QUEEN'S BENCH DIVISION
PLANNING COURT
Strand, London, WC2A 2LL |
||
B e f o r e :
____________________
THE QUEEN on the application of RICHARD WILLIAM TOMKINS |
Claimant |
|
- and - |
||
CITY OF LONDON CORPORATION |
Defendant |
____________________
Stephen Whale (instructed by Comptroller and City Solicitor) for the Defendant
Hearing dates: 29 & 30 June 2021
____________________
Crown Copyright ©
Mrs Justice Lang :
Grounds of challenge
i) In the previous statutory challenge, the Court held that the ETO was an experiment to assess the benefits and disadvantages of restricting vehicle access to Beech Street, in order to improve air quality, which could inform the planned future development of Beech Street. The impact of the pandemic on traffic levels could not have reasonably been foreseen either on 3 December 2019 when the relevant Committee decided to make the ETO or on 2 March 2020 when the ETO was actually made.
ii) There is no authority to support the proposition that the experiment must be "meaningful". But in any event, it has been possible to conduct a meaningful experiment during the currency of the ETO.
iii) Unlike the experiment in the Trail Riders case, this experiment has a rational basis and it has not become incapable of answering the question it was set up to test.
Facts
Beech Street and the impact of the ETO
The introduction of the ETO
"The scheme will initially be implemented under an experimental traffic order which will run for a maximum of 18 months. During the time of the experiment there will be extensive monitoring undertaken…
For an experimental traffic order public consultation is undertaken for the first six months of the order. A report will be brought back to Committees towards the end of 2020 summarising the outcomes of the monitoring and the public consultation exercise for members to take a decision on whether the scheme becomes permanent or not."
"Beech Street
"The restriction of motor vehicles to only those with zero emissions will improve the air quality in Beech Street which is a fully enclosed tunnel-like street which does not allow traffic fumes to ventilate to the atmosphere."
Bridgewater Street and Golden Lane
"The closure of these junctions will allow improvements to the streetscape in Beech Street to compliment [sic] the anticipated improvement in air quality that the motor vehicle restriction will deliver. A very low number of vehicles would be expected to use these junctions with the restriction in place in Beech Street.""
"If the provisions of the Order made under section 9 continue in operation for a period of not less than six months, the Council will consider in due course whether the provisions of the Order should be reproduced and continued in force indefinitely by means of an Order made under section 6 of the Road Traffic Regulation Act 1984. Persons desiring to object to the making of an Order under section 6 of the said Act of 1984 for the purpose of such reproduction and continuation in force may, within the aforementioned period of six months send a statement in writing of their objection and the grounds thereof to the Traffic Orders Officer, City Transportation, City of London, PO Box 270, Guildhall, London EC2P 2EJ …."
"…Officers were cognisant of the fact that, due to lockdown, there had been a huge reduction in traffic volumes in the City and that it was therefore not possible to truly monitor the impact of this experimental traffic order on either air quality or traffic on surrounding streets. The public were also not able to accurately feedback on how this experiment was impacting on them all of which would be very important when evaluating how successful the experiment is and making a decision as to whether it would be retained or not. Members were further advised that a decision had been made … to extend the public consultation period and the objection period beyond the initial six months previously agreed…."
i) Option 1: approve the conclusion of the ETO and report on the outcomes.
ii) Option 2: approve the continuation of the ETO until September 2021 with the changes to the central reservation made immediately. Continue to monitor the impacts while working towards consultation on a permanent scheme, based on the experiment as amended.
iii) Option 3: approve the conclusion of the ETO. Develop and consult on traffic and public realm options for an alternative type of traffic restriction in Beech Street that also delivers the objectives of the Beech Street Transportation and Public Realm project in the medium to longer term (i.e. move on to Phase 2).
"The Defendant shall not take any further steps in respect of the making of any traffic order, which has the effect of continuing in force or replicating the provisions of the City of London (Beech Street) (No. 1) Experimental Order 2020 prior to the final determination of this claim for judicial review or further order."
