IN
THE SUPREME COURT OF JUDICATURE
LTA
98/6666/3
IN
THE COURT OF APPEAL (CIVIL DIVISION)
QBENI
98/0573/1
ON
APPEAL FROM THE HIGH COURT OF JUSTICE
CHANI
98/0980/3
(MR
JUSTICE POPPLEWELL - QB CASE
)
(MR
JUSTICE NEUBERGER - CHANCERY CASE
)
Royal
Courts of Justice
Strand
London
WC2
Wednesday,
25 November 1998
B
e f o r e:
LORD
JUSTICE KENNEDY
LORD
JUSTICE MUMMERY
-
- - - - -
LLOYDS
BANK PLC
PLAINTIFF/RESPONDENT
-
v -
JEFFREY
LAMPERT
FIRST
DEFENDANT/APPELLANT
VANESSA
LAMPERT
SECOND
DEFENDANT/APPLICANT
-
- - - - -
(Transcript
of the handed down judgment of
Smith
Bernal Reporting Limited, 180 Fleet Street,
London
EC4A 2HD
Tel:
0171 421 4040
Official
Shorthand Writers to the Court)
-
- - - - -
MR
E COHEN
(Instructed by Messrs Freemans, London) appeared on behalf of the Appellant
First Defendant
MR
R BARRACLOUGH
(Instructed by Messrs Camillins, London) appeared on behalf of the Applicant
Second Defendant
MR
G PHILLPS
(Instructed by Messrs Hammonds Suddards, London) appeared on behalf of the
Respondent
-
- - - - -
J
U D G M E N T
(As
approved by the Court
)
-
- - - - -
©Crown
Copyright
Wednesday,
25 November 1998
J
U D G M E N T
LORD
JUSTICE KENNEDY:
1. Outline
The
appellant Mr Jeffrey Lampert was at all material times the Chairman of Heritage
plc which, from 1981 onwards, was a customer of the Respondent bank. Heritage
required overdraft facilities, and in that connection the bank from time to
time involved Mr Lampert, and sometimes his wife as well, with the result that -
(1)
in 1983, to secure the Heritage overdraft, Mr and Mrs Lampert gave to the bank
a second charge over their home at 22 Neville Drive, London, N.2. There was a
first charge in favour of a building society.
(2)
On or about 21st September 1990, in consideration of the Bank making or
continuing to make advances to Heritage plc, Mr Lampert guaranteed payment on
demand of all money etc. owed by Heritage to the Bank. The guarantee was
limited to £500,000 and originally its terms were qualified in a side
letter of 2nd October 1990 which, the Bank contends, was set aside by agreement
during 1991.
(3)
In January 1994 the Bank offered to release the charge upon the Lamperts’
home referred to at (1) above, but in fact at that stage nothing further was
done to that end.
(4)
In August 1995, when the Bank was not prepared to lend the company more than
£725,000 by way of overdraft, Mr Lampert obtained from the Bank - for the
benefit of the company - a bridging loan of £250,000. That loan was
secured by a further charge on 22 Neville Drive, which again involved Mrs
Lampert. £100,000 of the bridging loan was repaid in late 1995, but on
14th March 1996 the Bank granted a further bridging loan of £100,000, so
that Mr Lampert’s liability was once again raised to £250,000.
On
10th July 1996 the Bank required the company to pay the sum of £594,832.03
which the company then owed by way of overdraft repayable on demand, and on
11th July 1996, when payment was not forthcoming, the Bank appointed as joint
administrative receivers Scott Barnes and Simon Morris of Grant Thornton. Two
days later the company dispensed with the services of Mr Lampert, and on 23rd
July 1996 he was asked -
(a)
To honour his 1990 guarantee by paying £500,000.
(b)
To repay his bridging loan which, inclusive of interest, then stood at
£252,661.48.
Those
payments were not forthcoming, so on 10th December 1996 the Bank started
proceedings in the Queen’s Bench Division to enforce the guarantee. On
19th November 1997 Master Trench gave judgment for the Bank pursuant to Order
14 of the Rules of the Supreme Court. Mr Lampert appealed, but on 16th
December 1997 that appeal was dismissed by Popplewell J, and from the order of
Popplewell J he now appeals to this Court.
