Alfred C Toepfer International GmbH v Societe Cargill France [1997] EWCA Civ 2811 (25th November, 1997)
URL: http://www.bailii.org/ew/cases/EWCA/Civ/1997/2811.html
Cite as:
[1997] EWCA Civ 2811,
[1998] CLC 198,
[1998] 1 Lloyd's Rep 379
[
New search]
[
Printable RTF version]
[
Help]
ALFRED C. TOEPFER INTERNATIONAL GMBH v. SOCIETE CARGILL FRANCE [1997] EWCA Civ 2811 (25th November, 1997)
IN
THE SUPREME COURT OF JUDICATURE
QBCMF
97/0178/B
IN
THE COURT OF APPEAL (CIVIL DIVISION)
ON
APPEAL FROM THE QUEEN'S BENCH DIVISION
COMMERCIAL
COURT
MR
JUSTICE COLMAN
Royal
Courts of Justice
The
Strand
London
WC2
Tuesday
25th November, 1997
B
e f o r e:
LORD
JUSTICE STAUGHTON
LORD
JUSTICE PHILLIPS
LORD
JUSTICE ROBERT WALKER
-
- - - - -
ALFRED
C. TOEPFER INTERNATIONAL GMBH
Respondent
-
v -
SOCIETE
CARGILL FRANCE
Appellant
-
- - - - -
(Handed
down Transcript of Smith Bernal Reporting Limited
180
Fleet Street, London EC4A 2HD
Tel:
0171 421 4040
Official
Shorthand Writers to the Court)
-
- - - - -
MR
S MORRIS
(Instructed by Messrs Middleton Potts, London EC1A 7LD) appeared on behalf of
the Respondent
MR
S PHILLIPS
(Instructed by Brian Perrott Esq. Cargill PLC, Surrey KT11 2PD) appeared on
behalf of the Appellant
-
- - - - -
J
U D G M E N T
(As
approved by the Court
)
-
- - - - -
©Crown
Copyright
Tuesday
25th November, 1997
JUDGMENT
LORD
JUSTICE STAUGHTON: For the reasons that have been handed down this appeal will
be referred to the European Court.
LORD
JUSTICE PHILLIPS: This is the Judgment of the Court.
In
January 1994 Cargill entered into three contracts for the purchase from Toepfer
of a total of 9500 tonnes of soybean meal pellets, CIF Montoir, in France.
Pursuant to these contracts pellets were carried to Montoir aboard the
GULF
WAVE
,
which arrived at Montoir on the 7th February. A dispute then arose between
Cargill and Toepfer as to whether the pellets complied with the contract. It
is common ground that each contract included a clause that required the
dispute to be resolved by a GAFTA arbitration, to the exclusion of any other
tribunal. This clause should have ensured that the dispute was resolved
cheaply and expeditiously by an expert tribunal. The parties have, however,
become embroiled in a procedural dispute which raises complex issues as to the
interpretation of the Brussels Convention 1968 and which must already have
involved legal costs far in excess of the amount at stake in the substantive
dispute. Nor will this appeal resolve these issues. They are of general
importance and the solution to them is far from clear. Accordingly we have
resolved that it is appropriate to refer them for the ruling of the European
Court of Justice, pursuant to Schedule 2 to the Civil Jurisdiction and
Judgments Act 1982. The object of this judgment is to put in context the
questions referred.
History
of the proceedings
On
the 8th February, Cargill became concerned about the condition of the cargo and
gave notice of those concerns to Toepfer. Toepfer responded the following day,
contending that the contracts, which were on the terms of GAFTA Form 100 and
contained the so-called "standing in" clause, provided for the sampling and
analysis procedure, which should be followed. Instead of following this
procedure, Cargill made an application to the Tribunal de Commerce de St.
Nazaire ("the French Court") under an urgent interlocutory procedure known as
"en reféré" for the appointment of a court expert to ascertain
the relevant facts. The French Court made the order sought the following day.
Mr Harang, the appointed expert asked Toepfer to produce certificates of
analysis at the loadport. Toepfer declined to do so on the ground that under
the contractual provisions these were irrelevant. Cargill's response, on the
11th February, was to make a further application "en reféré" for
the production of these certificates. On this day discharge was completed.
