(1) PERSONS UNKNOWN WHO, IN CONNECTION WITH ENVIRONMENTAL PROTESTS BY THE 'JUST STOP OIL' OR 'EXTINCTION REBELLION' OR 'INSULATE BRITAIN' OR 'YOUTH CLIMATE SWARM' (ALSO KNOWN AS YOUTH SWARM) MOVEMENTS ENTER OR REMAIN WITHOUT THE CONSENT OF THE FIRST CLAIMANT UPON ANY OF THE 8 SITES (defined below) (2) PERSONS UNKNOWN WHO, IN CONNECTION WITH ENVIRONMENTAL PROTESTS BY THE 'JUST STOP OIL' OR 'EXTINCTION REBELLION' OR 'INSULATE BRITAIN' OR 'YOUTH CLIMATE SWARM' (ALSO KNOWN AS YOUTH SWARM) MOVEMENTS CAUSE BLOCKADES, OBSTRUCTIONS OF TRAFFIC AND INTERFERE WITH THE PASSAGE BY THE CLAIMANTS AND THEIR AGENTS, SERVANTS, EMPLOYEES, LICENSEES, INVITEES WITH OR WITHOUT VEHICLES AND EQUIPMENT TO, FROM, OVER AND ACROSS THE ROADS IN THE VICINITY OF THE 8 SITES (defined below) (3) MRS ALICE BRENCHER AND 16 OTHERS |
Defendants |
____________________
(instructed by CMS Cameron McKenna Nabarro Olswang LLP) for the Claimant.
The Defendants did not appear.
Hearing date: 17th January 2024
____________________
Crown Copyright ©
Mr Justice Ritchie:
The Parties
2.1 Just Stop Oil.
2.2 Extinction Rebellion.
2.3 Insulate Britain.
2.4 Youth Climate Swarm.
I have been provided with a little information about the persons who set up and run some of these 4 Organisations. They appear to be crowdfunded partly by donations. A man called Richard Hallam appears to be a co-founder of 3 of them.
The 8 Sites
4.1 the first Claimant's Pembroke oil refinery, Angle, Pembroke SA71 5SJ (shown outlined red on plan A in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.2 the first Claimant's Pembroke oil refinery jetties at Angle, Pembroke SA71 5SJ (as shown outlined red on plan B in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.3 the second Claimant's Manchester oil terminal at Churchill Way, Trafford Park, Manchester M17 1BS (shown outlined red on plan C in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.4 the second Claimant's Kingsbury oil terminal at plot B, Trinity Road, Kingsbury, Tamworth B78 2EJ (shown outlined red on plan D in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.5 the second Claimant's Plymouth oil terminal at Oakfield Terrace Road, Cattedown, Plymouth PL4 0RY (shown outlined red on plan E in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.6 the second Claimant's Cardiff oil terminal at Roath Dock, Rover Way, Cardiff CF10 4US (shown outlined red on plan F in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.7 the second Claimant's Avonmouth oil terminal at Holesmouth Road, Royal Edward dock, Avonmouth BS11 9BT (shown outlined red on the plan G in Schedule 1 to the Order made by Bourne J on 28.7.2023);
4.8 the third Claimant's Pembrokeshire terminal at Main Road, Waterston, Milford Haven SA73 1DR (shown outlined red on plan H in Schedule 1 to the Order made by Bourne J on 28.7.2023).
Bundles
Summary
The Issues
10.1 Are the elements of CPR Part 24 satisfied so that summary judgment can be entered?
10.2 Should a final injunction against unknown persons and named Defendants be granted on the evidence presented by the Claimants?
10.3 What should the terms of any such injunction be?
The ancillary applications
Pleadings and chronology of the action
The lay witness evidence
22.1 Laurence Matthews, April 2022, June 2023.
22.2 David Blackhouse, March and April 2022, January, June and November 2023.
22.3 Emma Pinkerton, June and December 2023.
22.4 Kate McCall, March and April 2022, January (x3) 2023.
22.5 David McLoughlin, March 2022, November 2023.
22.6 Adrian Rafferty, March 2022
22.7 Richard Wilcox, April and August 2022, March 2023.
22.8 Aimee Cook, January 2023.
22.9 Anthea Adair, May, July and August 2023.
22.10 Jessica Hurle, January 2024 (x2).
22.11 Certificates of service: supplementary bundles pages 3234-3239.
Service evidence
Substantive evidence
"if it's necessary to prevent some massive harm, some evil, some illegality, some immorality, it's justified, you have a right of necessity to cause harm".
The video concluded with the assertion "there is no question that disruption is effective, the only question is doing enough of it". In the same month Just Stop Oil was encouraging members of the public to sign up for arrestable direct action. In November 2022 Just Stop Oil tweeted that they would escalate their legal disruption. Mr. Blackhouse then summarised what appeared to be statements by Extinction Rebellion withdrawing from more direct action. However Just Stop Oil continued to publish in late 2022 that they would not be intimidated by private injunctions. Mr Blackhouse researched the mission statements of Insulate Britain which contained the assertion that their continued intention included a campaign of civil resistance, but they only had the next two to three years to sort it out and their next campaign had to be more ambitious. Whilst not disclosing the contents of the briefings received from the police it was clear that Mr. Blackhouse asserted, in summary, that the police warned that Just Stop Oil intended to have a high tempo civil resistance campaign which would continue to involve obstruction, tunnelling, lock one and at height protests at petrochemical facilities.