The Claimant's statutory challenge in 2020
i) ground 3 (failing to consider whether to hold a public inquiry under regulation 9 of the 1996 Regulations);
ii) ground 5 (failing to comply with the requirement in Schedule 2 to the 1996 Regulations and regulation 23(3)(b) of the 1996 Regulations to make the relevant documents available for public inspection);
iii) ground 6 (failing to provide an adequate statement of reasons as required by paragraph 2(d) of Schedule 2 to the 1996 Regulations).
i) In respect of its Experimental Traffic Order made on 2 March 2020 the Defendant failed to comply with the requirement in Schedule 2 to the Local Authorities' Traffic Orders (Procedure)(England and Wales) Regulations 1996 to make the deposited documents available for public inspection. The requirement in regulation 23(3)(b) of those regulations has therefore not been met in relation to that order.
ii) The statement of reasons provided in connection with the Defendant's Experimental Traffic Order made on 2 March 2020 was unlawful as it was inadequate and did not comply with the requirements in paragraph 2(d) of Schedule 2 to the Local Authorities' Traffic Orders (Procedure)(England and Wales) Regulations 1996. The requirement in regulation 23(3)(c) of those regulations has therefore not been met in relation to that order.
"125. It was common ground between the parties that the validity of the ETO is conditional on there being a genuine experiment. In UK Waste Management Limited v West Lancashire District Council [1996] QB 201, Carnwath J. said "for there to be a valid experimental order there must be an experiment and the traffic authority must be able to explain what it is" (208F). In Trail Riders Fellowship v Peak District National Park Authority, Ouseley J. said "[t]he statutory provisions clearly require that an experiment should underlie the ETRO, and that it should be identified in the Statement of Reasons" (at [30]).
126. I accept Mr Ormondroyd's submission that the scheme is an experiment as to the benefits and disadvantages of restricting vehicle access to Beech Street, in order to improve air quality. In my view, this is not necessarily inconsistent with the longer term plans to re-develop Beech Street in 2024, and the outcome of the experiment may inform the development of Beech Street, particularly with the changing targets for switching to zero emission vehicles.
127. As to the Claimant's alternative submission, Mr Ormondroyd is correct in his submission that this challenge under paragraph 35 of Schedule 9 to the RTRA 1984 has to be directed at the validity of the making of the ETO. The impact of the pandemic on traffic levels in Beech Street could not reasonably have been foreseen by the City when it decided to make the ETO at the meeting on 3 December 2019, nor when it actually made the ETO on 2 March 2020.
128. The Claimant's challenge to the continuation of the ETO should have been brought by way of a separate judicial review challenge to the City's decision not to revoke or suspend the ETO, by way of a further order, once the impact of the lockdown became apparent. The City made this decision on 13 May 2020. He cannot pursue a challenge to that decision in this claim. However, it is open to him to invite the City to re-consider its decision, in the light of the second phase of the pandemic and the further lockdown which may not have been anticipated at the time of the decision in May 2020.
129. Therefore ground 7 does not succeed."
Statutory framework
The RTRA 1984
"(1) It shall be the duty of every strategic highways company and local authority upon whom functions are conferred by or under this Act, so to exercise the functions conferred on them by this Act as (so far as practicable having regard to the matters specified in subsection (2) below) to secure the expeditious, convenient and safe movement of vehicular and other traffic (including pedestrians) and the provision of suitable and adequate parking facilities on and off the highway or, in Scotland, the road.
(2) The matters referred to in subsection (1) above as being specified in this subsection are—
(a) the desirability of securing and maintaining reasonable access to premises;
(b) the effect on the amenities of any locality affected and (without prejudice to the generality of this paragraph) the importance of regulating and restricting the use of roads by heavy commercial vehicles, so as to preserve or improve the amenities of the areas through which the roads run;
(bb) the strategy prepared under section 80 of the Environment Act 1995 (national air quality strategy);
(c) the importance of facilitating the passage of public service vehicles and of securing the safety and convenience of persons using or desiring to use such vehicles; and
(d) any other matters appearing to the strategic highways company or the local authority to be relevant."
The 1996 Regulations
"23. Orders giving permanent effect to experimental orders
(1) This regulation applies where the sole effect of an order ("a permanent order"), which is not an order made under section 9 of the 1984 Act, is to reproduce and continue in force indefinitely the provisions of an experimental order or of more than one such order ("a relevant experimental order"), whether or not that order has been varied or suspended under section 10(2) of the 1984 Act.