Cargill rejected the major part of the cargo and called for arbitration,
stating that the appointment of their arbitrator would follow.
On
the 17th February Cargill nominated Mr Scott as their Arbitrator.
On
the 22nd February the French Court heard and dismissed objections made by
Toepfer to the two orders made "en reféré". At this stage
Cargill had given no indication that they did not intend that the substantive
dispute should be resolved by arbitration. Their case was that the "en
reféré" orders were justified in order to obtain evidence for the
purpose of the arbitration.
On
the 1st March Toepfer appointed Mr Sears as their arbitrator in the arbitration.
On
the 14th September Toepfer appealed to the Cour d'Appel de Rennes against the
two orders made "en reféré". Their appeal was dismissed on the
19th October.
On
the 7th February 1995 Cargill issued proceedings in the French Court making a
substantive claim for damages against Toepfer. At the same time, however, they
gave notice renewing the arbitration - under the GAFTA rules this has to be
done every 12 months, failing which the arbitration lapses unless the
arbitrators, in their discretion, otherwise order.
On
the 20th February Toepfer referred to GAFTA arbitration a claim for damages on
the ground that Cargill had acted in breach of contract in commencing court
proceedings in disregard of the arbitration clause. They nominated Mr Scott as
their arbitrator. On the 11th April Cargill nominated Mr Sears as their
arbitrator in respect of this claim.
On
the 5th April 1996 Cargill purported to renew the arbitration once again.
Toepfer took the point that they were out of time and contended that their
claim for arbitration was deemed withdrawn.
On
the 17th June 1996 the expert appointed by the French court delivered his
report to the Court.
On
the 19th June Toepfer submitted, pursuant to Section 1458 of the New Code of
Civil Procedure, an objection to the jurisdiction of the French Court in
respect of the substantive proceedings, invoking the exclusive GAFTA
jurisdiction clause and seeking an order that the French Court declare itself
incompetent and refer the proceedings to arbitration. At the same time Toepfer
gave Cargill notice that if they did not desist from the French proceedings,
Toepfer would apply to the High Court in London for an injunction restraining
the French proceedings.
In
the absence of response from Cargill, Toepfer initiated the present proceedings
by originating summons on the 16th September 1996. On the 16th October the
French Court ordered that Toepfer's objection to the jurisdiction of the French
Court should be heard on the 11th December, but that hearing was subsequently
adjourned, pending the result of these proceedings.
The
Relief Sought
The
relief sought in the present proceedings was as follows:
1. A
declaration that the claims made by the Defendant against the Plaintiff in
proceedings commenced by writ dated 7th February 1995 in the Tribunal de
Commerce de Saint-Nazaire in France (The French Proceedings") are disputes
within the scope of disputes agreed by the Plaintiff and the Defendant to be
referred to arbitration, in accordance with Arbitration Rules No.125 of the
Grain and Feed Trade Association ("GAFTA 125") under clause 32(a) of Form 100
of GAFTA ("GAFTA 100") incorporated into and forming part of three contracts
each made between the plaintiff as seller and the defendant as buyer and dated
17th, 18th and 20th January 1994 for the sale of 7,000, 1,000 and 1,500 metric
tonnes respectively of soyabean meal pellets.
2. A
declaration that the Defendant is entitled and obliged to refer the disputes
referred to in 1. above to arbitration under the rules of GAFTA 125 in
accordance with clause 32(a) of GAFTA 100.
3. A
declaration that the commencement by the defendant on or around 7th February
1995 of the French Proceedings constituted, and the continuation of the said
proceedings by the First Defendant will constitute:
(a) a
breach of the agreements made between the plaintiff and the defendant under
clause 32(a) of GAFTA 100 as incorporated into the Contracts, to refer to
arbitration all disputes arising out of or under the Contracts.
(b) a
breach of the agreements made between the plaintiff and the defendants under
clause 32 of GAFTA 100 as incorporated into the Contracts, providing for
exclusive jurisdiction of the Courts of England or arbitrators in England over
all disputes arising under the Contracts.