"September 2019
6.5 The Refinery was the target of protest activity in 2019, albeit this was on a smaller scale to that which took place in 2022 at the Kingsbury Terminal. The activity at the Refinery involved the blocking of access roads whereby the protestors used concrete "Lock Ons" i.e. the protestors locked arms, within the concrete blocks placed on the road, whilst sitting on the road to prevent removal. Although it was a non-violent protest it did impact upon employees at the Refinery who were prevented from attending and leaving work. Day to day operations and deliveries were negatively impacted as a result.
6.6…
Friday 1st April 2022
Protestors obstructed the crossroads junction of Trinity Road, Piccadilly Way, and the entrance to the private access road by sitting in the road. They also climbed onto two stationary road tanker wagons on Piccadilly Way, about thirty metres from the same junction, preventing the vehicles from moving, causing a partial obstruction of the road in the direction of the terminal. They also climbed onto one road tanker wagon that had stopped on Trinity Road on the approach to the private access road to the terminal. Fuel supplies from the Valero terminal were seriously disrupted due to the continued obstruction of the highway and the entrance to the private access road throughout the day. Valero staff had to stop the movement of road tanker wagons to or from the site between the hours of 07:40 hrs and 20:30 hrs. My understanding is that up to twenty two persons were arrested by the Police before Valero were able to receive road tanker traffic and resume normal supplies of fuel.
Sunday 3rd April 2022
6.6.1 Protestors obstructed the same entrance point to the private shared access road leading from Trinity Road. The obstructions started at around 02:00 hrs and continued until 17:27 hrs. There was reduced access for road tankers whilst Police completed the removal and arrest of the protestors.
Tuesday 5th April 2022
6.6.2 Disruption started at 04:49 hrs. Approximately twenty protestors blocked the same entrance point to the private shared access road from Trinity Road. They were reported to have used adhesive to glue themselves to the road surface or used equipment to lock themselves together. Police attended and I understand that eight persons were arrested. Road tanker movements at Valero were halted between 04:49 hrs and 10:50 hrs that day.
Thursday 7th April 2022
6.6.3 This was a day of major disruption. At around 00:30 hrs the Valero Terminal Operator initiated an Emergency Shut Down having identified intruders on CCTV within the perimeter of the site. Five video files have been downloaded from the CCTV system showing a group of about fifteen trespassers approaching the rear of the Kingsbury
Terminal across the railway lines. The majority appear to climb over the palisade fencing into the Kingsbury Terminal whilst several others appear to have gained access by cutting mesh fencing on the border with WOSL. There is then footage of protestors in different areas of the site including footage at 00:43 hrs of one intruder walking across the loading bay holding up what appears to be a mobile phone in front of him, clearly contravening site safety rules. He then climbed onto a stationary road tanker on the loading bay. There is clear footage of several others sitting in an elevated position in the pipe rack adjacent to the loading bay. I am also aware that Valero staff reported that two persons climbed the staircase to sit on top of one of the gas oil storage tanks and four others were found having climbed the staircase to sit on the roof of a gasoline storage tank. Police attended and spent much of the day removing protestors from the site enabling it to reopen at 18:00 hrs. There is CCTV footage of one or more persons being removed from top of the stationary road tanker wagon on the loading bays.
6.6.4 The shutdown of more than seventeen hours caused major disruption to road tanker movements that day as customers were unable to access the site.
Saturday 9th April 2022
6.6.5 Protest activity occurred involving several persons around the entrance to the private access road. I believe that Police made three arrests and there was little or no disruption to road tanker movements.
Sunday 10th April 2022
6.6.6 A caravan was left parked on the side of the road on Piccadilly way, between the roundabout junction with the A51 and the entrance to the Shell fuel terminal. Police detained a small group of protestors with the caravan including one who remained within a tunnel that had been excavated under the road. It appeared to be an attempt to cause a closure of one of the two routes leading to the oil terminals.
6.6.7 By 16:00 hrs police responded to two road tankers that were stranded on Trinity Road, approximately 900 metres north of the entrance to the private access road. Protestors had climbed onto the tankers preventing them from being driven any further, causing an obstruction on the second access route into the oil terminals.
6.6.8 The Police managed to remove the protestors on top of the road tankers but 18:00 hrs and I understand that the individual within the tunnel on Piccadilly Way was removed shortly after.
6.6.9 I understand that the Police made twenty-two arrests on the approach roads to the fuel terminals throughout the day. The road tanker wagons still managed to enter and leave the Valero site during the day taking whichever route was open at the time. This inevitably meant that some vehicles could not take their preferred route but could at least collect fuel as required. I was subsequently informed that a structural survey was quickly completed on the road tunnel and deemed safe to backfill without the need for further road closure.