(2) Regulations 6 (consultation), 7 (notice of proposals) and 8 (objections) shall not apply to a permanent order where the requirements specified in paragraph (3) have been complied with in relation to each relevant experimental order.
(3) The requirements are that-
(a) the notice of making contained the statements specified in Schedule 5;
(b) deposited documents (including the documents referred to in sub-paragraphs (c) and (e)) were kept available for inspection, subject to Part VI, in accordance with Schedule 2 throughout the whole of the period specified in regulation 22(4);
(c) the deposited documents included a statement of the order making authority's reasons for making the experimental order;
(d) no variation or modification of the experimental order was made more than 12 months after the order was made; and
(e) where the experimental order has been modified in accordance with section 10(2) of the 1984 Act; a statement of the effect of each such modification has been included with the deposited documents.
(4) In the application of regulations 10, 11 and 13 and Schedule 3 to a permanent order to which regulations 6, 7 and 8 do not apply by virtue of paragraph (2)-
(a) the notices of making published in respect of each relevant experimental order shall be treated as the notice of proposals published under regulation 7(1)(a) in respect of the permanent order;
(b) any objection made in accordance with the statement included by virtue of paragraph (3)(a) in the notice of making published in respect of a relevant experimental order shall be treated as an objection duly made under regulation 8 to the permanent order."
"1. That the order making authority will be considering in due course whether the provisions of the experimental order should be continued in force indefinitely.
2. That within a period of six months-
(a) beginning with the day on which the experimental order came into force, or
(b) if that order is varied by another order or modified pursuant to section 10(2) of the 1984 Act, beginning with the day on which the variation or modification or the latest variation or modification came into force,
any person may object to the making of an order for the purpose of such indefinite continuation.
3. That any such objection must-
(a) be in writing;
(b) state the grounds on which it is made; and
(c) be sent to an address specified for the purpose in the notice of making."
Conclusions
"30. Crucial to this ground, and of importance for the other grounds, is whether the ETRO was made for an experimental purpose. The statutory provisions clearly require that an experiment should underlie the ETRO ….
….
34. The experiment, such as it is, is to see what effect a prohibition on MPVs using the BOAT would have on its surface condition. A secondary purpose was to see what effect there would be on the usage of other recognised routes to which the MPVs might divert …..
35. Mr Pay's criticisms of that as an experiment are to my mind well founded in law. I accept Mr Green's point that it is not for the Court to decide whether the experiment is a valuable one, or whether a more sophisticated one would be better. But the criticisms go rather beyond that. First, I accept that it is irrational to have an experiment to see what effect the prohibition would have, when the surface of much of the BOAT has been repaired to some degree, since the ETRO came into force. This experiment cannot test what effect the prohibition will have, because MPVs have not used the repaired surface….. The experiment became incapable of answering the question it had been purportedly set up to test. The fact that the surface would be repaired early on in the period of prohibition introduced by the ETRO did not change the express justification for the ETRO; the draft and final Statements of Reasons are identical in this respect. If, on the other hand the experiment was intended to be independent of the repair to the surface, it is impossible to discern from the Statement of Reasons what that experiment might be. The experiment which I discern from the Statement of Reasons has no rational basis.
36. Second, ignoring the repairs, it is impossible to avoid the conclusion that the NPA was already very well aware of the harmful effect which the MPVs had had on the surface of the BOAT; that usage had been going on for a number of years over which time the damage had become evident, albeit exacerbated by the effect of water draining down the surface. The serious rutting is caused by the tyres of MPVs rather than pedal bicycles. There is no indication that this was an experiment to see if the surface could regenerate itself naturally if MPVs were banned, and it would not make much sense to do so if it were repaired anyway. So again, the experiment described can clearly be seen to be no experiment at all."
"I accept that the monitoring exercise is not at an advanced stage and there is only sparse evidence at present of its fruits. But the experiment is real enough. The monitoring policy published in December 2020 set out what so far have turned out to be, I agree, aspirations rather than achievements; but there has been some progress…."
"The scheme will be monitored for a minimum of six months after it has been implemented, with the project's success criteria agreed with TfL and Islington Council as follows:
- Significant improvement in air quality – a measured reduction along Beech Street, with the wider monitored area not being any worse than predicted in the model
- Maintain current access and servicing arrangements – residents, visitors and businesses are not negatively impacted by the scheme
- Traffic or bus journey times on the surrounding routes identified in the monitoring strategy are not unreasonably impacted.