4. An
injunction restraining the Defendant whether by itself its servants or agents
or howsoever otherwise from:
(a) continuing
or prosecuting or taking any further steps in or assisting in the continuation,
prosecution or taking of further steps in or otherwise further participating in
the French Proceedings;
(b) commencing
any further or other proceedings in any court wheresoever situated, otherwise
than by arbitration in London under GAFTA 125, against the plaintiff in respect
of all or any claims made in the French Proceedings and any other dispute
arising out of or under the Contracts.
5. An
injunction requiring the defendants by itself its servants or agents or
howsoever otherwise to discontinue, or take all steps necessary to effect a
discontinuation of the French Proceedings.
On
the 20th December 1996 Colman J. granted the relief sought. Cargill then
appealed to this court against his order.
The
jurisdiction provisions in the contracts
The
contracts were subject to the following provisions of GAFTA Form 100:
31. DOMICILE
- Buyers and Sellers agree that for the purpose of proceedings either legal or
by arbitration this contract shall be deemed to have been made in England and
to be performed there any correspondence in reference to the offer, the
acceptance, the place of payment or otherwise notwithstanding and the Court of
England or arbitrators appointed in England, as the case may be, shall, except
for the purpose of enforcing any award made in pursuance of the arbitration
clause hereof, have exclusive jurisdiction over all disputes which may arise
under this contract. Such disputes shall be settled according to the law of
England, whatever the domicile, residence or place of business of the parties
to this contract may be or become.
32 Arbitration
-
(a) Any
dispute arising out of or under the contract shall be settled by arbitration in
accordance with the Arbitration Rules No. 125 of The Grain and Feed Trade
Association in the edition current at the date of this contract, such Rules
forming part of this contract and of which both parties hereto shall be deemed
to be cognisant.
(b) Neither
party hereto, nor any persons claiming under either of them shall bring any
action or other legal proceedings against the other of them in respect of any
such dispute until such dispute shall first have been heard and determined by
the arbitrator(s) or a Board of Appeal as the case may be, in accordance with
the Arbitration Rules and it is expressly agreed and declared that the
obtaining of an award from the arbitrator(s) or a Board of Appeal, as the case
may be, shall be a condition precedent to the right of either party hereto or
of any persons claiming under either of them to bring any action or other legal
proceedings against the other of them in respect of any such dispute.
The
issues raised
By
no means all the issues raised in these proceedings involve the interpretation
of the Brussels Convention. We think that it will be helpful, however, if we
identify all the issues and resolve those which do not turn on the
interpretation of the Convention, albeit that on one view of the Convention the
English Court should not even embark on considering some of the issues raised.
One
issue we feel we should address at the outset. This is the basis upon which
Colman J's order was made. There are two possibilities:
(1)
The English court has a discretionary power to restrain by injunction a breach
of contract.
(2)
The English court has recently asserted, in relation to those subject to
English jurisdiction, the power to restrain by injunction the pursuit of
proceedings in a foreign jurisdiction where such conduct is unconscionable - see
British
Airways Board v. Laker Airways Limited
[1985] AC 58;
Midland
Bank PLC v. Laker Airways Limited
[1986] QB 689;
Airbus
Industrie GIE v. Patel
[1997] 2 Lloyds Rep. 8.
We
are in no doubt that the power which Colman J. purported to exercise was the
former. Cargill has done nothing intrinsically unconscionable in commencing
proceedings in France. The only ground on which objection can be taken to such
conduct is that it is in conflict with Cargill's contractual agreement to
arbitrate - see
Schiffahrtsgesellschaft
Detlief von Appen Gmbh v. Wiener Allianz Versicherungs AG
[1997] CCL 993 at 1009. Furthermore, the claims for declarations make it plain
that Toepfer's application to the English court was founded on their
contractual rights.
Cargill's
Case
Cargill's
submissions can be summarised as follows:
1.
Before
the English proceedings were commenced, French proceedings had been commenced
to which the Convention applied.
2. The
Convention applies to the English proceedings.
3. The
French proceedings and the English proceedings involve the same cause of
action, within the meaning of that phrase in Article 21 of the Convention.
Accordingly, the English court is bound to stay the English proceedings until
the issue raised as to the jurisdiction of the French court has been resolved
by the French court.
4. Clause
31 of the contracts does not apply to the English proceedings; its effect in
this case is only to give exclusive jurisdiction over substantive disputes to
GAFTA arbitrators.