Friday 15th April 2022
6.6.10 This was another day of major disruption. At 04:25 hrs the Valero operator initiated an emergency shutdown. The events were captured on seventeen video files recording imagery from two CCTV cameras within the site between 04:20 hrs and 15:45 hrs that day.
6.6.11 At 04:25 a group of about ten protestors approached the emergency access gate which is located on the northern corner of the site, opening out onto Trinity Road, 600 metres north of the entrance to the shared private access road. They were all on foot and could be seen carrying ladders. Two ladders were used to climb up the outside of the
emergency gate and then another two ladders were passed over to provide a means of climbing down inside the Valero site. Seven persons managed to climb over before a police vehicle pulled up alongside the gate. The seven then dispersed into the Kingsbury Terminal.
6.6.12 The video footage captures the group of four males and three females sitting for several hours on the pipe rack, with two of them (one male and one female) making their way up onto the roof of the loading bay area nearby. The two on the roof sat closely together whilst the male undressed and sat naked for a considerable time sunbathing. The video footage concludes with footage of Police and the Fire and Rescue service working together to remove the two individuals.
6.6.13 The Valero terminal remained closed between 04:30 hrs and 16:00 hrs that day causing major disruption to fuel collections. The protestors breached the site's safety rules and the emergency services needed to use a 'Cherry Picker' (hydraulic platform) during their removal. There were also concerns that the roof panels would not withstand the weight of the two persons sitting on it.
6.6.14 I understand that Police made thirteen arrests in or around Valero and the other fuel terminals that day and had to request 'mutual aid' from neighbouring police forces.
Tuesday 26th April 2022
6.6.15 I was informed that approximately twelve protestors arrived outside the Kingsbury Terminal at about 07:30 hrs, increasing to about twenty by 09:30 hrs. Initially they engaged in a peaceful non obstructive protest but by 10:00 hrs had blocked the entrance to the private access road by sitting across it. Police then made a number of arrests and the obstructions were cleared by 10:40 hrs. On this occasion there was minimal disruption to the Valero site.
Wednesday 27th April 2022
6.6.16 At about 16:00 hrs a group of about ten protestors were arrested whilst attempting to block the entrance to the shared private access road.
Thursday 28th April 2022
6.6.17 At about 12:40 hrs a similar protest took place involving a group of about eight persons attempting to block the entrance to the shared private access road. The police arrested them and opened the access by 13:10 hrs.
Wednesday 4th May 2022
6.6.18 At about 13:30 hrs twelve protestors assembled at the entrance to the shared private access road without incident. I was informed that by 15:49 hrs Police had arrested ten individuals who had attempted to block the access.
Thursday 12th May 2022
6.6.19 At 13:30 hrs eight persons peacefully protested at the entrance to the private access road. By 14:20 hrs the numbers increased to eleven. The activity continued until 20:15 hrs by which time Police made several arrests of persons causing obstructions. I have retained images of the obstructions that were taken during the protest.
Monday 22nd August 2022
6.6.20 Contractors clearing undergrowth alerted Police to suspicious activity involving three persons who were on land between Trinity Road and the railway tracks which lead to the rear of the Valero and WOSL terminals. The location is about 1.5 km from the entrance to the shared private access road to the Kingsbury Terminal. A police dog handler attended and arrested two of the persons with the third making off. Three tunnels were found close to a tent that the three were believed to be sleeping in. The tunnels started on the roadside embankment and two of them clearly went under the road. The entrances were carefully prepared and concealed in the undergrowth. Police agreed that they were 'lock in' positions for protestors intending to cause a road closure along one of the two approach roads to the oil terminals. The road was closed awaiting structural survey. I have retained a collection of the images taken by my staff at the scene.
Tuesday 23rd August 2022
6.6.21 During the morning protestors obstructed a tanker in Trinity Road, approximately 1km from the Valero Terminal. There was also an obstruction of the highway close to the Shell terminal entrance on Piccadilly Way. I understand that both incidents led to arrests and a temporary blockage for road tankers trying to access the Valero site. Later that afternoon another tunnel was discovered under the road on Trinity Way, between the roundabout of the A51 and the Shell terminal. It was reported that protestors had locked themselves into positions within the tunnel. Police were forced to close the road meaning that all road tanker traffic into the Kingsbury Terminal had to approach via Trinity road and the north. It then became clear that the tunnels found on Trinity Road the previous day had been scheduled for use at the same time to create a total closure of the two routes into the fuel terminals.
6.6.22 The closure of Piccadilly Way continued for another two days whilst protestors were removed and remediation work was completed to fill in the tunnels.
Wednesday 14th September 2022
6.6.23 There was serious disruption to the Valero Terminal after protestors blocked the entrance to the private access road. I believe that Police made fifty one arrests before the area was cleared to allow road tankers to access the terminal.