On
23rd January 1997, just over one month after the commencement of proceedings in
the Queen’s Bench Division, the Bank commenced proceedings against Mr and
Mrs Lampert in the Chancery Division. The originating summons sought -
(1)
Payment by Mr Lampert of the sum then owing by way of bridging loan, namely
£265,108.60 plus interest.
(2)
As against Mr and Mrs Lampert possession of 22 Neville Drive pursuant to the
August 1995 legal charge.
On
18th December 1997 Master Bowman made the orders sought and on 17th June 1998
Neuberger J dismissed Mr and Mrs Lampert’s appeal. Mr Lampert’s
appeal from the decision of Neuberger J is the second matter which is before
this Court. Mrs Lampert did not seek to appeal from the judge. Her
application for leave to appeal was refused by the single Lord Justice, and was
renewed before us at the commencement of the hearing on 2nd November 1998. We
declined to give leave, and said that we would give our reasons for that
decision later. Those reasons are to be found at the end of this judgment.
2. Queen’s
Bench Action
Mr
Cohen, on behalf of Mr Lampert, submits, rightly, that in these two actions all
that he has to show in order to succeed is an arguable defence - “An
issue or question in dispute which ought to be tried”, or some other
reason why there should be a trial (see Order 14 Rule 3). In relation to the
Queen’s Bench action Mr Cohen makes four principal submissions, and I
propose to look at each in turn.
(1)
The
demand was premature
The
first submission recognises that the 1990 contract of guarantee made between
the Bank and Mr Lampert expressly entitles the Bank to “payment on
demand” and contains in clause 16 these words -
“It
shall not be necessary for the Bank before claiming payment hereunder to resort
to or seek to enforce any other guarantee or security whether of the Customer
or of any other person.”
Nevertheless
Mr Cohen contends that the words of the contract were qualified by the
Bank’s side letter of 2nd October 1990, the final paragraph of which
reads -
“I
confirm that in the event of Heritage plc defaulting in its obligations to the
Bank, the Bank will, if and to the extent that it considers it practicable to
do so, pursue its remedies against Heritage plc for a period of three months
before seeking to recover any moneys from you under the guarantee but this will
not apply if, in our opinion, your financial position is deteriorating at that
time.”
However,
as is clear from the documents, the side letter was re-considered at a later
stage. On 21st March 1991 the bank, represented by Mr Brooks, and Mr Lampert
discussed the Bank’s requirements if it was to continue to support
Heritage plc and, according to a letter written by Mr Brooks on the following
day, it was agreed that the restrictions placed upon the guarantee by means of
the side letter of 2nd October 1990 would no longer apply. The letter of 22nd
March 1991 continues :-
“Please
sign and return the enclosed copy letter as your confirmation that the Side
Letter dated 2nd October 1990 is cancelled. In view of the security which is
to support your Guarantee your wife’s confirmation will also be
necessary.”
Mr
Cohen submitted that the reference in the letter to Mrs Lampert should raise
doubt as to whether there was an agreement made in her absence on 21st March
1991, but that does not seem to me to follow. The fact is that if the side
letter was cancelled the position of Mrs Lampert was more exposed in that the
bank would be able to resort at an earlier stage to the 1983 charge on the
matrimonial home. Mr Cohen also pointed out that in his second affidavit Mr
Ball, on behalf of the bank, when he referred to and exhibited the letter of
22nd March 1991, did not go on to say that the letter itself referred to an
agreement made on the preceding day. That seems to me to be a hopeless point.
The letter speaks for itself, and Mr Ball’s concern was to produce a
highly significant document which Mr Freeman, in his affidavit on behalf of Mr
Lampert, had apparently overlooked. Mr Lampert himself swore an affidavit
dated 19th September 1997 to which Mr Cohen invited our attention, but that
affidavit simply does not address the question of what happened on 21st March
1991.