5. In
any event, the English court is not competent to entertain the claim for relief
brought by Toepfer in the absence of a prior arbitration award determining that
Cargill's conduct in pursuing the French proceedings constitutes a breach of
contract - see the so-called
Scott
v. Avery
clause in clause 32 of the contracts.
6. If,
contrary to the above submissions, Colman J. had a discretion to grant the
relief sought, he erred in principle in the exercise of that discretion.
Toepfer's
Case
Toepfer's
case is as follows:
1. The
French proceedings are subject to the Convention, although the determination of
the jurisdiction objection to those proceedings is not governed by the
Convention, but rather by French domestic law.
2. The
English proceedings are not subject to the Convention owing to the exception of
arbitration in Article 1(4).
3. If
the Convention applies to the English proceedings, the French proceedings and
the English proceedings do not involve the same cause of action, so that
Article 21 does not apply.
4. Article
21 has no application because the contracts are subject to exclusive English
jurisdiction clauses and Article 17 has paramount effect.
5.
The
Scott
v. Avery
clause does not apply to the English proceedings.
6.
The
manner in which Colman J. exercised his discretion cannot be attacked.
In
each case issues 1 to 3 and part of issue 4 depend on the interpretation of the
Convention; the remainder of issue 4 and issues 5 and 6 depend upon English law
and procedure. We propose to address these issues first in order to identify
the significance of the questions raised in relation to the Convention.
The
Scott v. Avery Clause
Before
Colman J. Cargill argued that Clause 32(b) precluded Toepfer from bringing the
present proceedings without first obtaining an arbitration award. This was a
submission not lacking in effrontery, having regard to their own conduct in
bringing proceedings in France. Colman J. gave it short shrift. He held at p.19:
"This
submission is, in my view, quite unsustainable. The disputes to which clause
32 applies are, on the proper construction of that clause, clearly substantive
disputes and not disputes as to compliance with the very clause itself. The
obvious purpose and meaning of the clause is that neither party can have resort
to any action or legal proceedings in respect of substantive disputes unless
and until the disputes have been referred to arbitration and an award obtained.
A dispute as to whether an anti-suit injunction should be granted in order to
cause one party to comply with the clause cannot have been intended by the
parties to have been covered by the words "any dispute arising out of or under
this contract". The arbitrators could not grant such an injunction.
An
award is therefore not a condition precedent to the claim for an injunction not
for the claim for declarations. Those declarations sought merely express the
factual bases which must be established in order to obtain the injunctions.
The determination of the existence of those facts for the purpose of obtaining
the injunctions would not, if in issue, fall within clause 32. The fact that
the plaintiffs claim declarations as relief ancillary to the injunctions does
not take (sic) issues as to those facts within clause 32."
By
"take" the Judge may have meant "make".
Mr
Tselentis, for Cargill, challenged Colman J.'s finding on this point. He
pointed out that Toepfer had already commenced an arbitration claiming damages
for Cargill's alleged breach of the arbitration agreement in starting
proceedings in France. Cargill had not admitted the alleged breach. There was
thus before the arbitrators a dispute as to whether there had been a breach of
the arbitration clause. Toepfer's application for an injunction raised
precisely the same issue and an identical dispute. That dispute had to be
referred to arbitration. Mr. Tselentis referred us to the decision of Clarke
J. in
Halki
Shipping v. Sopex Oils
[1997] 1 WLR 1268 in support of the proposition that failure by Cargill to
admit a claim, even where there were no apparent grounds upon which they could
challenge it, raised a dispute which had to be referred to Arbitration. He
also relied upon the decision of this Court in
Mantovani
v. Carapelli
[1980] 1 Lloyds Rep. 375 as demonstrating that Colman J. was in error in
confining the application of Clause 32 to substantive disputes.