6.6.24 Tanker movements were halted for just over seven hours between mid-day and 19:00 hrs. On Saturday 16th July and Sunday 17th July 2022, the group known as Extinction Rebellion staged a protest in Plymouth city centre. The protest was planned and disclosed to the police in advance and included a march of about two hundred people from the city centre down to the entrance to the Valero Plymouth Terminal in Oakfield Terrace Rd. The access to the terminal was blocked for about two hours. Road tanker movements were re-scheduled in advance minimising any disruption to fuel supplies."
I note that the events of 16th July 2022 are out of chronological order.
Previous decision on the relevant facts
Assessment of lay witnesses
The Law
Summary Judgment
"21. The authorities therefore make clear that in the context of summary judgment the court is by no means barred from evaluating the evidence, and concluding that on the evidence there is no real (as opposed to fanciful) prospect of success. It will of course be cautious in doing so. It will bear in mind the clarity of the evidence available and the potential for other evidence to be available at trial which is likely to bear on the issues. It will avoid conducting a mini-trial. But there will be cases where the court will be entitled to draw a line and say that - even bearing well in mind all of those points - it would be contrary to principle for a case to proceed to trial.
22. So, when faced with a summary judgment application it is not enough to say, with Mr Micawber, that something may turn up . . ."
Final Injunctions
"37 Powers of High Court with respect to injunctions ….
(1) The High Court may by order (whether interlocutory or final) grant an injunction … in all cases in which it appears to the court to be just and convenient to do so.
(2) Any such order may be made either unconditionally or on such terms and conditions as the court thinks just."
"37. Although the judge did correctly identify the test for the grant of an anticipatory injunction, in para 38 of his judgment, unfortunately he fell into error in considering the question whether the injunction granted should be final or interim. His error was in making the assumption that before summary judgment for a final anticipatory injunction could be granted NHL had to demonstrate, in relation to each defendant, that that defendant had committed the tort of trespass or nuisance and that there was no defence to a claim that such a tort had been committed. That error infected both his approach as to whether a final anticipatory injunction should be granted and as to whether summary judgment should be granted.
38. As regards the former, it is not a necessary criterion for the grant of an anticipatory injunction, whether final or interim, that the defendant should have already committed the relevant tort which is threatened. Vastint [2019] 4 WLR 2 was a case where a final injunction was sought and no distinction is drawn in the authorities between a final prohibitory anticipatory injunction and an interim prohibitory anticipatory injunction in terms of the test to be satisfied. Marcus Smith J summarises at para 31(1) the effect of authorities which do draw a distinction between final prohibitory injunctions and final mandatory injunctions, but that distinction is of no relevance in the present case, which is only concerned with prohibitory injunctions.
39. There is certainly no requirement for the grant of a final anticipatory
injunction that the claimant prove that the relevant tort has already been
committed. The essence of this form of injunction, whether interim or final, is that the tort is threatened and, as the passage from Vastint at para 31(2) quoted at para 27 above makes clear, for some reason the claimant's cause of action is not complete. It follows that the judge fell into error in concluding, at para 35 of the judgment, that he could not grant summary judgment for a final anticipatory injunction against any named defendant unless he was satisfied that particular defendant had committed the relevant tort of trespass or nuisance.
40. The test which the judge should have applied in determining whether to grant summary judgment for a final anticipatory injunction was the standard test under CPR r 24.2, namely, whether the defendants had no real prospect of successfully defending the claim. In applying that test, the fact that (apart from the three named defendants to whom we have referred) none of the defendants served a defence or any evidence or otherwise engaged with the proceedings, despite being given ample opportunity to do so, was not, as the judge thought, irrelevant, but of considerable relevance, since it supported NHL's case that the defendants had no real prospect of successfully defending the claim for an injunction at trial."
"82 Building on Cameron [2019] 1 WLR 1471 and the Ineos requirements, it is now possible to set out the following procedural guidelines applicable to proceedings for interim relief against "persons unknown" in protestor cases like the present one:
(1) The "persons unknown" defendants in the claim form are, by definition, people who have not been identified at the time of the commencement of the proceedings. If they are known and have been identified, they must be joined as individual defendants to the proceedings. The "persons unknown" defendants must be people who have not been identified but are capable of being identified and served with the proceedings, if necessary by alternative service such as can reasonably be expected to bring the proceedings to their attention. In principle, such persons include both anonymous defendants who are identifiable at the time the proceedings commence but whose names are unknown and also Newcomers, that is to say people who in the future
will join the protest and fall within the description of the "persons unknown".
(2) The "persons unknown" must be defined in the originating process by reference to their conduct which is alleged to be unlawful.
(3) Interim injunctive relief may only be granted if there is a sufficiently
real and imminent risk of a tort being committed to justify quia timet relief.
(4) As in the case of the originating process itself, the defendants subject to the interim injunction must be individually named if known and identified or, if not and described as "persons unknown", must be capable of being identified and served with the order, if necessary by alternative service, the method of which must be set out in the order.
(5) The prohibited acts must correspond to the threatened tort. They may include lawful conduct if, and only to the extent that, there is no other proportionate means of protecting the claimant's rights.