It
seems clear to me that on receipt of the letter dated 22nd March 1991 Mr and
Mrs Lampert had the good sense to seek legal advice, with the result that on
16th April 1991 McKenna & Co, the solicitors who had been consulted, wrote
to the bank. Part of their letter reads :-
“Having
briefly read the terms of the second mortgage dated 21st July 1983 I note that
this is a ‘all monies’ security and was executed by both Mr and Mrs
Lampert. I suggest that this is sufficient for the Bank in respect of Mr
Lampert’s liabilities under his guarantee and that nothing further needs
to be signed. I explained this to Mr and Mrs Lampert.
I
note that the Bank also want Mr and Mrs Lampert to confirm that the
restrictions upon the guarantee contained in a side letter dated 2nd October
1990 would no longer apply. I understand that the guarantee was always
intended to be a ‘last resort’ guarantee of a limited amount and I
cannot advise Mr Lampert to extend it so that the Bank can make a demand at any
time irrespective of whether or not the Company has exceeded any agreed
overdraft limit and whether or not the Bank has first demanded repayment from
the Company.”
So,
on the face of it, the solicitors were advising Mr Lampert not to provide the
evidence which the bank was seeking of the agreement which they said had been
made on 21st March 1991, but the solicitors were not saying that no such
agreement had been made. And the difficulty, from Mr Lampert’s point of
view, must have been that the bank had the whip-hand. If it was to continue to
give financial support to Heritage it could lay down its terms. No doubt
McKenna’s letter of 16th April 1991 did, as Mr Lampert asserts, have the
result that in May 1991 there were further discussions between the bank, the
financial director of Heritage and Mr Lampert about the cancellation of the
side letter. As Mr Phillips, for the bank, points out in his skeleton
argument, both sides seem to have a similar recollection of those discussions.
Mr Lampert says :-
“it
was agreed that the side letter of 2 October 1991 would be cancelled, but on
the understanding that the guarantee was to be one of ‘last
resort’.”
Mr
Brooks’ recollection is as set out in his letter of 1st August 1991 which
is quoted below.
Having
got what they could by way of further concession from the bank Mr and Mrs
Lampert signed a copy of the bank’s letter of 22nd March 1991 and that
copy was returned to the bank by McKenna & Co under cover of their letter
of 14th June 1991. Part of that letter reads :-
“As
regards the second letter which refers to the restrictions on the guarantee
contained in a side letter dated 2nd October 1990 no longer applying, I have
also advised Mr and Mrs Lampert in relation to it and they have been prepared
to countersign this letter to ensure that the Bank continues to give on-going
support to the group. Notwithstanding the ‘cancellation’ of this
side letter (which does not specifically address the point) I want to confirm
that Mr Lampert has always regarded and still regards his guarantee as one of
‘last resort’ and that the Bank would proceed against the Company
for overdue indebtedness before calling the guarantee; I believe that this is
also your understanding of the nature of the guarantee as mentioned at a
recent meeting with Mr Lampert and the group financial director, Mr George
Raynor”.
It
is noteworthy that the letter does not call into question the agreement of 21st
March 1991 to which the enclosed letter expressly refers. On the contrary it
refers to the restrictions in the side letter “no longer applying”
and to Mr Lampert’s “understanding” which the writer believes
is also the understanding of the bank. Mr Cohen seeks to rely upon the letter
of 14th June 1991 as evidence that as a result of the discussions which took
place in May the bank had contractually modified its position. In my judgment
there is, in reality, no evidence to that effect. All that can be discerned is
the bank offering some re-assurance, falling well short of a contractual
obligation, that it would look first to Heritage to pay its debts. If there
had been any contractual obligation to that effect I do not doubt that the
writer of the letter of 14th June 1991 would have said so in clear terms.
According to the bank the final position was as set out in Mr Brooks’
letter to Mr and Mrs Lampert of 1st August 1991, the material part of which
reads :-
“With
regard to the circumstances where re-payment would be sought under the
guarantee, the Bank would look initially to company assets for recovery of
indebtedness. If after reasonable efforts full recovery has not been made, the
Bank would seek to recover the outstanding indebtedness under the Guarantee of
Jeffrey Lampert.