The
latter case also concerned a GAFTA
Scott
v. Avery
clause, which was in essentially identical terms to that with which we are
concerned. The sellers had commenced an arbitration against the buyers but,
before obtaining an award, had brought proceedings in Italy to obtain security
for the claim advanced in the arbitration. The Court of Appeal held that this
conduct constituted a breach of the
Scott
v. Avery
clause. In the course of the leading judgment Lawton L.J. said of the clause,
at p.381:
"For
my part, I would construe the words as meaning that any form of application for
ancillary relief, and in particular that sought in Italy, was within the
arbitration clause"
He
went on to observe, however:
"In
the ordinary way, those who try to obtain ancillary relief through the Courts
will do so in England, and if they do so in England then no question of damage
can arise because under the terms of most arbitration clauses, and certainly
under the terms of clauses providing for arbitration within the jurisdiction of
the Supreme Court of Judicature, the Arbitration Act, 1950, applies. In those
circumstances, what the parties do if they seek ancillary relief within the
jurisdiction of this Court is something which the arbitration clause and the
Arbitration Act permits. In other cases it may be convenient for the parties,
and probably would be, to restrain what was being done in foreign Courts by
means of an injunction."
Megaw
L.J. agreed. He was however prepared to contemplate the possibility that an
injunction could have been sought by the buyers in England to restrain the
Italian proceedings - see p.384.
We
have not found very satisfactory an approach which, as a matter of implication,
applies a
Scott
v. Avery
clause to ancillary proceedings outside England but not to ancillary
proceedings within the English court. Be that as it may, we are satisfied
that, as a matter of construction, a
Scott
v. Avery
clause cannot apply to injunctive proceedings brought for the purpose of
enforcing the clause itself. Insofar as an issue arises, it is likely to be as
to whether or not the substantive dispute falls within the jurisdiction of the
arbitrators, which is not a suitable issue for determination by the arbitrators
themselves. More significantly, an injunction does not fall within the relief
that arbitrators are in a position to provide. For these reasons, which are
narrower than those of the Judge, we hold that the
Scott
v. Avery
clause in Clause 32 did not preclude Colman J. from entertaining the claim for
relief that was before him.
The
exclusive jurisdiction clause
Colman
J.'s finding in relation to the application of Clause 31 dovetailed neatly with
his view of the effect of the
Scott
v. Avery
provision in Clause 32. The vital words of Clause 31 are:
"the
Court of England or arbitrators appointed in England, as the case may be,
shall.... have exclusive jurisdiction over all disputes which may arise under
this contract."
Colman
J. held that the effect of these provisions was to share between the English
Court and the arbitrators exclusive jurisdiction over all disputes. Those
disputes which went to substance fell within the exclusive jurisdiction of the
GAFTA arbitrators whereas disputes in relation to ancillary matters fell within
the exclusive jurisdiction of the English Court. Thus, in relation to Clause
31, he held at p.15:
"The
effect of that clause, read together with clause 32, is that the English courts
are to have exclusive jurisdiction in all matters except those falling within
the ambit of the arbitration agreement and relating to enforcement of awards.
That would include applications for injunctive relief to enforce the
arbitration agreement."
Mr.
Tselentis challenged this conclusion. He submitted that Clause 31 provided
alternative jurisdictional regimes, applicable to all disputes covered by that
clause. We agree. Just as we would, if permitted, construe Clause 32 as
relating to disputes of substance, rather than in relation to ancillary relief,
so also we are of the view that Clause 31 applies to disputes of substance. We
do not consider that Clause 31 must be construed as tailored to fit with Clause
32. If the draftsman had wished to apportion jurisdiction between the Court
and arbitrators we do not believe that he would have done so in this way. We
consider that Clause 31 is designed to apply where the contract provides for
arbitration and also where it does not. Where, as here, the Contract includes
Clause 32, the alternative provision in Clause 31 for exclusive jurisdiction of
the English Court does not take effect. Thus we differ from the conclusion of
Colman J. that proceedings to enforce the Arbitration clause were, by Clause
31, agreed to be subject to the exclusive jurisdiction of the English Court.
The present proceedings are not subject to an agreed exclusive English
jurisdiction.