In addition to measuring how well the scheme is meeting its key objectives, the following will also be monitored:
- Noise levels…
- Public perception ….
- Compliance rate ….
- Taxis …
- Safety at surrounding junctions …..
- Vehicle volumes on surrounding streets …"
"The Zero Emission Street (Phase 1) was implemented on 18 March 2020 to improve air quality (NO2), with the coming into force of the …(ETO) restricting vehicle access other than for zero emission vehicles. The ETO was made in order to determine the impacts of the restriction with a comprehensive monitoring strategy for measuring the impact on air quality, traffic flows, noise and perception."
"4. Issue Description
Impact of COVID-19 pandemic
24. The experiment has been impacted in various ways by the COVID-19 pandemic, including reduced traffic levels and the subsequent improvement in general air quality across Central London. The background picture is also influenced by the on-street traffic management measures implemented by the City Corporation and Transport for London (TfL) in response to COVID-19.
25. Many people have not been in the City since the experiment began, pedestrian volumes are down by 76% and many residents will have been isolating. For these reasons people generally have not been able to experience the full benefits and disbenefits of the scheme. We have also been unable to host public consultation events that would ordinarily be held. Instead we have liaised with resident association groups and have used letter drops to direct residents to our online survey as well as ongoing communication with user and trade representatives. Nevertheless, there were over one hundred consultation responses from the public on the ETO, indicating that some stakeholders have felt able to reach some views on the scheme.
26. Despite the lower traffic volumes in the City overall, the experiment has already yielded some useful data on compliance rates with the restriction NO2 levels in Beech Street and on the surrounding streets; and road users' understanding of the restrictions to access properties and make deliveries.
27. The monitoring of the positive impacts and disbenefits of the scheme was set out in the agreed Monitoring Strategy which was prepared in consultation with TfL, London Borough Islington and the Barbican Association. A summary of the current status of the monitoring elements is included in Appendix 5.
28. No traffic counts on the surrounding road network have been undertaken to date. During summer 2020, while traffic levels were increasing it was anticipated that near normal levels would return well within the experimental period and counts would be best done at that stage. Traffic levels are not now anticipated to normalise for some time, and potentially, not until after the experimental period ends in September 2021.
29. In response to the pandemic a number of alterations have been made to streets in the City to provide space for social distancing. These changes are likely to be have impacted on traffic movement on the streets surrounding Beech Street.
30. Traffic volumes and travel patterns are likely to fluctuate in the City in the short-medium term due to a combination factors (i.e. workplace behavioural change; traffic interventions in response to COVID-19 taken by the City Corporation and TfL; and a decline/recovery in economic activity).
31. Nevertheless, it is considered that some useful data regarding traffic patterns can still be obtained even while traffic levels are depressed. By measuring the vehicle movements made by the reduced number of vehicles currently using the road network, the likely movements of greater vehicular traffic volumes can be extrapolated."
"EXPERIMENTAL TRAFFIC ORDER – Key findings to date
Traffic
37. Traffic volumes on Beech Street have declined significantly due to the combined effects of the ETO and the pandemic.
38. Average weekday traffic volumes for through traffic on Beech Street are ~ 350 per day, less than 5% of the pre- scheme flows (approximately 9500 vehicles). In addition, approximately 200 vehicles per day access the carparks and forecourts from Beech Street.
39. The very low volumes of through traffic on Beech Street do suggest a good level of compliance with the restriction.
40. There has been some feedback from residents who feel that traffic has increased on Moor Lane and Fore Street. This will be checked by traffic counts. This was anticipated in the modelling undertaken before the scheme was implemented but may also be due to other traffic routes in the City being restricted through temporary COVID-19 Transportation schemes.
41. In September 2020 traffic had returned to over 66% on key City routes, though traffic volumes on local access streets were lower. In January 2021 TfL reported traffic remained over 50% on key City routes but local City streets appear very quiet.
42. Traffic counts are planned to be undertaken during March at the previously agreed locations set out in the Monitoring Strategy.