It
should be noted however that demand may be made on Jeffrey Lampert under the
Guarantee immediately after demand upon the Company to enable interest to run
from the date of demand even though recovery under the Guarantee would be in
accordance with the preceding paragraph of this letter.”
Mr
and Mrs Lampert say that they never received that letter, but there seems to be
no reason to doubt its authenticity, and if authentic it does represent a
contemporaneous account of the bank’s position following the negotiations
of May 1991, a position which, as Mr Phillips has pointed out, is substantially
in line with Mr Lampert’s own recollection of what occurred.
In
the light of the evidence which I have carefully reviewed it seems to me that
it is quite impossible to contend, as Mr Cohen does, that there was anything
left of the side letter after 21st March 1991, or at any rate after 14th June
1991 when the signed copy of the letter of 22nd March 1991 was returned by
McKenna & Co to the bank. I also reject Mr Cohen’s alternative
submission that the negotiations which took place during the summer of 1991
resulted in some form of alternative contractual inhibition arising in relation
to the bank’s entitlement to enforce its rights under the 1990 guarantee.
It therefore follows that Mr Cohen’s submission that the demand made by
the bank on 23rd July 1996 was premature must fail. As the judge said, the
contractual situation at that date was governed by clause 16 of the guarantee.
(2)
Overdraft
of Heritage not payable on demand?
Mr
Cohen’s next principal submission is that on 10th July 1996 the bank was
not entitled to demand immediate payment from Heritage, so there was no default
on the part of Heritage to trigger the demand on the guarantee.
Mr
Cohen accepts that the relevant facility letter of 3rd April 1996 stated in
terms that “any amounts owing under the facility are repayable on
demand” but he submits that the letter has to be considered in the light
of all the circumstances known to the parties. The circumstances which he
identifies are as follows :
(a)
the facility letter set out limits as to the amount of the overdraft for the
period up to and beyond November 1996.
(b)
In order to establish the facility the bank charged an arrangement fee of
£7500:
(c)
as part of the arrangement it was agreed that the board of the company and the
bank’s advisers Grant Thornton would carry out a review, that review to
be completed by 31st July 1996:
(d)
as recorded in the facility letter, the company undertook to sell its premises
at Unit 3, Marshgate Lane, Stratford. In that connection it was envisaged that
completion might not take place until January 1997.
(e)
The facility letter specified the extent to which at any one time the
company’s available debtors must exceed in total its borrowing by way of
bank overdraft.
Mr
Cohen also points out that, as the bank knew, Heritage was a public company and
if overdraft facilities were suddenly terminated that would have an adverse
effect on shareholders and listed shares. The overdraft facility was, Mr Cohen
contends, intended by both sides to be a long term arrangement under which the
bank, as the sole banker of Heritage, was to assist that company through a
slack period to reach the busier pre-Christmas trade. The facility letter said
that “it is the Bank’s present intention to make the facility
available until 28 February 1997 or such later date as may from to time be
advised in writing by the Bank. All monies from time to time owing to the Bank
under this facility shall be repaid no later than the agreed expiry
date.” That was, Mr Cohen contends, more than a mere expression of the
bank’s state of mind at the time of granting the facility. It was in
reality a clear indication of the duration of the facility, an indication upon
which Heritage was entitled to rely, and although it is true that on 10th July
1996 Heritage’s overdraft exceeded by £94,000 the level indicated by
the facility letter Popplewell J was right to say, as he did, that because some
flexibility had been allowed by the bank in relation to overdraft limits the
company’s failure to abide by the overdraft limit set out in the facility
letter was not the bank’s best point.
Mr
Cohen pointed out that in
Titford
Property Co Ltd v Cannon Street Acceptances Ltd
25th May 1975 unreported, a case which concerned fixed term overdrafts, the
words “payable on demand” were held by Goff J to be
“completely repugnant to the whole facility” and that, Mr Cohen
submits, is at least arguably the position in the present case. He recognises
that in
Williams
& Glyn’s Bank v Barnes
(1981) Com. L R 205 that line of argument did not prevail, even though the
lender knew the purpose for which the money was to be used. As an alternative
Mr Cohen submits that “on demand” should be construed as meaning no
more than that the bank was entitled to demand payment if otherwise entitled to
it.