(6) The terms of the injunction must be sufficiently clear and precise as to enable persons potentially affected to know what they must not do. The prohibited acts must not, therefore, be described in terms of a legal cause of action, such as trespass or harassment or nuisance. They may be defined by reference to the defendant's intention if that is strictly necessary to correspond to the threatened tort and done in non-technical language which a defendant is capable of understanding and the intention is capable of proof without undue complexity. It is better practice, however, to formulate the injunction without reference to intention if the prohibited tortious act can be described in ordinary language without doing so.
(7) The interim injunction should have clear geographical and temporal
limits. It must be time limited because it is an interim and not a final injunction. We shall elaborate this point when addressing Canada Goose's application for a final injunction on its summary judgment application."
"167. These considerations lead us to the conclusion that, although the attempts thus far to justify them are in many respects unsatisfactory, there is no immoveable obstacle in the way of granting injunctions against newcomer Travellers, on an essentially without notice basis, regardless of whether in form interim or final, either in terms of jurisdiction or principle. But this by no means leads straight to the conclusion that they ought to be granted, either generally or on the facts of any particular case. They are only likely to be justified as a novel exercise of an equitable discretionary power if:
(i) There is a compelling need, sufficiently demonstrated by the evidence, for the protection of civil rights (or, as the case may be, the enforcement of planning control, the prevention of anti-social behaviour, or such other statutory objective as may be relied upon) in the locality which is not adequately met by any other measures available to the applicant local authorities (including the making of byelaws). This is a condition which would need to be met on the particular facts about unlawful Traveller activity within the applicant local authority's boundaries.
(ii) There is procedural protection for the rights (including Convention
rights) of the affected newcomers, sufficient to overcome the strong prima facie objection of subjecting them to a without notice injunction otherwise than as an emergency measure to hold the ring. This will need to include an obligation to take all reasonable steps to draw the application and any order made to the attention of all those likely to be affected by it (see paras 226—231 below); and the most generous provision for liberty (ie permission) to apply to have the injunction varied or set aside, and on terms that the grant of the injunction in the meantime does not foreclose any objection of law, practice, justice or convenience which the newcomer so applying might wish to raise.
(iii) Applicant local authorities can be seen and trusted to comply with the most stringent form of disclosure duty on making an application, so as both to research for and then present to the court everything that might have been said by the targeted newcomers against the grant of injunctive relief.
(iv) The injunctions are constrained by both territorial and temporal limitations so as to ensure, as far as practicable, that they neither outflank nor outlast the compelling circumstances relied upon.
(v) It is, on the particular facts, just and convenient that such an injunction be granted. …"
…
"5. The process of application for, grant and monitoring of newcomer injunctions and protection for newcomers' rights
187. We turn now to consider the practical application of the principles affecting an application for a newcomer injunction against Gypsies and Travellers, and the safeguards that should accompany the making of such an order. As we have mentioned, these are matters to which judges hearing such applications have given a good deal of attention, as has the Court of Appeal in considering appeals against the orders they have made. Further, the relevant principles and safeguards will inevitably evolve in these and other cases in the light of experience. Nevertheless, they do have a bearing on the issues of principle we have to decide, in that we must be satisfied that the points raised by the appellants do not, individually or collectively, preclude the grant of what are in some ways final (but regularly reviewable) injunctions that prevent persons who are unknown and unidentifiable at the date of the order from trespassing on and occupying local authority land. We have also been invited to give guidance on these matters so far as we feel able to do so having regard to our conclusions as to the nature of newcomer injunctions and the principles applicable to their grant.
Compelling justification for the remedy
188. Any applicant for the grant of an injunction against newcomers in a Gypsy and Traveller case must satisfy the court by detailed evidence that there is a compelling justification for the order sought. This is an overarching principle that must guide the court at all stages of its consideration (see para 167(i))."
…
"(viii) A need for review
(2) Evidence of threat of abusive trespass or planning breach
218. We now turn to more general matters and safeguards. As we have foreshadowed, any local authority applying for an injunction against persons unknown, including newcomers, in Gypsy and Traveller cases must satisfy the court by full and detailed evidence that there is a compelling justification for the order sought (see para 167(i) above). There must be a strong probability that a tort or breach of planning control or other aspect of public law is to be committed and that this will cause real harm. Further, the threat must be real and imminent. We have no doubt that local authorities are well equipped to prepare this evidence, supported by copies of all relevant documents, just as they have shown themselves to be in making applications for injunctions in this area for very many years.
219. The full disclosure duty is of the greatest importance (see para 167(iii)). We consider that the relevant authority must make full disclosure to the court not just of all the facts and matters upon which it
relies but also and importantly, full disclosure of all facts, matters and arguments of which, after reasonable research, it is aware or could with reasonable diligence ascertain and which might affect the decision of the court whether to grant, maintain or discharge the order in issue, or the terms of the order it is prepared to make or maintain. This is a continuing obligation on any local authority seeking or securing such an order, and it is one it must fulfil having regard to the one-sided nature of the application and the substance of the relief sought. Where relevant information is discovered after the making of the order the local authority may have to put the matter back before the court on a further application.