43. If Option 2 is agreed it would be proposed to carry out traffic counts both before and after the proposed ETO amendments, from which likely future traffic patterns could be reasonably well understood and assessed. With up to seven months left that the ETO can remain in force, there is a reasonable expectation that traffic levels could increase to more normal levels. This could potentially allow for additional counts to provide further data to be gathered regarding likely impacts the Beech Street restriction has on adjacent streets and for the public (residents, visitors, workers) to experience a more representative scenario.
44. The data collected and the public consultation outcomes can then be used to help inform Members' decision making on whether to make a new permanent order in the same terms as the ETO (with or without the proposed amendments) in July.
Air Quality
45. The main objective for Phase 1 of the project is for the improvement in levels of NO2 in Beech Street. The World Health Organisation guidelines for NO2 recommend a maximum annual average of 40 µm3. The annual average level of NO2 measured in 2019 was 55 µm3. Since March 2020, measured air quality measured by the continuous monitor in Beech Street has significantly improved to an average of 25 µm3. This 55% reduction is due to reduced vehicle volumes created by both the experimental restriction and the overall improved in NO2 levels in the City attributed to the COVID-19 lockdown and restrictions on movement (see Appendix 4).
46. NO2 levels at 26 sites around Beech Street have been measured using diffusion tubes. As would be expected due to the reduced traffic volumes, most of these locations have seen an improvement of between 2-30%. The only exception in the City is Aldersgate Street which has seen a slight increase. Two locations in Islington, Fortune Street and Bunhill Row also show slight increases and require further investigation. (Note that the 2020 diffusion tube data is still preliminary and likely to change slightly following standard annualisation and bias adjustment).
47. It is difficult to accurately attribute how much of the air quality improvement is due to the Zero Emission Scheme restriction and how much is due to the impact of the pandemic as there are many factors which influence NO2 levels in the City such as traffic, meteorological conditions and the time of year. But it is a fair assumption that air quality in Beech Street has improved by more than the surrounding streets during the pandemic, implying that the restriction has helped improve air quality in the tunnel.
48. The relationship between traffic volumes and NO2 in Beech Street is not linear due to the influences of background air pollution and the enclosed tunnel factor. The air quality data that has been gathered from the experiment will be used to calibrate the air quality model for the area.
49. This air quality model will then be used to forecast:
... the approximate volumes of traffic that could be accommodated in Beech Street whilst keeping NO2 within the WHO guidelines.
... the likely air quality measurements at locations around Beech Street based on different traffic volume scenarios
50. In the event traffic volumes do begin to return to more normal levels, further useful air quality measurements will be available from both the continuous monitor and the diffusion tubes.
Legibility (understanding of restriction)
51. This was the first implementation of a Zero Emission Street in England. Guidance for local Zero Emission Zones is provided by Transport for London (TfL) and the criteria has been followed for the scheme design. Approval of the restriction signage was granted by the Department for Transport in early 2020.
52. From 18 March until the 2 August, the restriction was enforced passively. In this time warning notices were issued to raise awareness of the restriction. Active enforcement with the issues of Penalty Charge Notices began on 27 July.
53. Of the through traffic using Beech Street, an average of 150 PCNs are being issued each day. With new traffic restrictions we usually experience an improvement in compliance over time. Because traffic volumes have been low during large parts of the experiment it is expected that this number would initially increase as traffic volumes return at the end of lockdown restrictions, before motorists become more aware of the restriction. This is likely to also impact on the air quality measurements for a short period of time.
54. It is difficult to accurately estimate what the percentage level of compliance with the restriction would be if the pandemic had not occurred. Due to the longer warning notice period and the very prominently placed signing, a reasonable assumption is that compliance should eventually reach similar levels to Bank Junction. This is 96%. If the same percentage of traffic was to contravene the restriction, and if vehicle numbers in the City return to pre-COVID levels, this number of compliant vehicles may increase.
Access to properties
55. Generally, it appears that residents in the wider area now understand the restriction and how to access their property.
56. Residents whose properties are not on Beech Street have not yet experienced the possible longer journey times that were expected from using the alternate routes, due to lower traffic volumes. The majority of enquiries received about access issues have come from the Barbican Estate area, comparatively much fewer have been from the Golden Lane Estate area and Bunhill Ward area in Islington.