I
am wholly unpersuaded that the words “repayable on demand” used in
the facility letter do not mean what they say. It is in no way inconsistent
for a bank, or any other lender to grant a facility which it and the borrower
both envisage will last for some time, but with the caveat that the lender
retains the right to call for repayment at any time on demand. That is what
happened here. As the judge said, the terms of the facility letter and the
other circumstances to which Mr Cohen has referred disclose no incompatibility.
The bank was therefore entitled to do as it did on 10th July, 1996 and to
require Heritage to repay on demand.
(3)
Time allowed for Payment.
Mr
Cohen’s third principal submission is that having made its demand of the
company at 3.30 pm on 10th July 1997 the bank was not entitled to appoint
receivers at 10.30 am on the following day because that did not allow the
company sufficient time to arrange for payment. The company should have been
given “a reasonable time” in which to raise money elsewhere. Mr
Cohen acknowledges that if
Bank
of Baroda v Panessar
(1987) Ch 335 was rightly decided this point is unarguable. In that case
Walton J reviewed the English and Commonwealth authorities, and concluded that
in English law the debtor is only entitled to the time necessary for the
mechanics of payment, not for time to raise the money if it is not there to be
paid. In the present case, Mr Cohen concedes, the company was given the time
necessary for the mechanics of payment, but he submits that the approach
adopted by Walton J should now be considered at appellate level to see whether
or not it would give way to the more liberal approach adopted in Canada and
Australia. However the liberality of the Commonwealth approach must not be
overstated. In
Whonnock
Industries v National Bank
(1987) 42 DLR (4th) 1 the British Columbia Court of Appeal reviewed the
authorities , and concluded that where the amount owing is very large Canadian
law now requires that lenders should give “at least a few days” in
which to meet the demand. Reasonable notice, it was said, may range from a few
days to no time at all. In that case 7 days had been allowed by the lender,
and the judge at first instance held that to be insufficient. On appeal his
decision was reversed, the court saying at page 11 :-
“The
Canadian law demonstrated in the decisions does not contemplate more than a few
days and cannot encompass anything approaching thirty days. In the decisions
noted nothing approaching the 7 days permitted here has been classed as
unreasonable. The cases in which the requirement for reasonable notice evolved
deal with notices of an hour or less. None of them holds that a notice of more
than one day was inadequate and none refers to the need for a notice of more
than a few days.”
For
the bank Mr Phillips submits, and I accept, that even if this Court were
ultimately to reject the mechanics of payment test in favour of the Canadian
and Australian approach - despite the powerful arguments set out by Walton J in
favour of his conclusion - that would be of no assistance to Mr Cohen on the
facts of this case. There is no evidence to suggest that given a few more days
Heritage could have found nearly £600,000. The evidence is to the
opposite effect. Mr Lampert’s affidavit of 28th March 1997 suggests that
at the material time there were “potential purchasers” of the
Heritage Group, but only one has been identified. Mr Cohen invites our
attention to a fax of 11th July 1996 indicating that on 10th July 1996 the
board of SLR Plast Group in Tel Aviv considered the possibility of acquiring or
merging with Heritage plc. The sender promised a letter “which will
outline our pre-conditions in order to start negotiations.” Clearly,
despite Mr Lampert’s indication to the contrary, that approach was in its
infancy, and, as Mr Phillips points out, when the receivers were appointed the
approach was not pursued. Furthermore, even if a buyer for the company had
been found that does not of itself indicate that there would have been any
payment of the company’s debt to the bank. Nowhere is it suggested that
there was any other lender available to take over that debt.
In
my judgment therefore the interesting academic question as to whether the
mechanics of payment test should now be affirmed or rejected at appellate level
can have no bearing on the present case because, whatever the test, on the
evidence the bank was entitled to appoint receivers when it did.