Discretion
The
1958 New York Convention on the Recognition and Enforcement of Foreign Arbitral
Awards Article II.3 requires the Court of a contracting State to refer the
parties to arbitration when an action is commenced in disregard of a binding
arbitration clause. It might be thought that there would be much to be said,
both as a matter of comity and in the interests of procedural simplicity, if a
Defendant who was improperly sued in disregard of an arbitration agreement in
the Court of a country subject to the New York Convention were left to seek a
stay of the proceedings in the Court in question. It seems, however, that
litigants in cases governed by English arbitration clauses are not prepared to
trust foreign Courts to stay proceedings in accordance with the New York
Convention, for it has become the habit to seek anti-suit injunctions such as
that sought in the present case. In the
Angelic
Grace
[1995] 1 Lloyds Rep. 87 the Court of Appeal gave its approval to this practice.
In the course of his judgment, Millett L.J. said at p. 96:
"In
my judgment, the time has come to lay aside the ritual incantation that this is
a jurisdiction which should only be exercised sparingly and with great caution.
There had been many statements of great authority warning of the danger of
giving an appearance of undue interference with the proceedings of a foreign
Court. Such sensitivity to the feelings of a foreign Court has much to commend
it where the injunction is sought on the ground of forum non conveniens or on
the general ground that the foreign proceedings are vexatious or oppressive but
where no breach of contract is involved. In the former case, great care may be
needed to avoid casting doubt on the fairness or adequacy of the procedures of
the foreign Court. In the latter case, the question whether proceedings are
vexatious or oppressive is primarily a matter for the Court before which they
are pending. But in my judgment there is no good reason for diffidence in
granting an injunction to restrain foreign proceedings on the clear and simple
ground that the defendant has promised not to bring them."
While
we would not wish it to be thought that we have independently endorsed these
sentiments, in view of this decision we feel obliged to hold that Colman J. did
not err in principle in the exercise of his discretion when granting an
injunction in this case. The point will be open to argument in a higher
tribunal.
The
Consequence of our findings
Our
finding in relation to the
Scott
v. Avery
clause rejects the argument that the English Court is precluded, by the terms
of the contracts, from entertaining the present proceedings. Our
interpretation of Clause 31 (the exclusive jurisdiction clause) has the result
that Article 17 is of no benefit to Toepfer. If the point had arisen, we would
have been bound to hold that Article 17 overrides Articles 21 and 22 of the
Convention. This is because it has been so held by this Court in
Continental
Bank v. Aeakos
[1994] 1 WLR 588. That decision has provoked widespread controversy and it is,
perhaps, a pity that these proceedings are unlikely to provide an occasion for
its review.
We
now turn to outline the issues which arise in relation to the Convention.
The
Convention issues
The
foundation of the challenge to the jurisdiction of the French Court that
Toepfer has made pursuant to Section 1458 of the civil code in the French
proceedings is founded on the allegation that the substantive dispute is
subject to an exclusive English jurisdiction agreement. The object of that
challenge is to prevent the French Court from exercising jurisdiction. The
basis of the application for relief in the English proceedings is the same, as
is, broadly speaking, its object. Cargill allege that both the French and the
English proceedings raise the same cause of action and that, as the French
Court was seized first, Article 21 of the Convention requires the English Court
to stay the English proceedings until the issue of the jurisdiction of the
French Court has been resolved in the French proceedings. Toepfer contend that
Cargill's case is unsound for two reasons:
(i) Proceedings
to determine the validity of an arbitration clause fall within the Article 1(4)
exception, so that the Convention does not apply.
(ii) the
cause of action in the French proceedings is not the same as the cause of
action in the English proceedings.
Both
these contentions raise difficult questions of interpretation of the Convention
and the former, in particular, has given rise to a conflict of academic views
and legal decisions. It may be helpful if we briefly identify some of these.
Proceedings
to determine the validity of an arbitration clause
The
Jenard Report (OJ C59 5.3.79 p.13) states in relation to Article 1(4):
"The
Brussels Convention does not apply to the recognition and enforcement of
arbitral awards (see the definition in Article 25); it does not apply for the
purpose of determining the jurisdiction of courts and tribunals in respect of
litigation relating to arbitration - for example, proceedings to set aside an
arbitral award; and, finally, it does not apply to the recognition of judgments
given in such proceedings."
Similarly
the Schlosser Report (OJ C59 5.3.79 p.93) states:
"In
the same way a judgment determining whether an arbitration agreement is valid
or not, or because it is invalid, ordering the parties not to continue the
arbitration proceedings, is not covered by the 1968 Convention."