220. The evidence in support of the application must therefore err on the side of caution; and the court, not the local authority, should be the judge of relevance.
(3) Identification or other definition of the intended respondents to the application
221. The actual or intended respondents to the application must be defined as precisely as possible. In so far as it is possible actually to identify persons to whom the order is directed (and who will be enjoined by its terms) by name or in some other way, as Lord Sumption explained in Cameron [2019] 1 WLR 1471, the local authority ought to do so. The fact that a precautionary injunction is also sought against newcomers or other persons unknown is not of itself a justification for failing properly to identify these persons when it is possible to do so, and serving them with the proceedings and order, if necessary, by seeking an order for substituted service. It is only permissible to seek or maintain an order directed to newcomers or other persons unknown where it is impossible to name or identify them in some other and more precise way. Even where the persons sought to be subjected to the injunction are newcomers, the possibility of identifying them as a class by reference to conduct prior to what would be a breach (and, if necessary, by reference to intention) should be explored and adopted if possible.
(1) The prohibited acts
222. It is always important that an injunction spells out clearly and in everyday terms the full extent of the acts it prohibits, and this is particularly so where it is sought against persons unknown, including newcomers. The terms of the injunction and therefore the prohibited acts must correspond as closely as possible to the actual or threatened unlawful conduct. Further, the order should extend no further than the minimum necessary to achieve the purpose for which it was granted; and the terms of the order must be sufficiently clear and precise to enable persons affected by it to know what they must not do.
223. Further, if and in so far as the authority seeks to enjoin any conduct which is lawful viewed on its own, this must also be made absolutely clear, and the authority must be prepared to satisfy the court that there is no other more proportionate way of protecting its rights or those of others.
224. It follows but we would nevertheless emphasise that the prohibited acts should not be described in terms of a legal cause of action, such as trespass or nuisance, unless this is unavoidable. They should be defined, so far as possible, in non-technical and readily comprehensible language which a person served with or given notice of the order is capable of understanding without recourse to professional legal advisers.
(5) Geographical and temporal limits
225. The need for strict temporal and territorial limits is another important consideration (see para 167(iv)). One of the more controversial aspects of many of the injunctions granted hitherto has been their duration and geographical scope. These have been subjected to serious criticism, at least some of which we consider to be justified. We have considerable doubt as to whether it could ever be justifiable to grant a Gypsy or Traveller injunction which is directed to persons unknown, including newcomers, and extends over the whole of a borough or for significantly more than a year. It is to be remembered that this is an exceptional remedy, and it must be a proportionate response to the unlawful activity to which it is directed. Further, we consider that an injunction which extends borough-wide is likely to leave the Gypsy and Traveller communities with little or no room for manoeuvre, just as Coulson LJ warned might well be the case (see generally, Bromley [2020] PTSR 1043, paras 99—109. Similarly, injunctions of this kind must be reviewed periodically (as Sir Geoffrey Vos MR explained in these appeals at paras 89 and 108) and in our view ought to come to an end (subject to any order of the judge), by effluxion of time in all cases after no more than a year unless an application is made for their renewal. This will give all parties an opportunity to make full and complete disclosure to the court, supported by appropriate evidence, as to how effective the order has been; whether any reasons or grounds for its discharge have emerged; whether there is any proper justification for its continuance; and whether and on what basis a further order ought to be made.
(6) Advertising the application in advance
226. We recognise that it would be impossible for a local authority to give effective notice to all newcomers of its intention to make an application for an injunction to prevent unauthorised encampments on its land. That is the basis on which we have proceeded. On the other hand, in the interests of procedural fairness, we consider that any local authority intending to make an application of this kind must take reasonable steps to draw the application to the attention of persons likely to be affected by the injunction sought or with some other genuine and proper interest in the application (see para 167(ii) above). This should be done in sufficient time before the application is heard to allow those persons (or those representing them or their interests) to make focused submissions as to whether it is appropriate for an injunction to be granted and, if it is, as to the terms and conditions of any such relief.
227. Here the following further points may also be relevant. First, local authorities have now developed ways to give effective notice of the grant of such injunctions to those likely to be affected by them, and they do so by the use of notices attached to the land and in other ways as we describe in the next section of this judgment. These same methods, appropriately modified, could be used to give notice of the application itself. As we have also mentioned, local authorities have been urged for some time to establish lines of communication with Traveller and Gypsy communities and those representing them, and all these lines of communication, whether using email, social media, advertisements or some other form, could be used by authorities to give notice to these communities and other interested persons and bodies of any applications they are proposing to make.
228. Secondly, we see merit in requiring any local authority making an application of this kind to explain to the court what steps it has taken to give notice of the application to persons likely to be affected by it or to have a proper interest in it, and of all responses it has received.
229. These are all matters for the judges hearing these applications to
consider in light of the particular circumstances of the cases before them, and in this way to allow an appropriate practice to develop.