(4) Other
Grounds for Granting Leave to Defend
As
Mr Cohen points out, Order 14 Rule 3 permits the Court to grant leave to defend
even where it cannot identify a triable issue. Mr Cohen submits that the power
should be exercised in this case because it is arguable that the bank behaved
harshly and unconscionably and acted with unjustifiable haste towards an
established customer. He also points to the fact that the receivers appointed
were from Grant Thornton. Mr Lampert objected to their appointment because the
firm had previously been advising the bank in relation to the affairs of
Heritage. The identity of the receivers seems to me to be irrelevant to the
question of whether or not there should be judgment against Mr Lampert under
Order 14, and I can find nothing in Mr Lampert’s complaints against the
bank which should entitle him to leave to defend. Accordingly in my judgment
Popplewell J was right to find as he did, and so far as the Queen’s Bench
action is concerned I would dismiss the appeal.
3. Chancery
Action
In
relation to the decision of Neuberger J Mr Cohen raises one preliminary matter
and two substantive points.
(A)
Preliminary
The
preliminary matter concerns the negotiations in August 1995 leading to the
bank’s second charge on 22 Neville Drive. It will be recalled that in
addition to the building society’s first charge the bank had in 1983 been
granted a charge which in January 1994 it had offered to release. Mrs Lampert
has contended that in August 1995 she was unaware of the existence of the
bank’s earlier charge, and that if aware of it she would not have agreed
to a further charge. Mr Lampert contended that he was led to believe that the
earlier charge had been discharged. Initially Mr Croudace, for the bank,
thought it most unlikely that he would have given that impression in relation
to the earlier charge, but having had a chance to consider his letter to Mr
Lampert of 12th January 1994, in which he offered to release the earlier
charge, Mr Croudace accepted that he may in August 1995 have said that the bank
had released, or would not rely upon the earlier charge. Mr Cohen accepts that
there is therefore no longer a live issue as to the bank’s stance in
August 1995 in relation to the earlier charge, but he points to Mr
Croudace’s original reaction as an indication of unreliability on the
part of the bank’s witnesses, and as an indication of the need for the
whole matter to be fully investigated at a trial following full discovery. In
my judgment the fact that Mr Croudace corrected his evidence as soon as he had
the opportunity to consult the relevant documentation is commendable, and adds
nothing to Mr Cohen’s case.
(B)
Undermining
the Bridging Loan
Mr
Cohen’s first substantive point in relation to the Chancery action is
that the bridging loan of £250,000 which Mr Lampert obtained in August
1995 was intended to be a short term loan, to be repaid by Heritage as its
position improved. It was envisaged that when the overdraft came down to
£725,000 and the loan was repaid the bank’s charge on 22 Neville
Drive, which was entered into to secure the bridging loan, would be released.
Mr Cohen contends that by reducing the overdraft facility to Heritage
prematurely, during the existence of the bridging loan, the bank rendered it
impossible for Heritage to repay that loan and so the bank was in breach of its
contractual duty to Mr Lampert.
Undoubtedly
the bridging loan was intended to provide short term relief for Heritage, so
that in addition to an overdraft facility of £725,000 that company would
have £250,000 available by way of loan from Mr Lampert. Mr
Lampert’s letter of 10th August 1995 indicates that he expected the need
for finance in addition to the overdraft facility to be over by the end of
October. Against that background the bank, on 10th August 1995, offered a
bridging loan of £250,000. Part of the facility letter reads :-
“The
amount borrowed will be repayable in full on demand, but it is the Bank’s
present intention to make the facility available to you until 30th September
1995 on which date the amount then owing to the Bank shall be repaid.”
In
a letter to Mr Lampert of the same date Mr Croudace speaks of the bridging loan
being repaid by Heritage by late September 1995 or early October, when it was
anticipated that the Group borrowing would be reduced to within £725,000.
The letter makes it clear that at that time the bank would be prepared to
release the charge.