57. Some businesses have yet to experience the true impact of the restriction on their normal business operations.
58. One of the key design features of the scheme was to continue to allow access to properties within the area of restriction on Beech Street. To do this, a sign plate below the main sign was provided "Except for zero emission vehicles and for access to off-street premises". This allows all vehicles to access:
... The Virgin Active service area
... Cromwell Tower forecourt and ground floor car park
... Barbican Centre Car Park (no. 5)
... Refuse collection area
... Defoe House/Shakespeare Tower
... Lauderdale Place
59. Vehicles must access these locations in the correct direction due to the central reservation. Some residents for Defoe House and Shakespeare Tower coming from Aldersgate Street have traditionally travelled through Beech Street eastbound and then performed a U-turn or turn around via Silk Street. This has meant a technical infringement as they have travelled along Beech Street without accessing an off-street premise and have activated the entry and exit camera trigger. The exception to this rule is access to Cromwell Tower forecourt which can be made as there has been a gap in the central reservation for some years and the right turn is able to be performed before the camera trigger point. There is a U-turn ban at this location, which prevents drivers wishing to access the Defoe / Shakespeare carpark or Lauderdale Place from performing this manoeuvre.
60. There have been clear issues with some taxis and delivery drivers not understanding the restriction. On occasion this has resulted in the driver refusing to enter Beech Street. This is acknowledged as a frustrating situation for a number of residents. Following discussions with the Barbican Association, additional temporary signing has been deployed to reinforce the message that access to Beech Street is permitted for any vehicle with a legitimate off-street activity i.e. parking, loading, drop-off, pick-up.
61. Determining the quantum of scale of the access issue to residential properties is a challenge as not every resident will write to the Project team each time their delivery or taxi does not arrive. The Barbican Association has also been handling some enquiries about missed deliveries from Barbican residents. However, it is acknowledged that over 250 enquiries and complaints have been received from residents in relation to access issues.
62. The view of the Barbican Estate Office Car Park Manager is that the vast majority of deliveries are made successfully. The number of deliveries has increased during the pandemic.
63. The electric taxi fleet has grown to 1 in 4 taxis, people seeking to hail a taxi on Beech Street are still able to do so. Due to the lack of frontage, there is modest demand for hailing taxis on street compared to other City locations, mostly from residents exiting their properties at street level. The reduced numbers of taxis may mean it now takes longer to hail a taxi from the footway.
64. Officers have endeavoured to communicate to a wide range of taxi, private hire and delivery organisations about the details of the restriction. The success of this has been mixed due to the varied nature of these (often national) companies and how they cascade the information. Officers also meet regularly with representatives of the taxi trade. There is a perception from some residents that taxis avoid the area and refuse to enter Beech Street, however the trade representatives do not report any confusion amongst their members. Officers will continue to push this message.
65. The access issue is likely exacerbated by the fact that many delivery and private hire vehicles use Google maps as their default Satnav (which shows no access on Beech Street), as it lacks the functionality to allow for electric vehicles and those vehicles accessing off-street premises. This awareness has provided a useful outcome of the experiment to date. Officers are considering how this can be further mitigated and if Option 2 is agreed the continued experimental period will provide a useful opportunity to explore mitigations and evaluate their effects.
Equalities Impact assessment
66. An Equalities Assessment was undertaken on the proposals for a Zero Emissions Street prior to the Gateway 3-5 being submitted. We have reviewed the outcomes from this assessment against comments received via the online public consultation portal as an interim review which is set out in Appendix 7. We are undertaking mitigation measures as set out in this appendix, particularly around ensuring taxi access remains available to residents and visitors. Communication with the taxi trade is ongoing, and there will be a communication push once people return to the city after this national lockdown as this is likely to coincide with an increase in taxis in the City overall. We are also liaising with online mapping providers such as Google as to how they can more accurately represent the restriction on their navigation products.
67. The restriction and subsequent significant improvement in NO2 levels also provides a benefit for pedestrians and cyclists who are impacted by poor air quality.
68. If members choose to proceed with Option 2 we will seek consultancy support from Transport for All to advise and assist the developing design and support the public consultation and engagement exercises. Transport for All work as an advocacy group representing various disability groups and provide consultancy support as a not for profit organisation. Their input will help us to understand varying needs of different disabilities and whether mitigation can be included within the design and/or operation of the scheme as we work towards a permanent proposal. They will also help to qualify the impact if it is not possible to mitigate the issue so that this can be fully considered as part of the decision report.