(7) Effective notice of the order
230. We are not concerned in this part of our judgment with whether respondents become party to the proceedings on service of the order upon them, but rather with the obligation on the local authority to take steps actively to draw the order to the attention of all actual and potential respondents; to give any person potentially affected by it full information as to its terms and scope, and the consequences of failing to comply with it; and how any person affected by its terms may make an application for its variation or discharge (again, see para 167(ii) above).
231. Any applicant for such an order must in our view make full and complete disclosure of all the steps it proposes to take (i) to notify all persons likely to be affected by its terms; and (ii) to ascertain the names and addresses of all such persons who are known only by way of description. This will no doubt include placing notices in and around the relevant sites where this is practicable; placing notices on appropriate websites and in relevant publications; and giving notice to relevant community and charitable and other representative groups.
(8) Liberty to apply to discharge or vary
232. As we have mentioned, we consider that an order of this kind ought always to include generous liberty to any person affected by its terms to apply to vary or discharge the whole or any part of the order (again, see para 167(ii) above). This is so whether the order is interim or final in form, so that a respondent can challenge the grant of the injunction on any grounds which might have been available at the time of its grant.
(9) Costs protection
233. This is a difficult subject, and it is one on which we have received little assistance. We have considerable concern that costs of litigation of this kind are way beyond the means of most if not all Gypsies and Travellers and many interveners, as counsel for the first interveners, Friends of the Earth, submitted. This raises the question whether the court has jurisdiction to make a protective or costs capping order. This is a matter to be considered on another day by the judge making or continuing the order. We can see the benefit of such an order in an appropriate case to ensure that all relevant arguments are properly ventilated, and the court is equipped to give general guidance on the difficult issues to which it may give rise.
(10) Cross-undertaking
234. This is another important issue for another day. But a few general points may be made at this stage. It is true that this new form of injunction is not an interim order, and it is not in any sense holding the ring until the final determination of the merits of the claim at trial. Further, so far as the applicant is a public body acting in pursuance of its public duty, a cross undertaking may not in any event be appropriate. Nevertheless, there may be occasions where a cross undertaking is considered appropriate, for reasons such as those given by Warby J in Birmingham City Council v Afsar [2019] EWHC 1619 (QB), a protest case. These are matters to be considered on a case-by-case basis, and the applicant must equip the court asked to make or continue the order with the most up-to-date guidance and assistance.
(11) Protest cases
235. The emphasis in this discussion has been on newcomer injunctions in Gypsy and Traveller cases and nothing we have said should be taken as prescriptive in relation to newcomer injunctions in other cases, such as those directed at protesters who engage in direct action by, for example, blocking motorways, occupying motorway gantries or occupying HS2's land with the intention of disrupting construction. Each of these activities may, depending on all the circumstances, justify the grant of an injunction against persons unknown, including newcomers. Any of these persons who have notice of the order will be bound by it, just as effectively as the injunction in the proceedings the subject of this appeal has bound newcomer Gypsies and Travellers.
236. Counsel for the Secretary of State for Transport has submitted and we accept that each of these cases has called for a full and careful assessment of the justification for the order sought, the rights which are or may be interfered with by the grant of the order, and the proportionality of that interference. Again, in so far as the applicant seeks an injunction against newcomers, the judge must be satisfied there is a compelling need for the order. Often the circumstances of these cases vary significantly one from another in terms of the range and number of people who may be affected by the making or refusal of the injunction sought; the legal right to be protected; the illegality to be prevented; and the rights of the respondents to the application. The duration and geographical scope of the injunction necessary to protect the applicant's rights in any particular case are ultimately matters for the judge having regard to the general principles we have explained."
Cause of action
(1) There must be a civil cause of action identified in the claim form and particulars of claim. The usual quia timet (since he fears) action relates to the fear of torts such as trespass, damage to property, private or public nuisance, tortious interference with trade contracts, conspiracy with consequential damage and on-site criminal activity.
Full and frank disclosure by the Claimant
(2) There must be full and frank disclosure by the Claimant (applicant) seeking the injunction against the PUs.
Sufficient evidence to prove the claim
(3) There must be sufficient and detailed evidence before the Court on the summary judgment application to justify the Court finding that the immediate fear is proven on the balance of probabilities and that no trial is needed to determine that issue. The way this is done is by two steps. Firstly stage (1), the claimant has to prove that the claim has a realistic prospect of success, then the burden shifts to the defendant. At stage (2) to prove that any defence has no realistic prospect of success. In PU cases where there is no defendant present, the matter is considered ex-parte by the Court. If there is no evidence served and no foreseeable realistic defence, the claimant is left with an open field for the evidence submitted by him and his realistic prospect found at stage (1) of the hearing may be upgraded to a balance of probabilities decision by the Judge. The Court does not carry out a mini trial but does carry out an analysis of the evidence to determine if it the claimant's evidence is credible and acceptable. The case law on this process is set out in more detail under the section headed "The Law" above.
