a remedy against that party for infringement of it, or is invoked by either party to settle a dispute between them as to the existence or the nature of the right claimed. So for the court to have jurisdiction to declare any legal right it must be one which is claimed by one of the parties as enforceable against an adverse party to the litigation either as a subsisting right or as one which may come into the existence in the future conditionally on the happening of an event. It is when an infringement of the Claimant's rights in the future is threatened or when, unaccompanied by threats, there is a dispute between the parties as to what their respective rights will be if something happens in the future that the jurisdiction to make declarations of right can most usefully be invoked, but the jurisdiction of the court is not to declare the law generally or to give advisory opinions. It is confined to declaring contested legal rights, subsisting or future, of the parties represented in the litigation before it and not those of anyone else."
"This should give owners and occupiers information on energy-efficient features and strategies relating to the building and also provide an overview of the reasons for their use, eg economic and environmental savings. Information could include: For the general office user, information on the operation of innovative features, such as automatic blinds, lighting systems, and provide guidance on the impacts of strategies covering window opening and the use of blinds, lighting and heating control. For the facilities manager, as above, plus information on airtightness and solar gain, eg the impact of leaving windows, doors open in an air-conditioned office or use of blinds in winter with respect to solar gain."
(1) In relation to the declaration at paragraph 6.1(a) this should not be made, but a declaration could be made to reflect my decision as to the true construction.(2) Declaration 6.1(b) should be reworded to draw a distinction between dry resultant design temperatures and control air temperatures and to reflect the fact that the "± 2°C" does not apply to dry resultant design temperatures.
(3) Declaration 6.1(c) should not be made, but a declaration could be made to reflect my decision as to the issue of construction.
(4) Declaration 6.1(d) and (e) should not be made, as this aspect does not raise an issue on which I consider it is appropriate for the court to make a binding declaration.
6.1 (a) A declaration that on a true construction of the Specification the heating and/or cooling system in the Building should be adequately sized to be able to maintain and/or control the air temperature throughout the office space in the Building at 22°C (± 2°C) for the period when the building is in heating mode in that the supply air temperature is scheduled against outside air temperature in accordance with Clause 4.10 of the Category A Works Specification set out above and 24°C (± 2°C) for the period when the supply air temperature is not scheduled against the outside air temperature (save in circumstances where the external design conditions of -4°C and 29°C are exceeded).(b) A declaration that on a true construction of the Specification the ± 2°C of tolerance and fluctuation around the specified air temperatures are just that, a tolerance and fluctuation around the specified value and not an addition to the specified values.
(c) A declaration that on a true construction of the Specification the blinds are to be used for local manual solar glare control and not to be taken into consideration, when sizing the chilled beams in the office areas in the Building.
(d) Alternatively, a declaration that it would not be standard practice for the designer to include for the effect sof blinds when sizing the chilled beams in the office areas in this Building.
(e) In the event that the Court finds that the designer was entitled to take account of blinds (which is denied), a declaration as to what types of blinds and what proportion of those blinds (including in particular the percentage that are open) which the designer is entitled to take account of it in this regard.