Amendments to the experiment
69. The changes to the central reservation on Beech Street, which were approved in the October Issues Report have been designed and safety audited. These will create gaps in the central reservation to allow vehicles entering Beech Street from Aldersgate Street to turn right into both Lauderdale Place and the Defoe House/Shakespeare Tower car park. This does not require a change to any traffic orders. The removal of part of the central reservation may be carried out under S.64(3) Highways Act 1980.
70. If members decide to approve Option 2 then these changes could be made within 4 weeks from the date of approval.
71. Following the implementation, these measures should improve access for residents and deliveries to the Barbican Estate. It is considered to be in the interests of the expeditious, safe and convenient movement of traffic.
72. The continuation of the ETO will provide an opportunity to implement and monitor this change. The outcome will help inform consideration of any permanent order, the scope of potential future restrictions, and the evaluation of its likely impacts. It will not be possible to test, monitor and evaluate the changes if the ETO is revoked. It is considered that this would be a lost opportunity to build on the experiment to date, to allow stakeholders to evaluate the changes and to gather useful data for future decision-making.
73. This is considered a sound ground for the continuation of the experiment.
74. Work will need to be continued with Satnav companies to ensure this change is reflected in route planners, and the continuation of the experiment will also allow for monitoring of such information-sharing initiatives. This will also help inform future practise in implementing any further scheme.
75. Recent discussions with the Barbican Centre have raised concerns about there being a lack of parity for access to the Beech Street carpark (number 5) from Beech Street. There is an engineering design issue to resolve, but it does require revocation of the traffic order banning a right hand turn and a safety audit to determine if there any implications for cyclists who use this pocket to turn north to travel along Golden Lane.
76. If Members were minded to choose Option 2, approval is sought to undertake this feasibility and design work to enable the right hand turn into the Barbican Centre car park from the west. It is proposed that any further modification of the current traffic order banning this right turn be delegated to the Deputy Director of Transportation and Public Realm in consultation with the Chairman and Deputy Chairman so that there would be a reasonable opportunity for stakeholders to assess the impacts during the remaining experimental period.
77. The work to investigate the feasibility of allowing exemptions for local residents to drive through Beech Street is in progress. Whilst no firm conclusions have yet been drawn, initial analysis is that this is likely to be complex and resource intensive to establish. The nature of the streets, one-way systems and intricacies of access in the area is complex. Determining eligibility and establishing and administering the necessary database may well be unachievable within the experimental period. The criteria for deciding who would be eligible would need to be developed including with regard to traffic management considerations, taking into account the impacts and proportionality of more circuitous routes required due to the restrictions. The work will continue and be reported to Members.
Fortune Street
78. The impacts of the restriction affect adjacent areas in LB Islington and City and Islington Officers have met regularly on the detail. Pre-scheme traffic flows from Golden Lane into Beech Street would have reassigned to Fortune Street and Whitecross Street and come back down to the Silk Street junction. To protect the amenity of residents on Fortune Street and the Golden Lane school campus, LB Islington introduced an experimental restriction on Fortune Street (which is also a one-way street).
79. The management of the scheme has been somewhat problematic for Islington and has taken up more staff time than estimated. If Members opt for Option 1 or 3, Islington would need to take a decision on whether to continue with Fortune Street experiment. For Option 2 Islington will continue with their experiment and expect to be consulted if Members decide to promote a new permanent order in respect of the Beech Street restriction.
80. The combined restrictions on Beech Street and Fortune Street are understood to be a challenge for the Golden Lane Campus, which comprises the Richard Cloudesley Primary School, Prior Weston Primary School and Golden Lane Children's Centre. It has access points on Whitecross Street, Golden Lane and from Fortune Street Park. Officers have offered to meet with the Richard Cloudesley Primary school, but a meeting has not yet taken place.
Public Consultation feedback (to date)
81. Members of the public are able to share their views of the experiment via the online consultation portal.
82. 10,000 letters were sent out before the experiment began to inform residents and business of the consultation, and to notify them that the consultation period has been extended and will be kept open to allow feedback during more normal conditions.
83. There have been over 120 responses to the online public consultation. Of these, 62% have been from residents, with the remainder made up from businesses, visitors, workers, commuters and taxi drivers.