No realistic defence
(4) The defendant must be found unable to raise a defence to the claim which has a realistic prospect of success, taking into account not only the evidence put before the Court (if any), but also, evidence that a putative PU defendant might reasonably be foreseen as able to put before the Court (for instance in relation to the PUs civil rights to freedom of speech, freedom to associate, freedom to protest and freedom to pass and repass on the highway). Whilst in National Highways the absence of any defence from the PUs was relevant to this determination, the Supreme Court's ruling in Wolverhampton enjoins this Court not to put much weight on the lack of any served defence or defence evidence in a PU case. The nature of the proceedings are "ex-parte" in PU cases and so the Court must be alive to any potential defences and the Claimants must set them out and make submissions upon them. In my judgment this is not a "Micawber" point, it is a just approach point.
Balance of convenience – compelling justification
(5) In interim injunction hearings, pursuant to American Cyanamid v Ethicon [1975] AC 396, for the Court to grant an interim injunction against a defendant the balance of convenience and/or justice must weigh in favour of granting the injunction. However, in PU cases, pursuant to Wolverhampton, this balance is angled against the applicant to a greater extent than is required usually, so that there must be a "compelling justification" for the injunction against PUs to protect the claimant's civil rights. In my judgment this also applies when there are PUs and named defendants.
(6) The Court must take into account the balancing exercise required by the Supreme Court in DPP v Ziegler [2021] UKSC 23, if the PUs' rights under the European Convention on Human Rights (for instance under Articles 10(2) and 11(2)) are engaged and restricted by the proposed injunction. The injunction must be necessary and proportionate to the need to protect the Claimants' right.
Damages not an adequate remedy
(7) For the Court to grant a final injunction against PUs the claimant must show that damages would not be an adequate remedy.
(B) Procedural Requirements
Identifying PUs
(8) The PUs must be clearly and plainly identified by reference to: (a) the tortious conduct to be prohibited (and that conduct must mirror the torts claimed in the Claim Form), and (b) clearly defined geographical boundaries, if that is possible.
The terms of injunction
(9) The prohibitions must be set out in clear words and should not be framed in legal technical terms (like "tortious" for instance). Further, if and in so far as it seeks to prohibit any conduct which is lawful viewed on its own, this must also be made absolutely clear and the claimant must satisfy the Court that there is no other more proportionate way of protecting its rights or those of others.
The prohibitions must match the claim
(10) The prohibitions in the final injunctions must mirror the torts claimed (or feared) in the Claim Form.
Geographic boundaries
(11) The prohibitions in the final injunctions must be defined by clear geographic boundaries, if that is possible.
Temporal limits - duration
(12) The duration of the final injunction should be only such as is proven to be reasonably necessary to protect the claimant's legal rights in the light of the evidence of past tortious activity and the future feared (quia timet) tortious activity.
Service
(13) Understanding that PUs by their nature are not identified, the proceedings, the evidence, the summary judgment application and the draft order must be served by alternative means which have been considered and sanctioned by the Court. The applicant must, under the Human Rights Act 1998 S.12(2), show that it has taken all practicable steps to notify the respondents.
The right to set aside or vary
(14) The PUs must be given the right to apply to set aside or vary the injunction on shortish notice.
Review
(15) Even a final injunction involving PUs is not totally final. Provision must be made for reviewing the injunction in the future. The regularity of the reviews depends on the circumstances. Thus such injunctions are "Quasi-final" not wholly final.
Applying the law to the facts
(A) Substantive Requirements
Cause of action
Full and frank disclosure
Sufficient evidence to prove the claim
No realistic defence
"9. The following general principles are well-settled, and uncontroversial on this appeal.
(1) Peaceful protest falls within the scope of the fundamental rights of free speech and freedom of assembly guaranteed by Articles 10(1) and 11(1) of the European Convention on Human Rights and Fundamental Freedoms. Interferences with those rights can only be justified if they are necessary in a democratic society and proportionate in pursuit of one of the legitimate aims specified in Articles 10(2) and 11(2). Authoritative statements on these topics can be found in Tabernacle v Secretary of State for Defence [2009] EWCA Civ 23 [43] (Laws LJ) and City of London v Samede [2012] EWCA Civ 160 [2012] 2 All ER 1039, reflecting the Strasbourg jurisprudence.
(2) But the right to property is also a Convention right, protected by Article 1 of the First Protocol ('A1P1'). In a democratic society, the protection of property rights is a legitimate aim, which may justify interference with the rights guaranteed by Article 10 and 11. Trespass is an interference with A1P1 rights, which in turn requires justification. In a democratic society, Articles 10 and 11 cannot normally justify a person in trespassing on land of which another has the right to possession, just because the defendant wishes to do so for the purposes of protest against government policy. Interference by trespass will rarely be a necessary and proportionate way of pursuing the right to make such a protest."
Balance of convenience – compelling justification
Damages not an adequate remedy
(B) Procedural Requirements
Identifying PUs
The terms of the injunction
The prohibitions must match the claim
Geographic boundaries
Temporal limits - duration
Service
The right to set aside or vary
Review
Conclusions