The
Evrigemis and Kerameus Report (OJ C 298 24.11.86 p.10) states, however:
"...the
verification, as an incidental question, of the validity of an arbitration
agreement which is cited by a litigant in order to contest the jurisdiction of
the court before which he is being sued pursuant to the Convention, must be
considered as falling within its scope."
In
The
Atlantic Emperor (No 1)
[1991] ECR 1-3855 Advocate General Darmon expressed the following opinion at
p.3886:
"Judgments
given in response to an objection of lack of jurisdiction raised in order to
resist a substantive claim likewise hardly qualify for international
recognition, since their direct purpose is to give a decision as to the
jurisdiction of the national court which delivers them. By contrast, it seems
legitimate for a judgment which is given at the place where the arbitral
tribunal is sitting and which gives a decision, as a main issue, on the
arbitrator's jurisdiction (either as a declaratory judgment or in the context
of an action for annulment) to be recognised, on certain conditions, in other
countries. Admittedly, the place of arbitration is often accidental and
unrelated to the substance of the dispute. But that in itself ensures the
all-important neutrality. In any event there is no alternative if the aim is
to endeavour to centralize control in order to harmonize decisions at
international level."
The
European Court left undecided, however, whether a free-standing dispute as to
the existence or validity of an arbitration clause falls within the Article
1(4) exclusion.
Since
then there has been discussion and disagreement as to the ambit of the Article
1(4) evidenced by the following cases:
The
Heidberg
[[1994] 2 Lloyds Rep. 287;
The
Angelic Grace
[1994] 1 Lloyds Rep. 168;
The
Xing Su Hai
[1995] 2 Lloyds Rep. 15;
Toepfer
v. Molino Boschi
[1996] 1 Lloyds Rep. 510 and
Lexmar
v. Nordisk
[1997] 1 Lloyds Rep. 289.
The
cause of action in Article 21
On
Cargill's argument, the French proceedings involve two "causes of action"
within the meaning of that phrase in the English version of Article 21 - the
substantive claim for damages and the procedural dispute in relation to the
arbitration clause. Cargill contend that the English proceedings involve the
second cause of action and that Article 21 applies accordingly. It seems to us
that a question arises as to whether a dispute as to jurisdiction can properly
be categorised as a "cause of action" at all. The scheme of the Convention
appears to anticipate that a dispute as to the jurisdiction of a court to
entertain a substantive dispute will arise either by way of a challenge to
jurisdiction in the court first seized or by reason of the commencement of
proceedings involving the same substantive dispute before a second court. Mr
Tselentis conceded in argument that, had Toepfer not challenged the
jurisdiction of the French Court, he would have had no case to advance under
Article 21. It seems to us, however, in fundamental conflict with the scheme
of the Convention that a Defendant before the Court first seized should,
without entering a challenge to jurisdiction in that Court, be able to commence
proceedings in a second Court in order to challenge the jurisdiction of the
Court first seized.
These
questions apart, it seems to us that a nice question arises as to whether one
can equate, as a cause of action under Article 21, a procedural objection under
the domestic civil code in the French Court with a claim for relief based on an
allegation of breach of contract in the English Court. While the form is
totally different, the principal issue - the existence of a binding arbitration
agreement - is the same. So is the object of each proceeding - the restraint
of the substantive hearing before the French Court. We do not believe that
Overseas
Union v. New Hampshire
[1992] 1 QB 434 and
The
Maciej Rataj
[1995] 1 Lloyds Rep 302 provide a clear answer to these questions.
For
these reasons, we refer for the ruling of the European Court the following
questions:
1. Does
the exception in Article 1(4) of the Brussels Convention extend to proceedings
commenced before the English Courts seeking:
(a) a
declaration that the commencement and continuation of proceedings before a
French Court constitutes a breach of an arbitration agreement;
(b) an
injunction restraining the Appellants from continuing the proceedings before
the French Court, or instituting any further proceedings before any other
Court, in breach of the arbitration agreement.
If
not,
2. Do
such proceedings constitute the same cause of action as a challenge to the
jurisdiction of the French Court founded on the same arbitration agreement, so
as to require the English Court to stay the proceedings pursuant to Article 21
of the Convention?
ORDER:
Appeal referred to the European Court.