On
the same day, 10th August 1995, the bank offered overdraft facilities to
Heritage not exceeding £725,000. Part of that facility letter reads -
“Any
amounts from time to time owing under the facility are repayable on demand but
it is the Bank’s present intention to make the facility available until
30th September 1995 or such later date as may from time to time be advised in
writing by the Bank. All monies from time to time owing to the Bank under this
facility shall be repaid no later than the agreed expiry date.”
So,
on the face of it, the two facilities were expected to be of similar duration,
terminating at the end of September 1995, although, as Mr Cohen puts it, there
were indications that the termination date was not “writ in stone”.
In fact the bank did not insist on repayment of the bridging loan at the end of
September, nor did it seek to reduce the company’s overdraft until 31st
October 1995 when a new facility letter offered a limit of £650,000 for
one month, with reduced limits thereafter.
In
those circumstances I find Mr Cohen’s submission very difficult to
understand. He says that “viewing the arrangement as a whole the bank
was not entitled unilaterally to reduce the overdraft limit at the end of
September”. To that I offer two answers. First, the bank did not make
any reduction at the end of September, and, secondly, there was not any
contractual or other reason why it should not have done so. The reality is
that the bank did nothing during the expected life of the bridging loan to
undermine Mr Lampert’s or Heritage’s ability to repay. It follows
that Mr Cohen’s first substantial point in relation to the Chancery
action must be rejected.
(C)
Entitlement
to Call in the Bridging Loan
It
will be recalled that £100,000 of the bridging loan granted in August 1995
was repaid in late 1995 and in March 1996 the bank allowed Mr Lampert to
increase his bridging loan by £100,000. The bridging loan was therefore
once again £250,000, none of which had been repaid by 23rd July 1996. The
relevant part of the facility letter of 12th March 1996 reads :-
“The
amount borrowed will be repayable in full on demand, but it is the Bank’s
present intention to make the facility available to you until 31st December
1996 on which date the amount then owing to the Bank shall be repaid.
Security.
As
security for the advance the Bank will continue to rely on its existing Second
Legal Charge over 22 Neville Drive ......”
Mr
Cohen submits that the express right to repayment on demand must be construed
in the light of the side letter from the bank of 14th March 1996 which says -
“we
expect your bridging loan facility to be repaid in tranches, from August 1996
onwards, in accordance with the cashflow projections presented to the Bank by
the directors of Heritage plc with full repayment to be effected by the end of
the year.”
That
indication as to when repayment was expected to commence was, it is submitted,
inconsistent with the express right to call for repayment on demand. It was,
it is submitted, an implied term of the loan agreement that the bank would not
peremptorily withdraw the overdraft facility granted to Heritage plc.
In
my judgment this submission, which is closely allied to one of the submissions
made in relation to the Queen’s Bench action, is untenable. There was
nothing inconsistent about expecting repayments to begin in August, and yet
preserving a right to call for a full repayment at any time. There is also no
reason to imply any term of the type for which Mr Cohen contends. As Mr
Phillips points out, the bridging loan facility was in fact granted before the
relevant overdraft facility was agreed. It follows that Mr Lampert’s
appeal against the decision of Neuberger J fails, and the Chancery appeal, like
the Queen’s Bench appeal, should in my judgment, be dismissed.
4. Mrs
Lampert
When
judgment was given by Neuberger J counsel then appearing for Mrs Lampert said
“I am not requesting leave to appeal”. No application for leave to
appeal was ever made to the judge despite the requirements of Order 59 Rule
14(4). Mr Barraclough sought to explain that omission to us by saying that
after judgment Mrs Lampert was not legally aided. That cannot be a
satisfactory explanation for the omission. Nevertheless we, like the single
Lord Justice, have looked at the merits of Mrs Lampert’s notice of
appeal. As the single Lord Justice said when refusing leave “the
essential point is whether there was (on the conceded facts) a material
representation” in relation to the existence in 1995 of the 1983 charge.
In reality, as the judge found, there was no material misrepresentation and so,
in my judgment, despite the submissions made to us, Mrs Lampert cannot identify
any ground of appeal worthy of the attention of this court.
LORD
JUSTICE MUMMERY: I agree.
ORDER: Appeals
and application dismissed with costs; 56 days to give possession.