84. 62% support the principle of traffic restrictions to improve air quality and feel that there have been positive benefits from air quality improvements in Beech Street.
85. However, 63% of respondents also feel that the scheme has impacted negatively on them, which is consistent with the 63% of respondents who feel that motor vehicles journeys have been negatively impacted.
86. Overall, 54% of respondents support the scheme as it is or with further changes, and 45% do not support the scheme.
87. The relatively low number of overall responses may be explained by the fact that many workers and visitors have simply not been in the area for many months.
88. A summary report of the public consultation report can be found in Appendix 6.
89. If Option 2 is agreed further communications would be prepared to update stakeholders on the changes and encourage further consultation responses to aid in the evaluation of their impacts. Dependant on the COVID-19 restrictions in place we would also anticipate holding drop-in public consultation sessions during the scheme public consultatory for the permanent traffic order. If it is not possible these will be substituted with online sessions."
"Evaluation and Conclusion
104. There have been many issues to consider, balancing the needs of stakeholders with the project objectives in an area where the local infrastructure and street network is particularly complex. The timing and impact of the pandemic has been an additional complicating factor.
105. It is clear that despite reduced traffic in the City, the decision to continue with the experiment has enabled useful data to be gathered on air quality and traffic volumes in Beech Street. A further beneficial outcome is a higher level of understanding of the impact on access to properties and successful deliveries. Many lessons have been learned on how people interact with and understand the restriction. This could not have been modelled as a desktop exercise.
106. Despite the issues detailed in this report, the experiment to date is considered a qualified success. Air quality in Beech Street has significantly improved and now meets WHO limits.
107. There is a reasonable possibility, based on the national picture of the vaccine rollout effort, that restrictions will be eased over the coming months and activity and movement in the City may increase as workers return. This will allow for additional data to be gathered during more normal traffic conditions.
108. Even if traffic volumes do not return to more normal levels, useful traffic and air quality data can still be gathered during the remaining duration of the experiment, particularly on the impact of the modifications, which will assist in decision making on any new permanent order. If the experiment was concluded, an opportunity to consult on the modifications and collect relevant data will have been missed.
109. Traffic and air quality modelling tools can be used to provide estimates based on extrapolations from observations of depressed traffic patterns to guide decision making and public consultation.
110. The anticipated benefits and adverse impacts have been reconsidered since the evaluation carried out in the report provisionally recommending the ETO in December 2019. This has included consideration of consultation feedback and equalities impacts (see Appendix 7). Regard has been had to the City's traffic management duties relating to the convenient, safe and expeditious movement of traffic and to the City's equalities duties. The conclusion of the further evaluation is that (subject to the proposed mitigations of adverse impacts summarised in Appendix 7 and referenced in this report) the benefits of continuing the experiment in order to assess proposed changes to access arrangements, while working towards consultation on a permanent scheme, and the potential medium/long term air quality benefits of a permanent scheme justify Option 2.
111. On balance the continuation of the experiment under Option 2 is recommended."
i) Air monitoring has taken place throughout. Although staff were unable to retrieve monitoring tubes between March and May 2020, the data was unaffected, given Defra-approved methodologies to account for missing data. The 2019 air quality data for Beech Street provided a baseline, and from June 2020 onwards, data was collected for 21 additional locations.
ii) The graph in Appendix 4 to the OR showed that the level of nitrogen dioxide in Beech Street reduced by 53% whereas the reduction on Walbrook Wharf only reduced by 38%. Moreover, each site is different, with multiple variables contributing to nitrogen dioxide levels.
iii) In the Monitoring Summary in Appendix 5 to the OR, air quality data, penalty charge notice ("PCN") data, public consultation data and modelling data was obtained before 18 February 2021. Casualty data will be unavailable until 2022, owing to the nature of its compilation by the police. Car park counts could not commence until the central reservation gaps were constructed. Traffic counts were scheduled for March and April/May 2021. PCN data has been collected since enforcement commenced at the end of July 2020.
iv) There has been an effective public consultation with large numbers of responses from local residents. This has provided the Beech Street project team with a much better understanding of the impact of its restrictions on access to properties, and lessons learned on how to address the problems which have arisen.
Note 1 Associated Provincial Picture Houses Ltd. v Wednesbury Corporation [1948] 1 KB 223